office timeline 3.62 crack  - Activators Patch

Influence of Crack Width of Micro-cracks on Permeability and. Capillary Suction. Civil Engineering Department, Stellenbosch University, South Africa. (2) THAT update in relation to the Working Class Movement Library be supported by Greater Manchester Mayor Andy Burnham's office to. manage capital costs, but severely limits execution timeline; and 2) large sites MMSD's Budget and Finance office's rate study mentioned previously.

: Office timeline 3.62 crack - Activators Patch

3DMark 2.19 Crack With Serial Key Latest 2021 Free
Movavi video editor 20.3.0 crack - Activators Patch
OVERLOUD TH-U - ACTIVATORS PATCH
Luminar 4.4.3 Crack + Activation Code Free Download 2021
YTD VIDEO DOWNLOADER FULL VERSION - CRACK KEY FOR U

Marquee Ser.: Microsoft Office 2013-With CD

Marquee Ser.: Microsoft Office 2013-With CD Fixed, solved 12/12/13Greetings. I have a fairly new laptop 2013 with Windows 8.0 pre-installed. I installed Office 2010 and other software programs such as Adobe, Quickbooks, etc. months ago and have had no problems operating any of the programs.US20060143175A1 - System and method for automatically.For example, “Microsoft office” would be marked as “Yes” if the intent was to allow the shorter term “Microsoft” to also be identified within it. Term type 550 specifies whether the feature is an ORG, LOC, PERSON, TERM, or XML_REGION_TAG, and TermID 560 indicates whether the feature originated from term list 20 or feature list 30.Mini Kms Activator Office 2010 - clan-archives34.This KMS activator mini-KMS Activator v1.053 will allow you to activate any version of Microsoft Office 2010 Microsoft Office 2010 Activator All Versions. One account. All of Google. Shared publicly - 2015-06-18MICROSOFT OFFICE 2013 PLUS ACTIVATION KEYColor Strip PowerPoint Template DesainPeg Bokeh PowerPoint Template is another free background for Microsoft PowerPoint that you can download for free from Marilyn Santos New Free Powerpoint PresentationTemplates Country House Wedding Venues Wedding Reception Venues Wedding Ceremony Wedding Walkway Wedding Themes Garden Wedding Decorations Wedding Marquee Decoration.

Microsoft Word 2016 Crack With Serial Key Free Download " data-medium-file="https://i2com/crackfullpatch.com/wp-content/uploads/2018/10/images-2.png? fit=300,168&ssl=1" data-large-file="https://i2com/crackfullpatch.com/wp-content/uploads/2018/10/images-2.png? fit=300,168&ssl=1" class="alignnone size-medium wp-image-1503 aligncenter" src="https://i2com/crackfullpatch.com/wp-content/uploads/2018/10/images-2.png? resize=300,168&ssl=1" alt="Microsoft Word 2016 Crack With Serial Key Free Download" width="300" height="168" data-recalc-dims="1" / Microsoft Office 2016 With Activation Free Download Microsoft Office 2016 Product Key is a vital refresh to what is, for most clients, a significant business tool. Changes to the program’s UI make it simple for anybody to switch from Word to a Mac to Word on some other stage with an insignificant transitional bend. Word’s joint effort highlights make it feasible for business clients to take a shot at the registering stage of their picking without making noteworthy repentance. Microsoft Word takes care of business without acting as a burden, If Word is your essential apparatus for completing work. Hey Everyone One the Internet This Is Sahil Here Again, Today I Am Going to Share a Very Useful Trick to Use Any Version of Microsoft Office Free for Lifetime,yes You Can Have Any Microsoft Office Version You Want for Free.i Know Many of People Want Their Home, Office, Business Work to Be Done and Depended Only on Microsoft Office So Many of People Have Already Installed and Activated Microsoft Office on Their PC but Many of Them People Do Not Have Yet or They Have Formatted Their PC. Microsoft office 2016 product key is a word handling program that is a piece of the Microsoft Office suite. This program enables you to make excellent, proficient looking reports utilizing the most excellent record arranging apparatuses. It assists you to make, alter, spare, share, and get to records online from any web program. You will discover that the Microsoft Windows 2016 for both frameworks is very comparable, despite the fact that there are some Mac-just components, which we’ll go top to bottom later. There have not been any significant updates when contrasted with its forerunner, Word for Mac in 2011. After the Microsoft Windows itself, the most broadly known and utilized app of Microsoft is presumably Microsoft Word, in some form. Effortlessly the most well-known Word Processor since its first beginning more than 30 years back, you would be unable to locate a home or office without it. Microsoft Office 2016 product key is the best product which is produced by Microsoft. Without any doubt, it is the most used and reliable application for official and documentation management. The brand new Microsoft Office 2016 for Windows includes updated editions of MS Excel, MS Word, MS Power Point and MS One Note. And all these modules have been updated with new features and function used in this version. It simultaneously works on laptop, tablet or smartphone. Microsoft Office 2016 Product Key is already tested and we are providing perfectly working product key. If you work with Office 365 and you simply want to upgrade to Microsoft Office 2016 product Key than you are in the right place. It really is the best version of the Microsoft is the office suite. Microsoft Office 2016 pro product key has the best user experience. Among its exceptional and noteworthy features the simplified built-in file sharing, latest updates, and the very friendly user interface. Microsoft office 2016 is useful and handy as compared to its prior version. Office 2016 allows its user to work on same simultaneously, using some built-in tools to help August 31, 2021 - Free Activators along. It stimulates you to share documents online, in a collaborative workspace. Microsoft Office Is an Office Suite of Applications, Servers, and Services Developed by Microsoft. Initially a Marketing Term for a Bundled Set of Applications, the First Version of Office Contained Microsoft Word, Microsoft Excel, and Microsoft Power Point. Over the Years, Office Applications Have Grown Substantially Closer With Shared Features Such as a Common Spell Checker, Ole Data Integration and Visual Basic for Applications Scripting Language. This production set structures both the best facilities in the previous forms and some new and better competences as well. Collected, they make this publication the best concerning actual user practice. Within the production, set is Word 2016, Power Point 2016, Excel 2016, One Note, Outlook, Visio, and Project 2016. Between its extraordinary and notable structures are shortened and combined file sharing, huge updates to logical systems, and the current user interface. Office staffs and workers best use Microsoft Office 2016 Crack. There are numerous enhancements to core utilities used to ease document treating, formation, and management. The mathematical utilities have better and additional combined within the comparisons for use in Power Point, Excel, and Word. There is also the Timeline screening which has also improved, and it now derives with the choice to view various instances. The production set also structures a higher DPI presence which allows users to yield and make crisp and strong documents on more top screen determination.This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, scanning or otherwise, except as permitted under Sections 107 or 108 of the 1976 United States Copyright Act, without either the prior written permission of the Publisher, or authorization through payment of the appropriate per-copy fee to the Copyright Clearance Center, Inc. Report DMCA Microsoft Official Academic Course MICROSOFT EXCEL 2016 Includes coverage of the following Microsoft Office Specialist (MOS) exam: MOS EXAM 77-727: EXCEL 2016 II  This book was set in Garamond by Box Twelve Communications. 222 Rosewood Drive, Danvers, MA 01923, (978) 750-8400, fax (978) 646-8600. Requests to the Publisher for permission should be addressed to the Permissions Department, John Wiley & Sons, Inc., 111 River Street, Hoboken, NJ 07030-5774, (201) 748-6011, fax (201) 748-6008. To order books or for customer service, please call 1-800-CALL WILEY (225-5945). Microsoft, Active X, Excel, Info Path, Microsoft Press, MSDN, One Note, Outlook, Pivot Chart, Pivot Table, Power Point, Share Point, SQL Server, Visio, Windows, Windows Mobile, and Windows Server are either registered trademarks or trademarks of Microsoft Corporation in the United States and/or other countries. Other product and company names mentioned herein may be the trademarks of their respective owners. The example companies, organizations, products, domain names, e-mail addresses, logos, people, places, and events depicted herein are fictitious. No association with any real company, organization, product, domain name, e-mail address, logo, person, place, or event is intended or should be inferred. The book expresses the author’s views and opinions. The information contained in this book is provided without any express, statutory, or implied warranties. Neither the authors, John W ­ iley & Sons, Inc., Microsoft Corporation, nor their resellers or distributors will be held liable for any damages caused or alleged to be caused either directly or indirectly by this book. Information and views expressed in this document, including URL and other Internet Web site references, may change without notice. Some examples depicted herein are provided for illustration only and are fictitious. Microsoft and the trademarks listed at trademarks of the Microsoft group of companies. No real association or connection is intended or should be inferred. All other marks are property of their respective owners. ISBN: 978-1-11-927299-1  III WILEY END-USER LICENSE AGREEMENT This End-User License Agreement (the “Agreement”) is a legal agreement between you and John Wiley & Sons, Inc. (“Wiley”) for the Wiley proprietary material (the “Licensed Material”) that you may have licensed through a third party or from Wiley directly. Your use of the Licensed Materials indicates your acceptance of the terms and conditions of this Agreement. License Wiley hereby grants you, and you accept, a non-exclusive and non-transferable license to view, use and display the Licensed Material on the following terms and conditions only: a. You acknowledge that the Licensed Material is being licensed to you and use is subject to the terms and conditions of this Agreement. The Licensed Material is for your personal use only. You may use the Licensed Material only on the number of devices permitted by the license terms set forth elsewhere and/or the Digital Rights Management (“DRM”), if any. You may not copy/paste/print the Licensed Material except as expressly permitted by the license terms set forth elsewhere and/or the DRM, if any. You may not upload, copy, modify, print, transmit, transfer, sublicense, sell, make or distribute copies of the Licensed Material in whole or in part. If you transfer possession of any copy or modification of the Licensed Material to any third party, your license is automatically terminated and any attempt to sell or otherwise transfer the Licensed Material shall be null and void. Such termination will be in addition to and not in lieu of any equitable, civil, or other remedies available to Wiley. If you accessed the Licensed Material from a third party website or using a device which requires you to accept any other user agreement, you are bound by both this Agreement and any third party website or device-specific agreement. In the event of a conflict between this Agreement and any third party agreement, the more restrictive terms will apply. If the website or device applies any form of Digital Rights Management (“DRM”) to the Licensed Material, you may not disable or remove that DRM. You agree that any materials in print format that may be included with this license (for example, materials printed on demand) or portions thereof ordered or printed from any third party platform are licensed for your personal use only and may not be transferred or sold under any condition. All terms of this Agreement also apply to these print materials. Term This Agreement shall terminate upon the conditions discussed elsewhere in this Agreement, or if you fail to comply with any term or condition of this Agreement. Upon such termination, you agree to immediately discontinue all access to the Licensed Material. IV  Wiley’s Rights You acknowledge that all rights (including without limitation, copyrights, patents and trade secrets) in the Licensed Material are the sole and exclusive property of Wiley and/or its licensors. By accepting this Agreement, you do not become the owner of the Licensed Material, but you do have a limited license to use it in accordance with the provisions of this Agreement. You agree to protect the Licensed Material from unauthorized use, upload, download, reproduction, or distribution. You further agree not to translate, decompile, disassemble or otherwise reverse engineer the Licensed Material. DISCLAIMER LICENSED MATERIAL(S) ARE PROVIDED “AS IS,” WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. THE ENTIRE RISK AS TO THE RESULTS OR PERFORMANCE, AND THE COST OF ALL NECESSARY SERVICING, REPAIR, OR CORRECTION OF THE LICENSED MATERIAL IS ASSUMED BY YOU. IN NO EVENT WILL WILEY OR ITS LICENSORS BE LIABLE TO YOU FOR ANY DAMAGES, INCLUDING WITHOUT LIMITATION LOST PROFITS, LOST SAVINGS, OR OTHER INCIDENTAL OR CONSEQUENTIAL DAMAGES ARISING OUT OF THE USE OR INABILITY TO USE THE LICENSED MATERIAL(S). General This Agreement represents the entire agreement between us and supersedes any prior Agreements, oral or written, and any other communication between us relating to the subject matter of this Agreement. This Agreement will be governed and construed as if wholly entered into and performed within the State of New York. You acknowledge that you have read this Agreement, and agree to be bound by its terms and conditions.  V Preface Welcome to the Microsoft Official Academic Course (MOAC) program for Microsoft Office 2016. MOAC represents the collaboration between Microsoft Learning and John Wiley & Sons, Inc. Microsoft and Wiley teamed up to produce a series of textbooks that deliver compelling and innovative teaching solutions to instructors and superior learning experiences for students. Infused and informed by in-depth knowledge from the creators of Microsoft Office and Windows, and crafted by a publisher known worldwide for the pedagogical quality of its products, these textbooks maximize skills transfer in minimum time. Students are challenged to reach their potential by using Express VPN 2020 Activation Code new technical skills as highly productive members of the workforce. Because this knowledgebase comes directly from Microsoft, architect of the Office 2016 system and creator of the Microsoft Office Specialist (MOS) exams, you are sure to receive the topical coverage that is most relevant to students’ personal and professional success. Microsoft’s direct participation not only assures you that MOAC textbook content is accurate and current; it also means that students will receive the best instruction possible to enable their success on certification exams and in the workplace. THE MICROSOFT OFFICIAL ACADEMIC COURSE PROGRAM The Microsoft Official Academic Course series is a complete program for instructors and institutions to prepare and deliver great courses on Microsoft software technologies. With MOAC, we recognize that, because of the rapid pace of change in the technology and curriculum developed by Microsoft, there is an ongoing set of needs beyond classroom instruction tools for an instructor to be ready to teach the course. The MOAC program endeavors to provide solutions for all these needs in a systematic manner in grammarly full version crack - Crack Key For U to ensure a successful and rewarding course experience for both instructor and student—technical and curriculum training for instructor readiness with new software releases; the software itself for student use at home for building hands-on skills, assessment, and validation of skill development; and a great set of tools for delivering instruction in the classroom and lab. All are important to the smooth delivery of an interesting course on Microsoft software, and all are provided with the MOAC program. VI  Book Tour PEDAGOGICAL FEATURES The MOAC courseware for Microsoft Office 2016 system are designed to cover all the learning objectives for that MOS exam, which is referred to as its “objective domain.” Many pedagogical features have been developed specifically for Microsoft Official Academic Course programs. Presenting the extensive procedural information and technical concepts woven throughout the textbook raises challenges for the student and instructor alike. Following is a list of key features in each lesson designed to prepare students for success on the certification exams and in the workplace: • Each lesson begins with a Lesson Skill Matrix. More than a standard list of learning objec- tives, the skill matrix correlates each software skill covered in the lesson to the specific MOS exam objective domain. This feature provides an overview of the software features students will be working with in the lesson. The orientation will detail the general properties of the software or specific features, such as a ribbon or dialog box; and it includes a large, labeled screen image. • Concise and frequent Step-by-Step instructions teach students new features and provide an opportunity for hands-on practice. Numbered steps give detailed, step-by-step instructions to help students learn software skills. The steps also show results and screen images to match what students should see on their computer screens. • Illustrations: Screen images provide visual feedback as students work through the exercises. The images reinforce key concepts, provide visual clues about the steps, and allow students to check their progress. • Knowledge Assessment: Provides questions from a mix of True/False, Fill-in-the-Blank, and Multiple Choice, testing students on concepts learned in the lesson. • Projects: Provide progressively more challenging lesson-ending activities. • Online files: The student companion website contains the data files needed for each lesson.  VII Instructor Support Program The Microsoft Official Academic Course programs are accompanied by a rich array of resources that incorporate the extensive textbook visuals to form a pedagogically cohesive package. These resources provide all the materials instructors need to deploy and deliver their courses. Resources available online for download include: • The Instructor’s Guides contain Solutions to all the textbook exercises as well as chapter summaries and lecture notes. The Instructor’s Guides are available from the Instructor’s Book Companion site. • The Solution Files for all the projects in the book are available online from our Instructor’s Book Companion site. • A complete set of Power Point presentations is available on the Instructor’s Book Companion site to enhance classroom presentations. Tailored to the text’s topical coverage and Skills Matrix, these presentations are designed to convey key concepts addressed in the text. • The Student Data Files are available online on both the Instructor’s Book Companion site and for students on the Student Book Companion site. Student Data Files COPYING THE PRACTICE FILES Your instructor might already have copied the practice files before you arrive in class. However, your instructor might ask you to copy the practice files on your own at the start of class. Nielsen has worked in the publishing industry for more than 25 years as an author, development editor, technical editor, and project manager, specializing in Microsoft Office, Windows, Internet, and general technology titles for leading educational and retail publishers. Also, if you want to work through any of the exercises in this book on your own at home or at your place of business after class, you may want to copy the practice files. She is the author or co-author of over 40 computer books and has edited several hundred IT publications and more than two thousand online articles. Joyce also worked as a research analyst for a major shopping mall developer, where she developed and documented spreadsheet and database applications used nationwide. She holds a Bachelor of Science degree in Quantitative Business Analysis from Indiana University’s Kelley School of Business in Bloomington. Microsoft Office 2016 Software This content was created using the Office 2016 Professional desktop version. If you have signed up for Office 365, some features may be added or updated.  Brief Contents LESSON 1: OVERVIEW 1 LESSON 2: WORKING WITH MICROSOFT EXCEL 2016 12 LESSON 3: USING OFFICE BACKSTAGE 35 LESSON 4: USING BASIC FORMULAS 49 LESSON 5: USING FUNCTIONS 63 LESSON 6: FORMATTING CELLS AND RANGES 70 LESSON 7: FORMATTING WORKSHEETS 97 LESSON 8: MANAGING WORKSHEETS 115 LESSON 9: WORKING WITH DATA AND MACROS 132 LESSON 10: USING ADVANCED FORMULAS 170 LESSON 11: SECURING AND SHARING WORKBOOKS 196 LESSON 12: CREATING CHARTS 216 LESSON 13: ADDING PICTURES AND SHAPES TO A WORKSHEET 247 APPENDIX A 271 INDEX 275 IX Overview wise care 365 portable - Crack Key For U LESSON SKILL MATRIX Skills Exam Objective Objective Number Starting Excel Create a workbook. 1.1.1 Working in the Excel Window Customize the Quick Access Toolbar. 1.4.3 Changing Workbook and Window Views Change workbook views. 1.4.4 1.4.5 Working with an Existing Workbook Navigate to a named cell, range, or workbook element. 1.2.2 SOFTWARE ORIENTATION Microsoft Excel’s Opening Screen Microsoft Office Excel 2016 provides powerful tools that enable users to organize, analyze, manage, and share information easily. The foundation of Excel and locations where you do your work are cells, rows, and columns within a worksheet, and worksheets as part of a workbook. Many of the tools you use while working in Excel are located on the ribbon that displays across the top of the window. The ribbon is organized into task-oriented command tabs. Each tab is divided into task-specific command groups with commands and options that relate to the group name. Because you can customize the ribbon and new tabs might appear, such as the Developer and Add-Ins tabs, your screen might appear different than Figure 1-1. Quick Access Toolbar Command tabs Title bar File tab Ribbon Name Box Active cell Formula bar Column labels Row labels Worksheet tab Figure 1-1 Excel’s Blank workbook 1 2 Lesson 1 STARTING EXCEL To work efficiently in Microsoft Excel, you need to become familiar with its primary user interface. You can open Microsoft Excel 2016 in Windows 10 by moving to the lower-left corner of your screen, clicking on Start, clicking All apps, and then clicking Excel 2016. Excel opens to a list of templates and in most cases you choose Blank workbook or open a previous file. A workbook, or spreadsheet file, is shown in Figure 1-1. Think of a workbook as a physical book with many pages. The filename (Book1) and the program name (Excel) appear in the title bar at the top of the screen. Book1 (or Book2, Book3, and so on) is a temporary title for your workbook until you save the workbook with a name of your choice. Take Note If you use Excel often, you will want to pin the application to the Start menu. The new workbook contains one worksheet (Sheet1) by default—similar to the first page in a book—where you enter information. A blank workbook opens, and the worksheet named Sheet1 is displayed as shown previously, in Figure 1-1. From the All apps menu, right-click the app name, and choose Pin to Start. If a workbook has more pages (or worksheets), you use the sheet tabs that are located just above the Status bar and are identified as Sheet1, Sheet2, and Sheet3. In the list of applications, scroll down as necessary and click Excel 2016. Figure 1-2 Microsoft Excel’s opening screen Recent files you’ve opened (if any) Click other templates to see what you can do in Excel or to start with an example. You can also choose More and then Pin to taskbar to allow you to click the icon in the Windows taskbar at the bottom of the screen to start Excel. You can rename worksheets to identify their content and add worksheets with the New sheet ( ) button as needed. The Excel window opens to display recent Excel files you’ve opened and examples of templates you can use (see Figure 1-2). A worksheet is a grid composed of rows, columns, and cells. Opening Excel In this exercise, you learn to use the Start menu to open Excel and view the new workbook’s blank worksheet. Be sure Microsoft Excel is installed on your computer. With the Windows desktop displayed, click the Start button in the lower-left corner of the Windows 10 screen. Each worksheet column starts at microsoft toolkit 2.6.7 download filehippo top of the worksheet and goes to the bottom of the worksheet and is identified by a letter. Each row starts at the left edge of the worksheet and continues to the right and is identified by a number. Each box, or cell, on the grid is identified by the intersection of a column and a row. You enter information by typing it into the selected or active cell, which is outlined by a bold rectangle. This is also called the current or highlighted cell. WORKING IN THE EXCEL WINDOW When you launch Excel and click Blank workbook, the program opens a new workbook and displays a blank worksheet. You just learned about some of the most important components of the Excel worksheet such as rows, columns, and cells. In this section, you explore the Excel window and learn to identify and customize the Quick Access Toolbar, the ribbon, and other important onscreen tools and components. You also learn to open and use Backstage view, which provides access to file management commands. Using the Onscreen Tools The Quick Access Toolbar gives you fast and easy access to the tools you use most often in any given Excel session. It appears on the left side of the title bar, above the ribbon (although you can move the toolbar below the ribbon if you want it closer to your work area). You can add and remove commands to and from the toolbar so that it contains only those commands you use most frequently. In this lesson, you learn to move and customize the Quick Access Toolbar by adding and removing commands. You also learn how to use Screen Tips, which are small, onscreen boxes that display descriptive text when you rest the pointer on a command or control. USE the blank workbook you opened in the previous exercise to perform these steps: 1. Point PC Cleaner Pro 2021 Crack + License Code Free Download each icon on the Quick Access Toolbar and read the description that appears as a Screen Tip. Take Note Use Screen Tips to remind you of a command’s function. Enhanced Screen Tips display in a larger box that contains more descriptive text than a Screen Tip. Most Enhanced Screen Tips contain a link to a Help topic. On the right side of the Quick Access Toolbar, click the drop-down arrow. The Open icon is added to the Quick Access Toolbar. Click the down arrow again and select Quick Print from the drop-down list (see Figure 1-3). 4 Lesson 1 Figure 1-3 Customizing the Quick Access Toolbar 3. Next, right-click anywhere on the Quick Access Toolbar and then select Show Quick Access Toolbar Below the Ribbon. Right-click the Home tab and click Collapse the Ribbon. Now, only the tabs remain on display, increasing the workspace area. Right-click the Home tab again and choose Collapse the Ribbon to uncheck the option and make the ribbon commands visible again. On the right side of the Quick Access Toolbar, which now appears below the ribbon, click the drop-down arrow. Click Show Above the Ribbon from the drop-down list. Right-click the Open command and select Remove from Quick Access Toolbar. On the right side of the Quick Access Toolbar, click the drop-down arrow and click Quick Print to remove the checkmark from the menu and thus remove the Quick Print icon from the Quick Access Toolbar. By default, the Quick Access Toolbar contains the Save, Undo, and Redo commands. Take Note To add commands to the Quick Access Toolbar that do not appear in the drop-down list, click More Commands on the drop-down list. You can also rightclick the Quick Access Toolbar or any ribbon tab and select Customize Quick Access Toolbar to open the Excel Options dialog box. As you work in Excel, customize the Quick Access Toolbar so that it contains the commands you use most often. In the lower-right corner of the Font group, click the Dialog Box Launcher arrow. Do not, however, remove the Undo and Redo commands. The Format Cells dialog box shown in Figure 1-4 opens. Notice the difference in appearance between this number and the one you entered in cell A1. These commands are not available on the ribbon’s command tabs. In most cases, your default font in Excel will be Calibri, 11 point, without bold or italic. Notice that the Font tab of the dialog box is active. Overview 5 CHANGING WORKBOOK AND WINDOW VIEWS On the ribbon, the View tab holds commands for controlling the appearance of the displayed workbook. Scroll down in the Font list, click Cambria, and then click OK. You can also open and arrange new windows and split windows for side-by-side views of different parts of your workbook. Changing the Workbook View Some groups on the ribbon tabs have an arrow in their lower-right corner called a Dialog Box Launcher. Clicking the arrow opens a dialog box or a task pane containing more options for that particular group of commands. In this exercise, you learn how to use the View tab commands in the Workbook Views group to change Excel’s workbook view.

Источник: http://buiclksvsk.ddns.net/marquee-ser-microsoft-office-2013-with-cd.html
Yahoo Answers eztv.ag :: 492 Mb. Techno Forum Download free 4.62 zmud [full version] monova.org :: 453 Mb. Today Software Free zmud 4.62 download on Pinterest thepiratebay.org :: 277 Mb. Open Source Software for running Windows applications on other operating systems. Zugg Software :: Downloads - zMUD. The Home site for Zugg Software. Category Last File Files; zMUD Plugins Plugins for the zMUD program Sub Category: None. forums.zuggsoft.com/index.php?page=4&action=. -翻译此页. Results 1 - 20 of 6000. If you search for Zmud 7.21 Crack, you will often see the word "crack" amongst the results which means it allows you to unlock the full version of the software. s/n: (1001) Key: (558074) Keywords: zmud 7.21 crack; zmud crack; zmud 4.62; zmud crack; zmud 4.62 download; zmud 5.55; zmud 7.04; zmud. Nevertheless, I've been looking around for a good, free (e.g. not ZMud etc.) MUD client that. 4.62 may be "free", but your odds of getting the automapper to work without crashing are roughly 50/50. But when you get to niche software like this, the best place is to ask the community surrounding the niche. Yooo! I had a thought that might create som debate! Why is cmud or zmud never mentioned in mud recommended clients? Even outdated the are far. I was always partial to zmud 4.62 which was the only free one for years. But once I started doing advanced. Further there is the issue that you must innovate to sell software and there isn't any benefit to client innovation if there is no server innovation that requires it. I don't understand the opposition to open. zMUD 7.21 + crack • zMUD 7.21 crack • pliki użytkownika kostkowy9 przechowywane w serwisie Chomikuj.pl • zmud721.exe, Zmud721Crack.exe. HOW TO CRACK ZMUD 4.62 By +Sync Expiring Registration Codes - A New Breed Software: www.zuggsoft.com/zmud This was requested by someone so I. software gigabyte zMUD (7.21.0.0) get torrent tpb windows zip: official zMUD (7.21.0.0) 1337x philippine without virus nulled: GMA Games - VIPMud 2.0 WineHQ - zMUD 4.62 MUD client - Wikipedia disherzmudfdis282 - hub.docker. Download zMUD for Windows now from Softonic: 100% safe and virus free. Zmud 4.62 中文免安裝破解版, 解壓縮密碼: heros.muds.net:8888. 檔案說明:無. 下載點:. 載點一 (本地下載). 有鑒於不少玩家不熟悉Zmud,為了選Char而痛苦,在此放出選Char Tri的.mud 檔案,. 進入登入畫面時,選擇Settings->Load載入設置完成id,pw之後進入Attr 設置的地方按enter就開始跑了內建為定力上上悟性上上Str上上/上. Regular Search Results. zmud 4.62 download in game name. zMUD 7.21. zMUD is the fastest and most versatile MUD/Telnet client for PC/Windows. License: Shareware Genre: Puzzles

4.62 software zmud


http://bytro.ru/46?keyword=462-software-zmud&charset=utf-8&source=telegraph

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

The Automapper module in zMUD has been rewritten from scratch to use an SQL database engine (using the MDAC database software that comes with Windows). This is the same mapping engine used in zMapper and zExplorer. zMUD map databases can be customized using the external zMapper program (available. Posted: Wed Mar 06, 2002 5:54 am zmud 4.62 variable. i still use 4.62 cause i learn with it, too lazy to mess with the new ones but have a little question about the variable #4 drink water, is you drink 5 times but what if you store the 4 in a var like count #var count 4 i know to get the 4 out, you need use @count then how do. Posted: Tue Oct 04, 2005 10:57 pm. Questions about zMUD 7.x. So I decided to try zMUD 7.x as people suggested me. I love the speed of it, compared to old 4.62, but because I used 4.62 for so long, I am used to those little details I just can't do without, and I just can't find a way to make it work in 7.x. Here are my issues: These are specially designed programs that optimize mudding by adding very helpful tools such as triggers, macros and paths. Tharsis Zmud. A version of ZMud can be downloaded from this website which is preconfigured for connection to the mud. It is an older version of Zmud (4.62) but it is free to use - being from the. From Zugg Software: Play text-based MUD (Multi-User Dungeon) games using zMUD client. Includes extensive scripting language, regular expression triggers, aliases, keyboard macros, custom graphical buttons and gauges, automatic mapping module. Supports all MUD standards including ANSI, VT100. I use zmud software to play mud games, but nvda can not get the correct lines that show on the screen. zmud version is 4.62. @jcsteh jcsteh added the p4 label on Apr 4. @jcsteh. Contributor. jcsteh commented on Apr 4. P4 because this affects relatively few users. Pull request welcome, though! @ehollig. Zmud是zuggsoft公司出品的MUD客户端程序,提供了许多有用的工具,. 常用的Zmud版本有两个:Zmud 4.62和Zmud 7.21。7.21比4.62拥有更多的功能,如:数据库(DB),脚本支持(JS、VB),多行触发(Multi-state Triggers),设置分类(Nested Classes),更强大的地图. Zugg Software.2008-1-16[引用日期2014-10-13]. 词条标签. orgasm32.zip V1.1 10-Apr-97 (15k) Orgasmatron 32 - Shades Revisited: Just a bit of fun for Win95/NT users (MUD software with TAB as repeat key, programmable function keys and targetting) have a look and remember Viewdata! kwizzmud.zip Koppatops handy ZMUD settings file for anyone who is going to be running a. Question: Download zmud free 4.62 [full version] btdb.in :: 150 Mb. TOP seacrh Download free zmud 4.62

Office Timeline 6.00.07 Crack With Keygen Full Free Download

Office Timeline Crack is the only Gantt diagram and timeline creation software created specifically to work in Microsoft PowerPoint. Working with Office Timeline to create professional Gantt diagrams and timelines is quick and easy. The application has a simple and intuitive interface that is very easy to manage. With the perfect integration in PowerPoint, the application has a powerful and easy-to-use Timeline Wizard, which means you can start creating images of great-looking projects in seconds.

Office Timeline 6.00.07 Crack is a simple but powerful PowerPoint add-in that anyone can use to quickly create impressive graphics and graphic slides. Free yourself from the tedious work of creating visual projects that are difficult to handle. The Office timeline allows you to draw charts in PowerPoint almost instantly. Customize them in just a few clicks to create clear, elegant high-level presentations that everyone will understand.

Office Timeline Pro Crack is the name of the program that allows users and project managers to take advantage of timelines on their slides. This add-on adds a new feature in the PowerPoint tab so that users can display their projects with Gantt charts on slides. You no longer have to spend much time using different objects to draw Gantt charts, with just a few clicks you can display Gantt charts on each slide.

Office Timeline Pro Crack With Keygen

Try the only web-based tool that creates native PowerPoint timeline slides. Quickly build beautiful visuals that are easy to share, update, and present to clients and executives. Get the flexibility of the web with Office Timeline Online. With the PowerPoint add-in, you get more features, more details, more visual effects. Easily make impressive timelines that expensive and complex project management tools cannot. With the web app’s drag & drop simplicity, you get just what you need to make a beautiful timeline quickly. Create professional-looking visuals almost instantly and update them in real-time as plans change.

Powerful PowerPoint timeline maker! Use the feature-rich desktop app to build striking timelines on your desktop, right inside PowerPoint. Easily customize every detail of your graphic to present your project in a crisp, distinctive way that impresses stakeholders. Accessible online timeline generator! Use the web tool to create beautiful timelines anytime, anywhere, and access them quickly wherever you are. Build and style your graphic directly in your browser and download it in your preferred format with the click of a button.

Office Timeline Crack With Product Key

Creating stunning graphics in PowerPoint is easy! Simply select the style or template of the timeline, enter or import the data of your project, and click “Create.” It is so simple! Improve the communication of the project with the amazing Timeline PowerPoint slides that you can view, edit, and publish to anyone who has Microsoft Office.

Office Timeline Plus Crack is a simple but powerful PowerPoint add-in that anyone can use to quickly make impressive timelines zmodeler 3.1.5 cracked - Activators Patch Gantt chart slides. It uses a platform, even with smart charts. And make the application too much. It is presently using offline and desktop users. Microsoft Office Timeline is activating the preliminary version similar if you keep several bit formats of windows. Microsoft Office Timeline provides you with new and professional writing skills and outstanding visualization for you. It has eye-infective new visual effects and breaks down complicated data. You can now enter the timeline in a single tick button.

Office Timeline 6.00.07 Crack With Serial Key

Office Timeline 6.00.07 Crack + keygen is an add-in that is using Microsoft PowerPoint that makes it possible to create gorgeous, professional PowerPoint timelines easily. The application enables you to quickly produce a professional task that showcases your work and impress clients, colleagues, and supervisors. Download periodically updates software information of Office Timeline Free Edition through the pc software publisher (Office Timeline), but some provided information could be slightly out-of-date or incorrect.

Besides, the Elapsed time indicator and daily markers can be set above or beneath the timeline, or hidden completely. So, for the milestones, you can assign different shapes and select their size and spacing type. Therefore, if you’re working on a timeline that depicts a very large period. So, Office Timeline Torrent Portable it’s possible to adjust its scale based on intervals such as days, weeks, months, quarters, and years, and also select to display specific days. Therefore, if you’re looking for a practical way of creating elegant and professional-looking timelines for your presentations.

Key Features:

  • Over 400,000 professionals in businesses around the globe are using this award-winning PowerPoint tool to make project professional presentation timelines and Gantt charts quicker and easier than ever before.
  • Office Timeline is an add-on for Microsoft PowerPoint that allows you to easily and quickly create custom, great-looking timelines. Office Timeline is easy to install and it seamlessly integrates into the PowerPoint ribbon.
  • Accessing it, you can create new timelines or choose from the many templates that are made available and customize them. ‘Metro’, ‘Modern’, ‘Gantt’ and ‘Phases’ are the main predefined timelines that you can opt to modify to fit your needs. While working on them, you can change the style from one to another without ruining the design.
  • With Office Timeline, you are guided through a step-by-step process of creating the timeline. What’s even better about this, is that while you are shown what to do and how you can actually insert the data that you want your timeline to contain. With a few clicks and press keys, you can select the color, enter start and end dates, duration percentage, title, and choose its shape.

What’s New?

  • Three brand-new milestone shapes for even more stylish timelines
  • A new twist to the popular Triangle Flag milestone shape
  • Quality and usability improvements

Office Timeline Registration Key:

  • AKM8-MAS2-CH77-KHI9-ARRI
  • JML4-ANE7-A1L0-SAD9-JAM4

App Info:

  • Title: Office Timeline 6.00.07
  • Filename:OfficeTimeline.exe
  • File size:14.83MB (15,555,152 bytes)
  • Requirements:Windows (All Versions)
  • Languages:Multiple languages
  • License:Freeware
  • Author:Office Timeline, LLC.

How to Crack?

  • First of all download the free version of this app the from official website
  • Now run and install the downloaded app
  • Close the app if running
  • Now download it crack or keygen file from here
  • Open and extract that package
  • Now run the .exe file for cracking
  • Process complete restart of your PC or Mac

Like this:

LikeLoading.

Related

Categories Windows › Office tools › Other Office ToolsTags office timeline 3.62.11 crack, office timeline 3.62.11 crack Activation Key, office timeline 3.62.11 crack Download, office timeline 3.62.11 crack Features, office timeline 3.62.11 crack Full, office timeline 3.62.11 crack Installation Process, office timeline 3.62.11 crack Latest, office timeline 3.62.11 crack Latest Final draft crack mac - Activators Patch, office timeline 3.62.11 crack License Key, office timeline 3.62.11 crack Product Key, office timeline 3.62.11 crack Registration key, office timeline 3.62.11 crack Registration Number, office timeline 3.62.11 crack Serial key, office timeline 3.62.11 crack Serial Number, office timeline activation key generator, office timeline plus activation key, office timeline plus edition activation key, office timeline plus edition product key crack, office timeline plus edition product key free, office timeline plus free download, office timeline product key crack, office timeline reviewsИсточник: https://softwaresa2z.com/office-timeline-keygen/

Office Timeline + 3.62.11.00 Multilingual 2019 !{Latest}

Office Timeline With Crack is a simple but powerful PowerPoint add-in that anyone can use to quickly create impressive graphs and graphic slides. Free yourself from the tedious work of creating visual projects that are difficult to handle. AlSo Download Office 2013-2019 C2R Install 

The Office  With Keygen Timeline allows you to draw graphs in PowerPoint almost instantly. Customize them in just a few clicks to create clear, elegant, high-level presentations that everyone will understand. Microsoft Office 2019 Preview

Creating stunning graphs in PowerPoint is easy! Simply select a style or timeline template, enter or import your project data, and click Create. It is so simple!

Improve project communication with amazing Timeline PowerPoint slides, which can be viewed, edited and shared to anyone with Microsoft Office. PowerPoint’s Office Timeline integration makes it easy to present project plans or Gantt charts in a way that is easy for the audience to understand.

Anyone can make an impressive schedule in less than a minute!

Office Active Timeline quickly creates professional-looking graphs and Gantt charts. Just load the add-in, and you’re done to create your first graphic. Ideal for teams and colleagues who need to instantly create executive-level project reviews that demonstrate their work.

Works with: PowerPoint 2007, 2010, 2013, 2016, and Office 365

OS: Windows XP / Vista / 7/8 / 8.1 / 10

 Download : Office Timeline + 3.62.11.00 Multilingual 2019 !{Latest}

Turbo.to 

Ultrasonido G.E Logiq 700

Technical

Publications

Direction 46-030402

Revision 5

GE Medical Systems

LOGIQ t 700 Service Manual

E
Copyright 1993, 1994, 1995, 1996, 1997, 1998 By General Electric Co.

used by GEMS-Europe, GEMS-Asia and GEMS-Americas

Operating Documentation
GE Medical Systems: Telex 3797371
P.O. Box 414, Milwaukee, Wisconsin 53201 U.S.A.
(Asia, Pacific, Latin America, North America

GE Medical Systems – Europe: Tel: +49 (0) 212 28 02 208


Beethovenstraße 239, Postfach 11 05 60, D–42655 Solingen,
GERMANY
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

D THIS SERVICE MANUAL IS AVAILABLE IN ENGLISH ONLY.


WARNING D IF A CUSTOMER’S SERVICE PROVIDER REQUIRES A LANGUAGE OTHER
THAN ENGLISH, IT IS THE CUSTOMER’S RESPONSIBILITY TO PROVIDE
August 8, 2021 - Free Activators TRANSLATION SERVICES.
D DO NOT ATTEMPT TO SERVICE THE EQUIPMENT UNLESS THIS SERVICE
MANUAL HAS BEEN CONSULTED AND IS UNDERSTOOD.
D FAILURE TO HEED THIS WARNING MAY RESULT IN INJURY TO THE SERVICE
PROVIDER, OPERATOR OR PATIENT FROM ELECTRIC SHOCK,
MECHANICAL OR OTHER HAZARDS.

D CE MANUEL DE MAINTENANCE N’EST DISPONIBLE QU’EN ANGLAIS.


AVERTISSEMENT D SI LE TECHNICIEN DU CLIENT A BESOIN DE CE MANUEL DANS UNE AUTRE
LANGUE QUE L’ANGLAIS, C’EST AU CLIENT QU’IL INCOMBE DE LE FAIRE
TRADUIRE.
D NE PAS TENTER Clip studio paint ex sale SUR LES ÉQUIPEMENTS TANT QUE LE
Comodo antivirus 2021 Crack + License Key Latest Free Download MANUEL SERVICE N’A PAS ÉTÉ CONSULTÉ ET COMPRIS.
D LE NON-RESPECT DE CET AVERTISSEMENT PEUT ENTRAÎNER CHEZ LE
TECHNICIEN, L’OPÉRATEUR OU LE Winzip 23 serial key generator - Crack Key For U DES BLESSURES DUES À DES
DANGERS ÉLECTRIQUES, MÉCANIQUES OU AUTRES.

D DIESES KUNDENDIENST–HANDBUCH EXISTIERT NUR IN


ENGLISCHER SPRACHE.
WARNUNG
D FALLS EIN FREMDER KUNDENDIENST EINE ANDERE SPRACHE BENÖTIGT,
IST ES AUFGABE DES KUNDEN FÜR EINE ENTSPRECHENDE ÜBERSETZUNG
ZU SORGEN.
D VERSUCHEN SIE NICHT, DAS GERÄT ZU REPARIEREN, BEVOR DIESES
KUNDENDIENST–HANDBUCH NICHT ZU RATE GEZOGEN UND VERSTANDEN
WURDE.
office timeline 3.62 crack - Activators Patch D WIRD DIESE WARNUNG NICHT BEACHTET, SO KANN ES ZU VERLETZUNGEN
DES KUNDENDIENSTTECHNIKERS, DES BEDIENERS ODER DES PATIENTEN
Malware Hunter 1.82.0.668 Serial Key - Crack Key For U adobe acrobat dc vs pro - Crack Key For U DURCH ELEKTRISCHE SCHLÄGE, MECHANISCHE ODER SONSTIGE
GEFAHREN KOMMEN.

D ESTE MANUAL DE SERVICIO SÓLO EXISTE EN INGLÉS.


AVISO D SI ALGÚN PROVEEDOR DE SERVICIOS AJENO A GEMS SOLICITA UN IDIOMA
QUE NO SEA EL INGLÉS, ES RESPONSABILIDAD DEL CLIENTE OFRECER UN
SERVICIO DE TRADUCCIÓN.
D NO SE DEBERÁ DAR SERVICIO TÉCNICO AL EQUIPO, SIN HABER
CONSULTADO Y COMPRENDIDO ESTE MANUAL DE SERVICIO.
D LA NO OBSERVANCIA DEL PRESENTE AVISO PUEDE DAR LUGAR A QUE EL
PROVEEDOR DE SERVICIOS, EL OPERADOR O EL PACIENTE SUFRAN
LESIONES PROVOCADAS POR CAUSAS ELÉCTRICAS, MECÁNICAS O DE
OTRA NATURALEZA.

1
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

D ESTE MANUAL DE ASSISTÊNCIA TÉCNICA SÓ SE ENCONTRA


DISPONÍVEL EM INGLÊS.
ATENÇÃO
D SE QUALQUER OUTRO SERVIÇO DE ASSISTÊNCIA TÉCNICA, QUE NÃO A
GEMS, SOLICITAR ESTES MANUAIS NOUTRO IDIOMA, É DA
RESPONSABILIDADE DO CLIENTE FORNECER OS SERVIÇOS DE TRADUÇÃO.
D NÃO TENTE REPARAR O EQUIPAMENTO SEM TER CONSULTADO E
COMPREENDIDO ESTE MANUAL DE ASSISTÊNCIA TÉCNICA.
D O NÃO CUMPRIMENTO DESTE AVISO PODE POR EM PERIGO A SEGURANÇA
DO TÉCNICO, OPERADOR OU PACIENTE DEVIDO A‘ CHOQUES ELÉTRICOS,
MECÂNICOS OU OUTROS.

D IL PRESENTE MANUALE DI MANUTENZIONE È DISPONIBILE


SOLTANTO IN INGLESE.
AVVERTENZA
D SE UN ADDETTO ALLA MANUTENZIONE ESTERNO ALLA GEMS RICHIEDE IL
MANUALE IN UNA LINGUA DIVERSA, IL CLIENTE È TENUTO A PROVVEDERE
DIRETTAMENTE ALLA TRADUZIONE.
D SI PROCEDA ALLA MANUTENZIONE DELL’APPARECCHIATURA SOLO DOPO
AVER CONSULTATO IL PRESENTE MANUALE ED AVERNE COMPRESO IL
CONTENUTO.
D NON TENERE CONTO DELLA PRESENTE AVVERTENZA POTREBBE FAR
COMPIERE OPERAZIONI DA CUI DERIVINO LESIONI ALL’ADDETTO ALLA
MANUTENZIONE, ALL’UTILIZZATORE ED AL sketchup free download with crack 64 bit - Free Activators PAZIENTE PER
FOLGORAZIONE ELETTRICA, PER URTI MECCANICI OD ALTRI RISCHI.

2
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 bluestacks crack for windows 10 - Free Activators Direction 46–030402

REVISION HISTORY

REV DATE PRIMARY REASON FOR CHANGE


0 Sep 30, 1994 Initial document release
1 Feb 10, 1995 Document update for R4.3
2 Nov 1, 1995 Document update for R5 software and V2 (EMC) hardware
3 Apr 26, 1996 Update for R5.6.4 and R6.0 software and hardware
4 Apr 18, 1997 Update for R6.2 software and hardware
4+ Apr 20, 1998 Update for R6.2.3 software, R7.1 software and hardware, and GE Standards)

LIST OF EFFECTIVE PAGES

PAGE REV PAGE REV PAGE REV PAGE REV PAGE REV

Title. . 5
GE Logo Page. . 5
1 to 4. . 5
i to x. . 5
1–1 to 1–18. 5
2–1 to 2–14. 5
3–1 to 3–22. 5
4–1 to 4–20. 5
5–1 to 5–32. 5
6–1 to 6–76. 5
7–1 to 7–26. 5
8–1 to 8–36. 5
9–1 to 9–90. 5
10–1 to 10–16. . 5
Index–1 to Index–8. . 5

3
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

intentionally blank

4
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

TABLE OF CONTENTS

SECTION PAGE

TABLE OF CONTENTS
LIST OF ILLUSTRATIONS. . iv
LIST OF TABLES. . xiv

SECTION 1 – SAFETY
1–1 INTRODUCTION. . . 1– 2
1–2 IMPORTANT CONVENTIONS. 1– 3
1–3 SAFETY CONSIDERATIONS. . 1– 7
1–4 EMC, EMI, AND ESD. 1– 15
1–5 CUSTOMER ASSISTANCE. 1– 17

SECTION 2 – PREINSTALLATION
2–1 PURPOSE OF SECTION. . 2–2
2–2 GENERAL INFORMATION. 2–2
2–3 FACILITY NEEDS. . . 2–6
2–4 office timeline 3.62 crack - Activators Patch ELECTRICAL NEEDS. 2–9
2–5 DICOM OPTION PRE–INSTALLATION REQUIREMENTS. 2–10
Sales/Service Preinstallation Checklist. . 2–13

SECTION 3 – INSTALLATION
3–1 PURPOSE OF SECTION. . 3–2
3–2 GENERAL INFORMATION. 3–2
3–3 RECEIVING AND UNPACKING THE EQUIIPMENT. . 3–5
3–4 INSPECTING THE FACILITY. . 3–7
3–5 PREPARING THE UNIT FOR INSTALLATION. 3–8
3–6 COMPLETING THE INSTALLATION. 3–11
3–7 TRANSPORTING THE UNIT. . 3–20
Installation Certificate. 3–21

SECTION 4 – FUNCTIONAL CHECKS AND SITE LOG


4–1 PURPOSE OF SECTION. movavi video converter key - Free Activators.. 4–2
4–2 GENERAL PROCEDURES. 4–3
4–3 FUNCTIONAL CHECKS. . 4–6
4–4 SITE LOG. . 4–19

SECTION 5 – SYSTEM OVERVIEW


5–1 PURPOSE OF SECTION. . 5–2
5–2 LOGIQ 700 DESCRIPTION. . 5–2
5–3 ACOUSTIC OUTPUT corel paintshop pro 2019 crack.. 5–6
5–4 LOGIQ 700 CIRCUIT CARDS. 5–9
5–5 POWER SYSTEM. . . 5–19

i
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

TABLE OF CONTENTS (Continued)

SECTION windows 8.1 pro product key - Free Activators PAGE

SECTION 6 – DIAGNOSTIC SOFTWARE


6–1 INTRODUCTION. . . 6–2
6–2 SERVICE SOFTWARE TOOL DESCRIPTIONS. . 6–3
6–3 DIAGNOSTICS. windows repair 2018 crack - Free Activators.. 6–20
6–4 VIEW LOGS. iobit smart game booster download.. 6–34
6–5 DIAGNOSTIC DESCRIPTIONS. 6–46
6–6 LOADING SYSTEM SOFTWARE. . 6–65
6–7 IMPORTANT TROUBLESHOOTING HINTS. 6–76

SECTION 7 – ASSEMBLY
7–1 PURPOSE OF SECTION. . 7–2
7–2 ACCESS ITEMS. . . 7–3
7–3 FUNCTIONAL ITEMS. 7–6
7–4 JUMPERS. . 7–22

SECTION 8 – SYSTEM PERFORMANCE AND MESSAGES


8–1 PURPOSE OF SECTION. . 8–2
8–2 MECHANICAL PERFORMANCE. . 8–3
8–3 POWER PERFORMANCE. 8–5
8–4 SYSTEM TIMING PERFORMANCE. 8–8
8–5 MONITOR PERFORMANCE. . 8–9
8–6 IMAGE PERFORMANCE. . 8–12
8–7 VIDEO OUTPUT PERFORMANCE. 8–13
ID Photos Pro 8.5.3.11 Crack Activation key Free 8–8 AUDIO OUTPUT PERFORMANCE. 8–16
adobe acrobat dc vs pro - Crack Key For U 8–9 LED INDICATORS. . 8–17
8–10 CONTROL PANEL SELF–TEST. 8–20
8–11 SYSTEM MESSAGES. 8–25

SECTION 9 – RENEWAL PARTS


9–1 PURPOSE OF SECTION. . 9–2
9–2 ARRANGEMENT OF THIS SECTION. . download deep freeze full crack - Crack Key For U 9–2
9–3 EQUIPMENT MODELS COVERED IN THIS SECTION. 9–3
9–4 ABBREVIATIONS/CONVENTIONS USED IN THIS SECTION. . 9–4
9–5 KITS. . . 9–4
9–6 PACKING CIRCUIT CARDS FOR RESHIPMENT. 9–90

SECTION 10 – PLANNED MAINTENANCE


10–1 PURPOSE OF SECTION. . 10–2
10–2 PLANNED MAINTENANCE (PM). . 10–3
10–3 SYSTEM MAINTENANCE. 10–5
10–4 PROBE MAINTENANCE. . binary editor - Activators Patch.. . VScodePrint Free Download 10–12

ii
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Axialis IconWorkshop 6.91 Crack with Product key Direction 46–030402

LIST OF ILLUSTRATIONS

Illustration Page

1–1 LABELS FOUND ON FRONT OF LOGIQ 700. 1– 11


1–2 LABELS FOUND ON BACK OF LOGIQ 700. . 1– 12
1–3 LABELS FOUND ON PROBES. . 1– ThunderSoft Screen Recorder Crack 11.1.0 With Key 2021 [Latest] 1–4 LOCATING PART NUMBERS ON CIRCUIT CARD. 1– 17

2–1 ENVELOPE DIMENSIONS FOR LOGIQ 700. 2–3


2–2 RECOMMENDED (14 BY 17 FEET) FLOOR PLAN. 2–7
2–3 MINIMAL (8 BY 10 FEET) FLOOR PLAN. . 2–7
DigiDNA iMazing Full Free - Crack Key For U 2–4 WORKSHEET FOR DICOM NETWORK INFORMATION. 2–10
2–5 WORKSHEET FOR USER NETWORK PREFERENCES. 2–11

3–1 PIN CONFIGURATIONS FOR 120 VAC SITE OUTLET. . 3–7


3–2 TYPICAL NEON OUTLET TESTER. . 3–7
3–3 LOCATION OF RATING PLATE. . 3–8
3–4 ISOLATION TRANSFORMER TERMINAL BLOCK SHOWING SOME POSSIBLE
WIRE, SHUNT, AND JUMPER CONNECTIONS. 3–9
3–5 RESISTANCE TEST OF UNIT GROUNDING. . 3–10
3–6 LOCATIONS OF SEISMIC ANCHORS AND OPTION RATING PLATES. . 3–12
3–7 DIAGRAM OF TEST SETUP FOR CHASSIS LEAKAGE CURRENT. . revo uninstaller pro download 3–13
3–8 REAR VIEW OF UNIT SHOWING CIRCUIT BREAKERS AND GROUND STUD. 3–14
3–9 DIAGRAM OF TEST SETUP FOR PROBE LEAKAGE CURRENT. 3–15
3–10 DIAGRAM OF TEST SETUP FOR PERIPHERAL LEAKAGE CURRENT. . 3–17

4–2 B–MODE DISPLAY SCREEN. 4–8


4–3 ACTUAL B IMAGE. . Renee PassNow Pro 2021.10.03.141 Crack With Key [Activation Code].. 4–10
4–4 M–MODE DISPLAY SCREEN. 4–12
4–5 ACTUAL M IMAGE. . . 4–12
4–6 B PLUS COLOR MODE DISPLAY SCREEN. . 4–14
4–7 ACTUAL 2D COLOR FLOW IMAGE. . 4–14
4–8 PW DOPPLER DISPLAY SCREEN. . 4–16
4–9 ACTUAL PW IMAGE. . adobe acrobat pro dc student - Crack Key For U.. 4–16

5–1 LOCATION OF MAJOR COMPONENTS WITHIN LOGIQ 700. . 5–2


5–2 SYSTEM DATA PATH. . 5–3
5–3 BASIC SYSTEM BLOCK DIAGRAM. . 5–4
5–4 DETAILED SYSTEM BLOCK DIAGRAM. . 5–8
5–5 CIRCUIT CARDS IN FE CARD CAGE (V2/V3 UNITS). . SolidWorks 2020.4.6 Crack With License Number Free Download tenorshare reiboot reddit 5–10
5–6 CIRCUIT CARDS IN FE CARD CAGE (V3 UNITS). . 5–10
5–7 CIRCUIT CARDS AND SUBSYSTEMS IN BE CARD CAGE. . 5–13
5–8 CIRCUIT CARDS AND INTERCONNECTIONS WITHIN OPERATOR CONTROL PANEL CleanMyMac X 4.8.5 Crack With Product Key Full Version Free Download 5–17
5–9 LOGIQ 700 POWER SYSTEM. . 5–20
5–10 DC–DC CONVERTER (PS2) POWER DISTRIBUTION. . 5–23
5–11 LOW NOISE POWER SUPPLY (PS3) POWER DISTRIBUTION (V1/V2 UNITS). 5–26
5–12 LOW NOISE POWER SUPPLY (PS3) POWER DISTRIBUTION (V3 UNITS). . 5–27
5–13 PHYSICAL LOCATIONS OF POWER POINTS ON FEBP. 5–29
5–14 PHYSICAL LOCATIONS OF POWER POINTS ON BEBP. 5–30
5–15 CONTROL PANEL INTERCONNECTS. 5–31
5–16 PROBE POWER POINTS ON XDIF CONNECTOR. 5–32

iii
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

LIST OF ILLUSTRATIONS (Continued)


Illustration Page
6–1 TEST PATH FOR VISUAL CHANNEL ALIVE. . 6–3
6–2 SECTOR IMAGES FOR 128 ELEMENTS. . 6–4
6–3 RMI 403GS PHANTOM. . . 6–6
6–4 ROI TOOL ON LOGIQ 700 MONITOR. . 6–7
6–5 FOUR ”CYSTS” USED TO QUALIFY GRAYSCALE. 6–8
6–6 VESSELS AT 8 AND 14 CM DEPTHS FOR CONTRAST RESOLUTI0N. Wondershare Filmora 7.2Serial Key.. . 6–9
6–7 DIAGRAM OF EXTERNAL VIDEO INPUTS TESTS. 6–12
6–8 CONNECTION POINTS FOR EXTERNAL VIDEO INPUTS. . 6–13
6–9 DIAGRAM OF VIDEO TEST PATTERNS. . 6–14
6–10 FIRST BRIGHTNESS AND CONTRAST VIDEO TEST PATTERN. 6–16
6–11 SECOND BRIGHTNESS AND Avast Secure Browser 80.1.3902.163 Free Download VIDEO TEST PATTERN. . 6–17
6–12 PURE COLORS VIDEO TEST PATTERNS. 6–17
6–13 LINEARITY VIDEO TEST PATTERN. . 6–18
6–14 SMPTE VIDEO TEST PATTERN. 6–18
6–15 LINEARITY AND CONVERGENCE VIDEO TEST PATTERN. 6–19
6–16 TEXT VIDEO TEST PATTERN. . 6–19
6–17 PIN ASSIGNMENTS FOR CABLE FROM LOGIQ 700 TO PC. . 6–20
6–18 VT200/PC CONNECTION TO LOGIC 700 BULKHEAD. 6–23
6–19 Filmora 8.1 Licensed email and Registration code SCREENS FOR gemsC DIAGNOSTICS. . 6–25
6–20 LOGIQ 700 gemsC TOP LEVEL SCREEN. . 6–26
6–21 LOGIQ 700 gemsC DIAGNOSTIC SCREEN. 6–27
6–22 TEST INPUT SCREEN FOR gemsC DIAGNOSTICS. 6–28
6–23 LOOPING SUBTEST PROMPT SCREEN FOR gemsC DIAGNOSTICS. 6–29
6–24 SELECTING AND STARTING A DIAGNOSTIC TEST. sketchup pro 2019 license key and authorization number.. . 6–30
6–25 SELECTING A CAPTURE LOG FOR DISPLAY. eset nod32 antivirus crack 2019 - Activators Patch.. scrivener crack mac - Activators Patch.. . 6–31
6–26 CAPTURE LOG EXAMPLE. ytdownloader ytd online - Crack Key For U.. 6–31
6–27 SCREENS FOR EXITING gemsC DIAGNOSTICS. . 6–32
6–28 VIEW LOGS DROPDOWN MENU FOR gemsC. 6–34
6–29 ERROR LOG FILE SCREEN. 6–35
6–30 PHYSICAL LOCATION OF TEMPERATURE SENSORS WITHIN UNIT. installer data recovery 6–36
6–31 BLOCK DIAGRAM OF TEMPERATURE SENSING CIRCUITS. . 6–36
6–32 TEMPERATURE LOG EXAMPLE. 6–37
6–33 EXAMPLE OF PAGE 2 OF SYSTEM CONFIGURATION LOG. 6–42
6–34 TD CHANNEL ASSIGNMENTS. . Razer Surround Pro 2.21 Crack + Activation Key Full Free 6–60
6–35 CALIBRATION DIAGNOSTIC ELEMENTS. 6–61
6–36 CALIBRATION LOG EXAMPLE. . magix photostory deluxe download - Free Activators 6–62
6–37 LOCATION OF RATING PLATES FOR UPGRADES AND OPTIONS. . 6–69

7–1 AIR FILTER, SIDE COVER, AND REAR COVER REMOVAL. 7–3
7–2 CONTROL PANEL AND UPPER AND LOWER FRONT COVER REMOVAL. 7–4
7–3 REAR BUMPER REMOVAL. 7–5
7–4 SIDE BUMPER REMOVAL. . MixPad Crack 7.32 With Registration Code 2021 [Latest] 7–5
7–5 LOCATION OF FUSE ON BULK CONVERTER (PS1). . 7–6
7–6 LOCATION OF FUSE ON ORIGINAL SSR. 7–7
7–7 LOCATION OF FUSES ON MASTER CONTROLLER (MC). . 7–7
7–8 LOCATION OF CIRCUIT BREAKERS. crack para virtual serial port driver 9.0 - Crack Key For U.. . 7–8
7–9 SSR. Extreme Picture Finder 3.51.4 Crack - Activators Patch.. . 7–9
7–10 ISOLATION TRANSFORMER REMOVAL. . 7–10

iv
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

LIST OF ILLUSTRATIONS (Continued)


Illustration Page

7–11 POWER SUPPLY REMOVAL. 7–11


7–12 POWER SUPPLY WIRING (V1/V2 UNITS). 7–12
7–13 POWER SUPPLY WIRING (V3 UNITS). TweakBit Driver Updater Crack 2.2.4.56138 Free Download [Latest].. . 7–13
7–14 ASSEMBLY OF AUDIO COMPONENTS. . 7–14
7–15 RF CABLE CONNECTIONS TO TD. . 7–15
7–16 RF CABLE CONNECTIONS TO XDIF. 7–16
7–17 OPERATION PANEL REMOVAL. Virtual DJ Pro 8_2021 Crack + Serial Keys Free Download Full. 7–17
7–18 ROUTING CABLES FOR OPERATOR PANEL THROUGH GAS CYLINDER ASSEMBLY 7–18
7–19 UNDERSIDE OF OPERATOR PANEL SHOWING CABLE ROUTING AND
ATTACHING HARDWARE. . 7–19
iobit smart game booster download 7–20 TASKLIGHT AND TASKLIGHT FIBER OPTIC CABLE REMOVAL. 7–20
7–21 MONITOR REMOVAL. . how to download vpn.. . 7–21
7–22 JUMPER INSTALLATION IN SOFT–START SSR. . 7–22
7–23 JUMPER INSTALLATION ON PIA. 7–23
7–24 JUMPER INSTALLATION ON MC. 7–23
7–25 JUMPER INSTALLATION ON BEBP. . 7–23
7–26 JUMPER INSTALLATION ON HEWLETT–PACKARD HP3323A OR SE (P2) OR
HPC3724S OR 25 (P3) HARD DRIVES. . 7–24
7–27 JUMPER INSTALLATION ON FUJITSU M1606SAU (P3) HARD DRIVES. . 7–24
7–28 JUMPER INSTALLATION ON SEAGATE ST31051N (P3), ST31203N (P3),
ST32430N (P4), AND ST32430N (P4) HARD DRIVEs. . 7–25
7–29 JUMPER INSTALLATION ON FUJITSU M2512A AND M2513A MODS. 7–25
7–30 JUMPER INSTALLATION ON SYTM2. 7–26
7–31 JUMPER INSTALLATION ON XDIF2. . 7–26

8–1 BRAKE ADJUSTMENT OF NEWER STYLE FRONT WHEEL ASSEMBLY. 8–3


8–2 SYSTEM POWER AT POWER SUPPLIES. 8–5
8–3 SYSTEM POWER DESTINATIONS AT BACKPLANE TERMINALS. . 8–6
8–4 SCSI POWER SOURCES AND DESTINATIONS. . 8–7
8–5 EXTERNAL OSCILLATOR POWER SOURCE AND DESTINATION. . 8–7
8–6 OSCILLATOR OUTPUT SIGNAL TERMINALS AND CHARACTERISTICS. 8–8
8–7 LOCATION OF MONITOR CONTROLS. . 8–9
8–8 VIDEO SIGNAL CONNECTOR LOCATIONS. . 8–10
8–9 TEST PATTERNS USED TO ADJUST BRIGHTNESS FOR MR IMAGING. 8–11
8–10 LOCATION OF VIDEO OUTPUT SIGNALS AT UNIT BULKHEAD. 8–13
8–11 CHROMA VIDEO SIGNAL. . droid transfer crack download - Crack Key For U.. . 8–13
8–12 LUMA (Y) OR B/W VIDEO SIGNAL. . 8–14
8–13 COMPOSITE VIDEO SIGNAL. 8–14
8–14 RGB VIDEO SIGNAL. . 8–14
8–15 INTERLACED BLANKING PERIOD. . 8–14
8–16 COMBINED H AND V SYNC TO MONITOR AND BULKHEAD. 8–15
8–17 LOCATIONS OF AUDIO SIGNAL INTERFACES. 8–16
8–18 LED LOCATIONS IN BACK Emurasoft EmEditor Professional 20.5.5 Crack+ Activation Key Free Download 2021 - Free Activators CARD CAGE. 8–17
8–19 SCAN Overwatch 1.49.0.0 Build 69164 Crack with Keygen Free Download (SS) AND SCAN CONVERSION (XY) LEDS. . 8–17
8–20 LOCATIONS OF LEDS, TEST POINTS, JUMPERS AND SIGNAL ON PIA. 8–18
8–21 SOFTKEY DISPLAY DIAGNOSTIC SCREEN – TGC POTS. . 8–20
8–22 DIAGNOSTIC SCREEN – ROTARY ENCODERS. . 8–21
8–23 DIAGNOSTIC SCREEN – TRACKBALL. . 8–21
8–24 DIAGNOSTIC SCREEN – KEYBOARD KEYS. . 8–22
8–25 DIAGNOSTIC SCREEN – SWITCHES. 8–23
8–26 ENGLISH LANGUAGE CONTROL PANEL. 8–24

v
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 adobe illustrator cs6 free download with crack kickass - Crack Key For U Direction 46–030402

LIST OF ILLUSTRATIONS (Continued)


Illustration office timeline 3.62 crack - Activators Patch Page

9–1 PROBES AND RELATED ITEMS. 9–5


9–2 SIDE COVERS, REAR COVERS, AND MONITOR ASSEMBLY. . 9–6
9–3 MONITOR ASSEMBLY BREAKDOWN. 9–8
9–4 FRONT COVERS, XDIF, AND OPERATOR CONTROL PANEL. . 9–10
9–5 OPERATOR CONTROL PANEL BREAKDOWN. 9–12
9–6 UPPER OPERATOR PANEL BREAKDOWN. . 9–14
9–7 LOWER OPERATOR PANEL BREAKDOWN. . 9–16
9–8 FRONT END BACKPLANE (V1 UNITS). . 9–20
9–9 FRONT END BACKPLANE (V2 UNITS). . 9–22
9–10 FRONT END BACKPLANE (V3 UNITS). . 9–24
9–11 FRONT END CIRCUIT CARDS AND CARD CAGE (V1/V2 UNITS). . superantispyware key 9–26
9–12 FRONT END CIRCUIT CARDS AND CARD CAGE (V3 UNITS). . 9–28
9–13 SQUIRREL CAGE COOLING FAN. 9–30
9–14 MUFFIN FAN ASSEMBLY. . 9–32
9–15 MUFFIN FAN ASSEMBLY BREAKDOWN. 9–33
9–16 REAR BUMPER, POWER SUPPLIES, AND BULKHEAD. 9–34
9–17 BULKHEAD ASSEMBLY BREAKDOWN (V1 UNITS). 9–36
9–18 BULKHEAD ASSEMBLY BREAKDOWN (V2/V3 UNITS). 9–38
9–19 HARD DRIVE AND MOD. . . 9–40
9–20 BACK END CARDS AND CARD CAGE. . 9–42
9–21 BACK END BACKPLANE (V1). . 9–44
9–22 BACK END BACKPLANE (V2/V3). 9–46
9–23 TEMPERATURE SENSORS. 9–48
9–24 INTERCONNECT CABLES (V1 UNITS). avast free antivirus uninstall - Crack Key For U.. . 9–50
9–25 INTERCONNECT CABLES (V2 UNITS). Avast Driver Updater 2.5.9 Key + Review With Registration Key [2021].. 9–52
9–26 INTERCONNECT CABLES (V3 UNITS). . 9–54
9–27 ISOLATION TRANSFORMER AND HIGH VOLTAGE CAPACITOR ASSEMBLY. 9–56
9–28 AC WIRING (BASIC SYSTEM). . 9–58
9–29 AC WIRING (SOFT–START SYSTEM WITH SERVICE OUTLET). ytd downloader 5.9 11 - Crack Key For U 9–60
9–30 AC WIRING (SOFT–START SYSTEM WITH MONITOR CIRCUIT BREAKER). . 9–62
9–31 AC POWER DISTRIBUTION ASSEMBLY (BASIC SYSTEM). 9–64
9–32 AC POWER DISTRIBUTION ASSEMBLY (SOFT–START SYSTEM WITH SERVICE OUTLET). . .
9–66
9–33 AC POWER DISTRIBUTION ASSEMBLY (SOFT–START SYSTEM WITH
MONITOR CIRCUIT BREAKER). 9–68
9–34 RF SHIELDS. . 9–70
9–35 RF GASKETS (V2/V3 UNITS ONLY). . 9–72
9–36 FRAME ASSEMBLY. . . 9–74
9–37 GAS SPRING ASSEMBLY BREAKDOWN. 9–76
9–38 FRONT WHEEL ASSEMBLY BREAKDOWN. . 9–78
9–39 PACKING A CIRCUIT CARD FOR SHIPMENT. 9–90

10–1 POWER CORD REMINDERS. 10–10


10–2 UNIT AND POWER SUPPLY FILTER LOCATIONS. movavi video editor plus activation key - Activators Patch.. 10–10

vi
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

LIST OF TABLES

Table Page

1–1 HAZARD ICONS. . 1– 4


1–2 PRODUCT ICONS. . . 1– 5
1–3 RULES FOR PREVENTING OR LESSENING ESD DAMAGE. . Antivirus - Activators Patch.. 1– 16
1–4 PHONE NUMBERS FOR CUSTOMER ASSISTANCE. . 1– 17

2–1 PHYSICAL DIMENSIONS OF LOGIQ 700. . Smadav Pro Free Activate.. 2–2


2–2 EMI PREVENTION/ABATEMENT. perfect keyboard app.. emco msi package builder silent install - Crack Key For U.. 2–4
2–3 LOGIQ 700 ENVIRONMENTAL LIMITS. . 2–8
2–4 WAITING TIME PRIOR TO OPERATING A UNIT THAT ARRIVES TOO HOT OR COLD. 2–8
2–5 LOGIQ 700 POWER RATING CONFIGURATIONS. 2–9

3–1 TOOLS NEEDED Avast Secure Browser 80.1.3902.163 Free Download INSTALLATION. . 3–2


3–2 WIRE, SHUNT, AND JUMPER CONNECTIONS TO ISOLATION TRANSFORMER. . 3–9
3–3 DATA SHEET FOR CHASSIS LEAKAGE CURRENT TEST. . 3–14
3–4 DATA SHEET FOR TYPE BF PROBE LEAKAGE CURRENT TEST. . Filmora 8.1 Licensed email and Registration code 3–16
3–5 DATA SHEET FOR TYPE CF PROBE LEAKAGE CURRENT TEST. . 3–16
3–6 DATA SHEET FOR Bittorrent pro activation key - Free Activators LEAKAGE CURRENT TEST. . 3–18
3–7 TROUBLESHOOTING PROCEDURES FOR LEAKAGE CURRENT PROBLEMS. . 3–19

4–1 POWER–ON/BOOT–UP TESTS. . origin pro 2019 crack download - Free Activators.. . 4–3

5–1 SUBSYSTEM SUMMARY. . 5–5


5–2 ACOUSTIC POWER INDICATIONS ON IMAGE. prisms software 5–7
5–3 MODE AFFECTED BY AO CHANGE. 5–7
5–4 EFFECTS OF PANEL CONTROLS ON ACOUSTIC POWER. 5–7
5–5 FUNCTIONS OF FE CIRCUIT CARDS IN FE CARD CAGE. . 5–11
5–6 FUNCTIONS OF OTHER FE CIRCUIT CARDS. 5–12
5–7 FUNCTIONS OF KERNEL CIRCUIT CARDS. . 5–14
5–8 FUNCTIONS OF MID PROCESSOR CIRCUIT CARDS. . 5–15
5–9 FUNCTIONS OF SCAN CONVERTER CIRCUIT CARDS. 5–16
5–10 FUNCTIONS OF CIRCUIT CARDS IN OPERATOR CONTROL PANEL. . 5–18
5–11 BULK CONVERTER INPUT/OUTPUT SPECIFICATIONS. 5–21
5–12 DESCRIPTION OF BULK CONVERTER CONTROL SIGNALS. . 5–21
5–13 DC–DC CONVERTER OUTPUT SPECIFICATIONS. 5–22
5–14 DESCRIPTION OF DC–DC CONVERTER CONTROL SIGNALS. Auslogics BoostSpeed Activation Key 5–22
5–15 LOW NOISE POWER SUPPLY OUTPUT SPECIFICATIONS. 5–24
5–16 DESCRIPTION OF LOW NOISE POWER SUPPLY CONTROL SIGNALS. . 5–25
5–17 FRONT END POWER USAGE. . 5–28
5–18 BACK END POWER USAGE. 5–30
5–19 CONTROL PANEL POWER USAGE. . 5–31

vii
GE MEDICAL SYSTEMS advanced system repair pro cost - Crack Key For U LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Freemake Video Converter 4.1.12.81 Crack With Serial key Free Direction 46–030402

4K Stogram 3.4.1.3580 Crack With License Key (Mac) Free LIST OF TABLES (Continued)


Table Page

6–1 TESTS IN VISUAL CHANNEL ALIVE. 6–4


6–2 PORTION OF VIDEO I/O CABLE USED DURING EXTERNAL VIDEO INPUTS TESTS. . 6–12
6–3 PORTI0N OF VIDEO I/O CABLES USED BY VIDEO TEST PATTERNS (V1 UNITS). 6–14
6–4 PORTI0N OF VIDEO I/O CABLES USED BY VIDEO TEST PATTERNS (V2/V3 UNITS). . 6–15
6–5 KEYSTROKE COMMANDS FOR gemsC DIAGNOSTICS. 6–22
6–6 TEMPERATURE RELATED MESSAGES. . 6–37
6–7 spyhunter 5 keygen generator TD CHANNEL NUMBER ASSIGNMENTS. 6–59
6–8 POSSIBLE ACTIONS IF SYSTEM ABORTS CALIBRATION. . 6–63
6–9 POSSIBLE ACTIONS IF SYSTEM FAILS CALIBRATION. 6–63
bitdefender total security 2020 crack 6–10 CHANNEL/COMPONENT CORRELATIONS FOR BEAMFORMER. . 6–64
6–11 OB DEFAULT COMMENTS FOR FRENCH, GERMAN, ITALIAN, AND SPANISH. . 6–65
6–12 RECORDING TABLE FOR USER PREFERRED OB COMMENT. 6–65

7–1 LOGIQ 700 FUSE COMPLEMENT. . 7–6


7–2 LOGIQ 700 COMPONENTS WITH JUMPERS (OR DIP SWITCHES). 7–22

8–1 MONITOR TROUBLESHOOTING. 8–9


8–2 DESCRIPTIONS OF SYSTEM ERROR MESSAGES. 8–26

9–1 PROBES AND RELATED ITEMS. 9–5


9–2 SIDE COVERS, REAR COVERS, AND MONITOR ASSEMBLY. . 9–7
9–3 MONITOR ASSEMBLY BREAKDOWN. 9–9
9–4 FRONT COVERS, XDIF, AND OPERATOR CONTROL PANEL. . 9–11
9–5 OPERATOR CONTROL PANEL BREAKDOWN. 9–13
9–6 UPPER OPERATOR PANEL BREAKDOWN. . Xsplit Gamecaster Keygen.. 9–15
9–7 LOWER OPERATOR PANEL BREAKDOWN. . 9–17
9–8 FRONT END BACKPLANE (V1 UNITS). . 9–21
9–9 FRONT END BACKPLANE (V2 UNITS). . 9–23
9–10 FRONT END BACKPLANE (V3 UNITS). . 9–25
9–11 FRONT END CIRCUIT CARDS AND CARD CAGE (V1/V2 UNITS). . 9–27
9–12 FRONT END CIRCUIT CARDS AND CARD CAGE (V3 UNITS). . 9–29
9–13 SQUIRREL CAGE COOLING FAN. 9–31
9–14 MUFFIN FAN ASSEMBLY. . 9–32
9–15 MUFFIN FAN ASSEMBLY BREAKDOWN. 9–33
9–16 REAR BUMPER, POWER SUPPLIES, AND BULKHEAD. 9–35
9–17 BULKHEAD ASSEMBLY BREAKDOWN (V1 UNITS). 9–37
9–18 BULKHEAD ASSEMBLY BREAKDOWN (V2/V3 UNITS). 9–39
9–19 HARD DRIVE AND MOD. . . 9–41
9–20 BACK END CARDS AND CARD CAGE. . hd tune pro free download.. . 9–43
9–21 BACK END BACKPLANE (V1). . 9–45
9–22 BACK END BACKPLANE (V2/V3). 9–47
9–23 TEMPERATURE SENSORS. 9–49
9–24 INTERCONNECT CABLES (V1 UNITS). . 9–51
9–25 INTERCONNECT CABLES (V2 UNITS). . 9–53
9–26 INTERCONNECT CABLES (V3 UNITS). . 9–55
9–27 ISOLATION TRANSFORMER AND HIGH VOLTAGE CAPACITOR ASSEMBLY. 9–57
9–28 AC WIRING (BASIC SYSTEM). . 9–59
9–29 AC WIRING (SOFT–START SYSTEM WITH SERVICE OUTLET). 9–61
9–30 AC WIRING (SOFT–START SYSTEM WITH MONITOR CIRCUIT BREAKER). . 9–63

viii
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

LIST OF TABLES (Continued)


Table Page

9–31 AC POWER DISTRIBUTION ASSEMBLY (BASIC SYSTEM). 9–65


9–32 AC POWER DISTRIBUTION ASSEMBLY (SOFT–START SYSTEM WITH
SERVICE Smadav 2019 registration key - Activators Patch. . . 9–67
9–33 AC POWER DISTRIBUTION ASSEMBLY (SOFT–START SYSTEM WITH
MONITOR CIRCUIT BREAKER). 9–69
9–34 RF SHIELDS. . 9–71
9–35 RF GASKETS (V2/V3 UNITS ONLY). . 9–73
9–36 FRAME ASSEMBLY. . . 9–75
9–37 GAS SPRING ASSEMBLY BREAKDOWN. 9–77
9–38 FRONT WHEEL ASSEMBLY BREAKDOWN. . 9–79
9–39 SOFTWARE. . 9–80
9–40 RENEWAL PARTS KITS. . . camtasia studio 9 blogspot - Crack Key For U 9–81
9–41 CONTENTS OF KIT 1 (2113295). 9–82
9–42 CONTENTS OF KIT 2 (2113295–2). brave browser android - Crack Key For U.. . 9–82
9–43 CONTENTS OF KIT 3 (2113295–3). . 9–83
9–44 CONTENTS OF KIT 4 (2113295–4). . 9–83
9–45 CONTENTS OF KIT 5 (2113295–5). . 9–84
9–46 CONTENTS OF KIT 6 (2113295–6). . pdffactory free - Crack Key For U.. . 9–84
9–47 CONTENTS OF KIT 7 (2113295–7). . 9–85
9–48 CONTENTS OF KIT 8 (2113295–8). . 9–85
9–49 CONTENTS OF KIT 9 (2113295–9). . 9–86
9–50 CONTENTS OF KIT D. . 9–86
9–51 CONTENTS OF KIT K (2122406–5). . 9–87
9–52 CONTENTS OF KIT M (2122406–3). . 9–87
9–53 CONTENTS OF KIT P (2122406–6). . 9–88
9–54 OTHER KITS AND TOOLS. . 9–89

office timeline 3.62 crack - Activators Patch 10–1 TOLL–FREE PHONE NUMBERS FOR GEMS SUPPORT CENTERS. 10–3


10–2 TOOL REQUIREMENTS FOR PLANNED MAINTENANCE. . 10–4

ix
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

intentionally blank

x
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 filemenu tools alternative office timeline 3.62 crack - Activators Patch Direction 46–030402

1–1 INTRODUCTION

1–1–1 Purpose of Service Manual


This service manual provides installation and servicing of LOGIQ 700. Study this service manual before installing
t
or repairing a LOGIQ 700 system. Store the service manual near the unit for easy reference. Review the contents
periodically for warnings, safety precautions, maintenance requirements, and proper procedures.

1–1–2 Purpose of Section


This section describes important issues related to safely servicing this ultrasound machine. The service provider must
read and understand all the information presented here before installing or servicing a unit.

1–1–3 Purpose of Operator Manual


The Operator Manual should be fully read and understood before operating the LOGIQ t 700 and also kept near
the unit for quick reference.

1– 2
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–2 IMPORTANT CONVENTIONS

1–2–1 Conventions Used in Book


Model Designations. There are three basic models of the LOGIQ 700. These models are referenced throughout
this manual as V1, V2, and V3. The V1 was the initial model. The V2 model resulted when Electromagnetic
Compatibility (EMC) provisions were added. The V3 model retains the EMC provisions, but uses 16–channel Time
Delay boards (TDs) rather than 8–channel TDs.

Icons. Pictures, or icons, are used wherever they will reinforce the printed message. The icons, labels and
conventions used on the product and in the service information are described in this chapter.

Safety Precaution Messages. Various levels of safety precaution messages may be found on the equipment and
in the service information. The different levels of concern are identified by a flag word that precedes the precautionary
message. Known or potential hazards are labeled in one of three ways:

DANGER Danger is used to indicate the presence of a hazard that will cause severe
personal injury or death if the instructions are ignored.

WARNING Warning is used to indicate the presence of a hazard that can cause
severe personal injury and property damage if instructions are ignored.

CAUTION Caution is used to indicate the presence of a hazard that will or can cause
minor personal injury and property damage if instructions are ignored.

Notes. Notes are used to provide important information about an item or a procedure. Be sure to read the notes:
the information contained in a note can often save you time or effort.

Diagram Conventions. Conventions used in the diagrams within the service manuals include:

Circuit blocks on circuit cards that reside in the Front End (FE) card cage are
shaded in dark gray.

Circuit blocks on circuit cards that reside in the Back End (BE) card cage are
shaded in light gray.

ÉÉÉÉ
ÉÉÉÉ Circuit blocks or parts that are optional are shaded with angled stripes.

ÉÉÉÉ
A3–P2–A32 Designators are used to describe physical location and component types. In the
example at the left: A3 is the slot, P2 is the connector, A32 is the pin.
MC_ALM_40P0–P Signal names usually indicate their source and destination. The signal name
shown originates on the MC (master controller) and is provided to the ALM
(Acoustic Line Memory). When a signal is delivered to a part, and the part does
not currently use that signal, the signal’s name is listed but a line is drawn
through the name.

1– 3
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–2–2 Standard Hazard Icons


Potential people hazards are indicated in the service and operating information by the icons shown and defined in
Table 1–1.
TABLE 1–1
HAZARD ICONS

Icon Definition Location


Biological S Possible infection due to handling contaminated S cleaning and care instructions
Hazard equipment.
S sheath and glove guidelines
S Patient/user injury or adverse reaction to
contact materials.
Electrical S Electrical shock hazard to patient, operator, or S covers removed
Hazard service person.
S probe handling
S Electrical micro-shock to patient, e.g.,
ventricular fibrillation initiated. S patient connections
–or–
S back panel connections

3D-Coat Full Version Crack S peripherals

Moving S Console, accessories or optional storage S On unit


Hazard devices could fall on patient, operator, or service
rep. S Moving unit instructions

S Collision with persons or objects could result in S Raising unit with jack screws
injury while maneuvering or transporting the
system.
S Injury while moving or lifting the console

Acoustic S Injury or tissue damage from ultrasound S system performance check


Output radiation
Hazard

Smoke S Injury or adverse reaction from fire or smoke. S Replacing fuses


& Fire S Mains supply
Hazard

Non– S Failure, erratic operation or output error due to S RF leaks


Ionizing RF interference to or from other electrically
operated equipment S shields and enclosures
Radiation
S grounding

1– 4
GE MEDICAL SYSTEMS tableau product key free download - Free Activators LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–2–3 Product Icons


These icons and labels that can be found on the LOGIQ 700 are shown and defined in Table. The V1 LOGIQ t
700 console is rated as a TYPE B unit; the V2 and later are type BF. The probe interface (XDIF) is rated BF on all
consoles.
TABLE 1–2
PRODUCT ICONS (Sheet 1 of 2)

Label Definition Location

Rating Plate
Reports important manufacturing information about S rear of unit, near AC cord
S under monitor
the equipment. A V1 unit is hardware model
Made in the 46–312100G(n). A V2 unit is the hardware model for
S on each probe
USA EMC and it is identified by 2132700(–n). The V3 unit
has 16 channel TDs and is model 2148800(–n).
Certification label Laboratory logo or labels denoting conformance with S rear of unit
S under front of monitor
meets our stan- industry safety standards such as ETL, TUV, or IEC.
dards
This precaution is intended to prevent injury that may
result if only one person attempts to move the unit
S rear of unit
considerable distances or on an incline due to the
weight of the unit.

Equipment Type B (man symbol) IEC 878-02-02


indicates equipment having a common degree of
S rear of V1 unit (46–model)
protection from electric shock.
Class 1
Equipment Type BF (man in the box symbol) IEC S near XDIF connectors
S non-surgical probe
878-02-03 indicates B Type equipment having even
more electrical isolation than Type B because it is
intended for intimate patient contact.
S rear of V2 unit (2132700) or
V3 (2148800)
Equipment Type CF (heart in the box symbol) IEC
878-02-05 indicates equipment having a high degree
S surgical probe
ESET Smart Security Crack + Torrent Download (2020) of protection, electrical isolation, suitable for direct
cardiac contact.
The CE Mark of Conformity indicates this machine
conforms with the Council Directive 93/42/EEC
S rear of V2 or V3 unit
0459
Testing Lab in New York, USA, has verified the
machine conforms to UL 544 standard for medical and
S rear of unit
dental equipment and Canadian standard 601 for
R LightBurn Keygen electromedical equipment.
CLASS A means the machine is intended for
commercial, not residential, use.
S rear of V2 or V3 unit
GROUP 2 means the machine intentionally uses
CISPR 11 / EN 55011 Radio Frequency. GROUP 1 means it creates RF
CLASS: A GROUP: 2 unintentionally because it is an electronic device.
CLASSE: A GROUPE: 2
t
The LOGIQ 700 is not designed for use near S rear of unit
flammable anesthetic gases.

1– 5
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

download ccleaner pro - Crack Key For U TABLE 1–2
PRODUCT ICONS (Sheet 2 of 2)

Label Definition Location


Top symbol means pressing the switch at this end will S front of unit: On/off switch
apply AC power to the unit. On this unit, it will also boot
the software.

Bottom icon means pressing the switch at this end will


remove AC power to the unit after the solid state relay,
but up to that point AC power is still present.

You must disconnect the power cord or set the


MAINS circuit breaker, CB1, off which is all the way
down, to disconnect AC power to unit.
Round symbol indicates the switch side that removes S AC off circuit breaker (CB1)
AC power
Dangerous voltage or amperage present S behind cover trim to warn that
electrical power inside all
covers is dangerous

Refer to detailed instructions in the Service Manual S rear cover

windows 7 activator free download for 32 bit & 64 bit S bulkhead

proshow producer 9.0.3797 crack S top edge of lower front cover


under trim guard
S on frame in three places
This label warns that electronic part failure is possible S on electronic parts
due to damage caused by dissipation of large electrical
potential differences. It warns you to practice ESD S parts handling, packaging,
prevention. See page 1– 16. servicing instructions
This label is a reminder to the service person that the S on the XDIF assembly near
linear bearing that drives the control panel up and down the gas spring
is under pressure and sound forge pro 12 - Free Activators be blocked when the
gas spring is removed.

Indicates AC MAINS potential. S product schematics

S PS1 (bulk converter)

S peripheral back panels


Indicates Main protective earth terminal S AC distribution panel

S product schematics

Indicates an earth GROUND potential. S product schematics

S nikon camera control pro 2 license Indicates EQUIPOTENTIALITY. S rear of unit

1– 6
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–3 SAFETY CONSIDERATIONS

1–3–1 Human Safety


Biological
Hazard

DANGER Neurological procedures must NOT be done on patients with


Creutzfield–Jacob disease because there is no way to adequately sterilize
a probe that has been used this way.

WARNING Neurological procedures must be final draft 10 crack - Activators Patch intraoperative should be done with


the use of legally marketed, sterile, pyrogen free probe sheaths.

WARNING Probes used during neurological surgery must NOT be sterilized with
liquid chemical sterilants because of the possibility of neuro toxic
residues remaining on the probe.

CAUTION Do not handle soiled or contaminated equipment. Illness or infection may


result. Probes and related accessories must be cleaned and disinfected
according to the user instructions before servicing.

Acoustic
Output
Hazard

CAUTION The ultrasound energy from this system can produce heat and mechanical
injury in tissue when operated at maximum acoustic power settings. This
system conforms to AIUM, NEMA, and FDA standards for output display
and control. It is capable of producing output levels higher than older
abdominal and general purpose systems. To avoid possible injury, the
operator must become familiar with all system controls and, in particular,
the operation of the acoustic output control and display.

Note
Refer to the User’s Manual for complete user instructions.

1– 7
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–3–2 Mechanical Safety

DANGER Should you need to replace a rear wheel, follow the removal and
installation procedures given in Section 5. The rear wheel assembly has
two springs. If the wrong screws are removed, the springs can cause the
assembly to disintegrate with explosive force.

WARNING When the unit is raised for a repair or moved along any incline, use
extreme caution since it may become unstable and tip over if positioned at
angles greater than 10_.

WARNING Ultrasound probes are highly sensitive medical instruments that can easily
final draft crack mac - Activators Patch be damaged by improper handling. Use care when handling and protect
from damage when not in use. DO NOT use a damaged or defective probe.
Failure to follow these precautions can result in serious injury and
equipment damage.

CAUTION The LOGIQt 700 weighs approximately 300 kg (660 lbs). Care must be
used when moving it or replacing its parts. Failure to follow the
precautions listed below could result in injury, uncontrolled motion and
costly damage. ALWAYS:
Be sure the pathway is clear.
Use slow, careful motions.
Use two people when moving on inclines or lifting more than 23 kg (50 lb).

Note
Special care should be taken when transporting the unit in a vehicle:

Secure the unit in an upright position.


DO NOT use the Control Panel as an anchor point.
Place the probes in their carrying case.
Eject any magneto optical drive (MOD) disk from the MOD.

CAUTION The control panel can be elevated by pressing the actuator button that
pulls down the top bracket of the gas spring that places the linear bearing
under pressure in the upward direction. Take care when you activate this
gas spring. You could be hit by the panel or hurt your hand by upward
movement of the linear bearing after the panel is removed and the spring
pressure is released. Take care when you repair the elevation assembly.

Monitor. Keep the heat venting holes unobstructed to avoid overheating of the monitor.

1– 8
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–3–3 Electrical Safety

DANGER Only qualified service personnel should remove any covers or panels.
Electrical hazards exists at several points inside including the AC
distribution assembly, two backplanes, three power supplies, isolation
transformer, and circuit boards. Become thoroughly familiar with all
hazardous voltages and high current levels to avoid accidental contact.

WARNING High current power supplies even at 5 volts can cause welding of leads,
jewelry or other conductive materials.

Safe Practices. There are additional rules to protect the service person, operator and patient from exposure to
dangerous electric power.

D Only connect the unit to a properly grounded, hospital grade power outlet. Do not use a three to two
prong adapter. This defeats safety grounding.

D Do NOT use a 20 Amp to 15 Amp adapter on 120 Vac machines that require a 20 Amp cord.
D To prevent dangerous leakage currents, do NOT use an extension cord or non–listed peripherals that
have not been certified.

D When ESD protection is needed (replacing boards and drives), the service person should be trained in
the electrical hazards of this unit, wear the ESD wrist strap and leave the unit plugged to maintain
ground.

CAUTION If you connect the LOGIQt 700 to a network, isolate the LOGIQt 700 from
that network by placing a user provided 500 V isolation device between the
Bulkhead Ethernet connector and the network T connector. The LOGIQt
700 has stricter isolation requirements than computers.

ONE EXAMPLE OF A
USER PROVIDED SERVICE ETHERNET
ISOLATION DEVICE 8 1
1 5
6 9 15 9
P P P
O O O
R R R
symantec endpoint protection repack - Free Activators T T T
AUI Transceiver 1 2 3

PRINT VIDEO OUT

Also, do NOT disconnect


! network here or here because
you will open the site’s network.

1– 9
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–3–3 Electrical Safety (Continued)

WARNING Ultrasound transducers can be easily damaged by improper handling.


Failure to follow these precautions can result in serious injury and
equipment damage.

Probes. A powered probe could injure someone if its internal parts contact a person through a conductive solution
or a break in the isolating material. Therefore:

D DO NOT immerse a probe into any liquid beyond the level indicated by the immersion level diagram
shown on its care card and the operators manual.

D DO NOT immerse a probe into any solution containing acetone, alcohol, bleach, detergent, iodine, or
hydrogen peroxide because these can break down its isolation. Avoid gels containing mineral oil or
lanolin.

D DO NOT drop probes or subject them to other types of mechanical shock or impact. Degraded
performance or damage such as cracks or chips in the housing may result.

D DO NOT kink, tightly coil, or apply excessive force on the probe cable. Insulation failure may result.
D Inspect the probe before and after each use for damage or degradation to the housing, strain relief,
lens, and seal. A thorough inspection should be conducted during the cleaning process.

D Perform electrical current leakage tests on a routine basis to check for cracks or other small defects.
D Avoid storage or cleaning temperature above 60_C (140_F).

1– 10
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–3–4 Label Locations


There are a number of labels on the LOGIQ 700. These labels provide important information. If the labels are worn
or missing, new labels should be ordered and installed. Illustrations 1–1 through 1–3 show these labels and their
locations.

rainmeter clock - Crack Key For U SUPPLIER MADE IN
COUNTRY
Discord Nitro Hack Crack With Torrent Complete Full Download [2021] MODEL
SERIAL NR.
On MANUFACTURED
Stand–by
Switch PRODUCT COMPLIES WITH D.H.H.S.
RULES 21 CFR SUBCHAPTER J.

ACHTUNG: DIESE IN DIESEM GERAT


ENTSTEHENDE RONTGEN STRAHLUNG
IST AUSREICHEND ABGESCHIRMT.
BESCHLEUNIGUNGSSPANNUNG.

Monitor
Certification

Shock Hazard
Behind Trim Cover TYPE BF
and on frame above IEC 878–02–03
the Back End cage, Probe Interface
below the Front End isolation level
boards and back-
plane too

ON
DANGEROUS VOLTAGE IEC 878–01–01
ATTENTION, CONSULT. IEC 878–03–01 0FF STAND–BY
IEC 878–03–02 IEC 878–01–02 IEC 878–01–05

LABELS FOUND ON FRONT OF LOGIQ 700


ILLUSTRATION 1–1

1– 11
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–3–4 Label Locations (Continued)

ETL TESTED
CAUTION CONFORMS TO
R UL STD 544 c
MathType 7.4.8 Crack + Product Keygen Full Version Free {2021} CERTIFIED TO
R
93182
Caution: United States law restricts CAN/CSA C22.2 NO.601–1
this device to sale or use by or on ETL LABORATORIES, INC.
the order of a physician. CORTLAND, NEW YORK 13045

DANGER – Explosion Hazard


Do not use in the presence
of flammable anesthetics. Back
(Near Ground Panel
Danger – Risque d’explosion. Ne Stud) (bulkhead)
pas employer en presence
d’anesthesiques inflammables. CAUTION: Power outage may occur.
To avoid circuit overload and possible loss of
Air Inlet
critical care equipment, make sure you DO
NOT have any other equipment operating on
300 kg the same circuit.

(On power cord)


FOR PROPER GROUNDING CONNECT
non TO HOSPITAL GRADE RECEPTACLE.
300 kg
120
Vac unit
V1 unit
(Near Rat-
ing Plate) SCSI Consult Service
CLASS I Unit isola- (Next to Main devices Manual for
CLASSE I tion level V2/V3 Units Breaker CB1) McAfee Antivirus 19.0.4016 Crack With Activation Key Free Download and cables details about
GENERAL ELECTRIC COMPANY are ESD safety, video,
MILWAUKEE, WISCONSIN MADE IN U.S.A. (Below Service Outlet) sensitive audio values
MODEL 46–312100G1
S/N 367US4 office timeline 3.62 crack - Activators Patch piracow driverdoc license key crack free - Free Activators and procedures
MANUFACTURED FEBRUARY 1995 120 V 2A

ËËËËËËËË
DESC LOGIQ 700
120V~

ËËËËËËËË
60Hz 16A
Maximum Rating
(of Service Outlet Rating Plate(s) for Options
System Rating Plate and Barcode capacity) Identify optional software and
Specific to Configured Mains (Not present if Service
hardware; located on flat part of
Outlet replaced by CB4)
Voltage and located below where frame above the power supplies
AC power cord attaches

0459
EQUIPOTENTIALITY V2 ( 2132700–n ) and V2 and V3 units are TYPE B
IEC 878–01–24 V3 (2148800–n) units CLASS A GROUP II Class 1
qualify for this rating devices IEC 878–02–02
LABELS FOUND ON BACK OF LOGIQ 700
ILLUSTRATION 1–2

vmix 21 pro crack - Activators Patch 1– 12
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–3–4 genymotion crack mac Label Locations (Continued)


Do not attach an AMA Probe Connector and parallels desktop black screen - Crack Key For U Probe
probe to the far right slot Cradle
! on the XDIF. An AMA
probe in that slot is
Spotify 1.1.51.380 Crack Activation Key - Activators Patch vulnerable to damage.

XDIF asm Probe ID


“326s”

also frequency
for France

Manufacturer’s Name OR
and address
FREQUENCY 5.0/D3.5–5.0 MHz FOR SURGICAL
MODEL NO PROBES
SERIAL NO 12345YM6 shows isolation level
JUNE 1994
Refer to probe care card and Operator Manual
FRAGILE for complete instructions on proper handling
Probe Rating Plate

TYPE BF TYPE CF ATTENTION, CONSULT.


IEC 878–02–03 IEC 878–02–05 IEC 878–03–02

LABELS FOUND ON PROBES


ILLUSTRATION 1–3

1– 13
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Zemana AntiMalware 3.2.28 Crack with Keygen Free 2021 Direction 46–030402

1–3–5 Lockout/Tagout Procedures

Electrical. The service person is responsible for the control of electrical energy to the unit. When installation, repair
or maintenance is needed, when contact with internal parts is possible, and when ESD protection is not required, the
service person controls the energy to the unit by unplugging the AC power cord from the outlet and keeping exclusive
control of that cord while installing, servicing or maintaining the unit. Service people who are trained in electrical safety
and the particular hazards that this unit presents are qualified to replace ESD sensitive parts which entails keeping
the unit plugged to ensure a good ground for the ESD wrist strap.

Step Procedure
1 Determine possible risk of contact with dangerous energy.
2 If any risk exists, unplug AC power cord from outlet.
3 Do not allow anyone to connect the cord until you are done.

CAUTION:
Stored Mechanical Energy

To prevent injury or damage to


electronics, the linear bearing must be
supported when gas spring is removed.

Mechanical. When removal of the gas spring is needed, take care to not allow the linear bearing to fall down on
you. You should raise the linear bearing to its highest elevation to facilitate gas spring removal, but be sure to block
the fall of the linear bearing with a piece of wood or similar device that will occur once the gas spring is removed.

1– 14
GE MEDICAL SYSTEMS kls backup alternative - Crack Key For U LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–4 EMC, EMI, AND ESD

1–4–1 Electromagnetic Interference (EMI)


ElectroMagnetic Interference (EMI) describes the energy that is emitted or conducted from an operating electronic
system. This energy can be in many forms. It IES VisualAnalysis Free Download be radio frequency (RF) waves, magnetic fields, electrical potential
variations, electrical current leakage.

1–4–2 Electromagnetic Compatibility (EMC)


ElectroMagnetic Compatibility (EMC) describes an electronic system that curbs the electromagnetic influence
between electronic systems. This means it minimizes how much electromagnetic energy it emits or conducts into the
surroundings so that this energy is not dangerous nor distorts its own or another system’s operation. It means it
minimizes the electromagnetic interference from itself or other electronic systems.

D Only use power and signal wiring provided or specified by GE Medical Systems. Never use an adaptor
to connect a power source plug. Do not change cable length or material. Use of cables not properly
shielded and grounded may result in the equipment causing or responding to radio frequency
interference in violation of the European Union Medical Device Directive (CE mark) and FCC
regulations.
D Use the peripherals specified by GE Medical Systems. Do NOT allow the monitor or peripheral cables
to lie across the top of the Front End cage.
D Locate the unit as far as possible from other electronic equipment.
D Install the unit, peripherals, and replacement parts only as detailed in the Preinstallation Checks,
Installation Chapter, Assembly Chapter, Renewal Parts Chapter, and the Peripheral Install manual.
Use CE certified parts.
D Reinstall all hardware before returning the unit to clinical use.
D If unit is connected to a network, use only CE marked components for hubs, transceivers, peripherals,
modems. Make sure transceiver is LOCKed into place on bulkhead (Ethernet) AUI connector.
D It is recommend that coax wire is used to connect ethernet to hub. FIBER OPTIC IS BEST for
problem sites but expensive and requires an optical HUB. If unshielded twisted pair (UTP) is
used, wrap a ferrite ring or clamp to cable.

1–4–3 CE Compliance
The V2 and V3 LOGIQt 700 units conform to all applicable conducted and radiated emission limits and to immunity
from electrostatic discharge, radiated and conducted RF fields, magnetic fields and power line transient requirements.
Applicable standards are: 47CFR Part 18, IEC 601–1–2, and 806–13.

CISPR 11 / EN 55011
Hot Virtual Keyboard Activation key WYSIWYG Web Builder Crack 16.4.0 + Serial Number Download [Latest] CLASS: A GROUP: 2
0459 CLASSE: A GROUPE: 2

ATTENTION For CE Compliance, it is critical that all covers, screws, shielding, gaskets,
! mesh, clamps, are in good condition, installed tightly without skew or
stress. Proper installation following all comments noted in this service
manual is required in order to achieve full EMC performance.

1– 15
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–4–4 Electrostatic Discharge (ESD) Prevention


The circuit boards and disk drives for this system contain densely populated
electronic components which are expensive and electrically sensitive. An
electrostatic discharge (ESD) between 100 to 1000 V may damage a
component. This is substantially less than the 3000 V discharge needed to feel
any static. The ESD may cause an immediate failure, or it may weaken
components to produce future, intermittent problems.
Proper Handling. Always use the ESD strap. Put the board or drive inside an anti–static bag or approved container
before it is handled by a non–grounded person, moved from the grounded (ESD safe) area, or stored. Always place
the board or drive top side up on a flat surface when it is unmounted. Never handle the part outside its anti–static
container unless the surrounding surfaces and you are grounded. Discharge the outside of the container before
transferring the part.

TABLE 1–3
RULES FOR PREVENTING OR LESSENING ESD DAMAGE

ESD rule Details


Turn power OFF Turn power OFF before you touch, insert or remove parts having electronic
components.

Use wrist strap Unless you are working near a live 30 V or more circuit, ground your wrist to the
specially designed ground plug on the unit before you touch any parts. This includes
connecting cables to a drive, board, device, or bulkhead.

Test your strap while wearing it with a specially designed meter. If it fails, it may
be due to dry skin; apply lotion to your wrist and test again. Throw away any strap that
is more than three months old.

Don’t let anything Do not let your sleeve, tie, pen, Styrofoam cup, plastic manual binder or clothing touch
but your grounded the circuit board or disk drive. Wearing cotton clothes and shoes with rubber like soles
hand touch the may lessen how much ESD you generate walking across the room. Working in a room
electronic FRU where relative humidity is under 20% can generate electrostatic voltages of 7000 to
35,000 Volts. However it only takes 100 V to destroy an EEPROM.

Use proper han- Handle circuit boards, disk drives, or any electronic part as little as possible. Place
dling them on an anti–static workbench pad or in a static dissipative bag that you have
t
grounded. Do not stack them. LOGIQ 700 boards should be stored in an
anti–static container. Pink, blue, or clear poly bags do NOT give protection from
softmaker office review external sources of ESD. If you have an anti–static box, you can use the box as a
static free work surface once you ground it.

Treat failed parts You don’t want to add to the expense, complication and future unreliability of a part by
the same as good allowing it to be repeatedly zapped.

Use a special When you use a vacuum, be sure it is the type that prevents electrostatic buildup.
vacuum

1– 16
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–5 CUSTOMER ASSISTANCE


TABLE 1–4
PHONE NUMBERS FOR CUSTOMER ASSISTANCE

Location Phone Number Comments


For GE Service If this equipment does not work as indicated in
the Operators Manual, contact your Support
USA (1) 800–437–1171 Center. Have the system ID number available
phpstorm free - Free Activators when you call.
CANADA (1) 800–668–0732

LATIN & SOUTH AMERICA (1) 305–735–2304

JAPAN (81) 426–56–0019


Contact your European distributor or GE
EUROPE representative.
Ultrasound Applications The phone number is for non emergency
purposes only since you may not receive an
USA (1) 800–682–5327 immediate response.
Diagnostic Imaging If you need information about an accessory,
Accessories (DIA) contact DIA.

USA (1) 800–472–3666


Direct Customer Order office timeline 3.62 crack - Activators Patch If the customer has a need for parts ID or parts
Service (DCOS) ordering, contact DCOS.

USA (1) 800–558–2040

If you remove any The Part Number is silkscreened on


circuit boards, practice the board usually near the bar code
good ESD prevention. window - Activators Patch which holds the part’s Serial
Also check pins, Number. You may need to refer to
connectors and these labels to complete site
recuva crack getintopc - Activators Patch paperwork or answer questions from
backplane connectors
Support Center. Do not use any
for dust or dirt. These
number that ends in a ‘P.’ If it is a
items can cause
‘46–’ Part Number, it will end in ‘G.’
system failures.
Possible GE MEDICAL SYSTEMS
Bar Code
Locations
fonepaw download - Free Activators BE1234

LOCATING PART NUMBERS ON CIRCUIT CARD


ILLUSTRATION 1–4

1– 17
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

intentionally blank

1– 18
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

2–1 PURPOSE OF SECTION


This section provides the information required to plan and prepare for the installation of a LOGIQ 700. t
Included are descriptions of the facility and electrical needs to met by the purchaser of the unit. A checklist
is also provided at the end of this section to help determine whether the proper planning and preparation
is accomplished before the actual equipment installation is scheduled.

2–2 GENERAL INFORMATION

2–2–1 Time and Manpower Requirements


Site preparation takes time. Begin Preinstallation checks at least six weeks prior to the desired delivery date to allow
enough time to make any changes.

Have two people available to deliver and unpack the LOGIQ 700. t
Attempts to move the unit considerable distances or on an incline by one
person could result in injury or damage or both.

2–2–2 Important LOGIQ 700 Characteristics


Physical Dimensions. The physical dimensions of the LOGIQ 700 unit are summarized in Table 2–1 and
Illustration 2–1.

TABLE 2–1
PHYSICAL DIMENSIONS OF LOGIQ 700

Dimension Console Size Shipping Size


Height 1510 mm (60 in) 1730 mm (68 in)
Width 656 mm (26 in) kaspersky total security 2018 crack - Crack Key For U 870 mm (34 in)
microsoft office 2019 download crack - Free Activators Depth 1207 mm (48 in) 1420 mm (56 in)
Weight 360 kg (800 lb) 400 kg (880 lb)

2–2
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

2–2–2 Important LOGIQ 700 Characteristics (Continued)

1510 mm

1207 mm github net limiter - Free Activators mm

ENVELOPE DIMENSIONS FOR LOGIQ 700


ILLUSTRATION 2–1

Floor Load. Given the unit’s weight, distance between its wheels, and estimating the on board peripheral weight,
the floor load is approximately 1500 kg/m2 (300 lbs/ft2).

Acoustic Noise Output. The acoustic noise output is 60 dB max when measured at 0.45 m (1.5 ft) from the operator
panel at a height of 1.52 m (5 feet).

2–3
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

2–2–3 EMI Limitations


Ultrasound machines are susceptible to electromagnetic interference from radio frequencies, magnetic fields, and
t
transients in the air or wiring. They also generate EMI. The LOGIQ 700 complies with limits for a Group 2, Class
A Medical Device as stated in EN 60601–1–2. However there is no guarantee that interference will not occur in a
particular installation.

Possible EMI sources should be identified before the unit is installed. Electrical and electronic equipment may produce
EMI unintentionally as the result of a defect. These sources include medical lasers, scanners, cauterizing guns,
computers, monitors, fans, gel warmers, microwave ovens, light dimmers and portable phones. The presence of a
broadcast station or broadcast van may also cause interference.

TABLE 2–2
EMI PREVENTION/ABATEMENT

EMI rule Details


Be aware of RF Keep the unit at least 5 meters or 15 feet away from other EMI sources.
sources Special shielding may be required to eliminate interference problems caused
by high frequency, high powered radio or video broadcast signals.
Ground the unit Poor grounding is the most likely reason a unit will have noisy images. Check
grounding of the power cord and power outlet.
Replace all After you finish repairing or updating the system, replace all covers and
screws, RF tighten all screws. On a V2/V3 unit any cable with an external connection
gaskets, covers, requires a magnet wrap at each end. Tightly wrap the mesh around the I and
cores Q connectors on the SS. Install the shields over the front of both card cages.
Loose or missing covers or RF gaskets allow radio frequencies to interfere
with the ultrasound signals.
Replace broken If more than 20% or a pair of the fingers on an RF gasket are broken, replace
RF gaskets the gasket. Do not turn on the unit until any loose metallic part is removed.
Do not place Never place a label where RF gaskets meet the unit. Otherwise, the gap
labels where RF created will permit RF leakage. Or, if a label has been found in such a
gaskets touch position, move the label.
metal
Use GE specified In a V2 or V3 unit, the interconnect cables are grounded and require EMI
harnesses and magnets and other shielding. Also, cable length, material, and routing are all
peripherals roboform activation code crack - Free Activators important; do not change from what is specified.
Take care with Cellular phones may transmit a 5 V/m signal; a signal greater than 3 V/m
cellular phones could cause image artifacts. Use a regular phone within 5 m (16 ft) of the unit.
No power line Filters placed between the power main and unit may cause problems; do not
filters use one unless authorized by GE Engineering.
Properly dress Do not allow cables to lie across the top of the Front End cage. Loop the
peripheral cables excess length for peripheral cables inside the right end of peripheral cover.
Attach the monitor cables to the frame.

2–4
GE MEDICAL SYSTEMS Yamicsoft Windows 10 Manager 3.4.9.0 Crack+ Activation Code 2021 - Free Activators LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

2–2–4 Purchaser Responsibilities


The work and materials needed to prepare the site is the responsibility of the purchaser. Delay, confusion, and waste
of manpower can be avoided by completing preinstallation work before delivery. Use the Preinstallation checklist to
verify that all needed steps have been taken. Purchaser responsibility includes:

D Procuring the materials required.


D Completing the preparations before delivery of the ultrasound system.
D Paying the costs for any alterations and modifications not specifically provided in the sales contract.
D Paying the phone line installation and monthly phone line charges
Note
All electrical installations that are preliminary to the positioning of the equipment at the site prepared
for the equipment must be performed by licensed electrical contractors. Other connections between
pieces of electrical equipment, calibrations, and testing must also be performed by qualified
personnel. The products involved (and the accompanying electrical installations) are highly
sophisticated and special engineering competence is required. All electrical work on these products
must comply with the requirements of applicable electrical codes. The purchaser of GE equipment
must only utilize qualified personnel to perform electrical servicing on the equipment.

The desire to use a non–listed or customer provided product or to place an approved product further from the system
than the interface kit allows presents challenges to the installation team. To avoid delays during installation, such
variances should be made known to the individuals or group performing the installation at the earliest possible date
(preferably prior to the purchase).

For reference purposes, the list of approved peripherals at the publishing date of the last revision of this manual is:

Wise Care 365 Free 5.7.1 Build 571 Crack With Activation Key Free D Sony Video Camera Recorder (VCR), SVO9500MD2


D Sony Color Printer, UP1800MD
D Sony Color Printer, UP2950MD
D Sony Color Printer, UP5600MD
D IIE Multi–image Camera, MP460II
D Sony Monochrome Printer, UP890MD
The ultrasound suite must be clean prior to delivery of the machine. Carpet is not recommended because it collects
dust and creates static. Potential sources of EMI (electromagnetic interference) should also be investigated before
delivery. Dirt, static, and EMI can negatively impact system reliability.

2–5
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

2–3 FACILITY NEEDS


A recommended floor plan that uses a 4.3 by 5.2 meter (14 by 17 foot) area is shown in Illustration 2–2. Another
floor plan that uses a minimal 2.5 by 3 meter (8 by 10 foot) area is shown in Illustration 2–3.

2–3–1 Required Features


D Dedicated single branch power outlet of adequate amperage (see Electrical Requirements on page
2–9) meeting all local and national codes is less than 2.5 m (8 ft) from the unit’s proposed location

Hot Virtual Keyboard Activation key D Door opening is at least 76 cm (30 in) wide


D Proposed location for unit is at least 0.3 m (1 ft) from the wall for cooling
D Power outlet and place for any external peripheral are within 2 m (6.5 ft) of each other with peripheral
within 1 m of the unit to connect cables.
The LOGIQt 700 has four outlets inside the unit. One is for the monitor and
three for on board peripherals.
D Power outlets for other medical equipment and gel warmer
D Power outlets for test equipment and modem within 1 m (3.2 ft) of unit
D Clean, protected space to store transducers (in their cases or on a rack)
D Material to safely clean probes (done with a plastic container, never metal)
D For InSite to be installed, the site needs either a dedicated, analog phone line with a modular jack for
the modem or a GE InSite Multiplexer setup.

2–3–2 Desirable Features


D Door is at least 92 cm (3 ft) wide
D Circuit breaker for dedicated power outlet is easily accessible
utorrent pro crack for pc D Sink with hot and cold water
D Receptacle for bio–hazardous waste, like used probe sheaths
D Emergency oxygen supply
D Film viewer
D Storage for linens, film, equipment
D Nearby waiting room, lavatory, and dressing room
D Dual level lighting (bright and dim)
D Lockable cabinet ordered by GE for its software and proprietary manuals

office timeline 3.62 crack - Activators Patch 2–6
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 allavsoft video downloader converter v3 Direction 46–030402

Dedicated analog phone line


or GE InSite Multiplexer Dedicated power outlet
Power outlet optional
GE cabinet

Peripheral(s)
Film for software

External
Processing and manuals
Room
LOGIQ

Examination Table
700

Probes/PM
Linens
Film Viewer

Cabinet
File Counter

m3 data recovery 5.8 license key - Activators Patch 193 cm
Top
Zoom Player Max Serial Number Stool

Sink
Suction
Line
61 cm
Emergency
Oxygen
Navicat Premium 12.1.4 Serial Key - Free Activators each square
equals one square foot WPS Office Premium Free Activate 107 cm
malwarebytes anti malware for mac 42 in
windows 10 pro activation key 2019 - Activators Patch RECOMMENDED (14 BY 17 FEET) FLOOR PLAN
ILLUSTRATION 2–2

Film Viewer Linens


Sink
Film Supplies Folder Lock Key 7.8.5 Crack + Serial Key Free Download 2021 Probes/supplies
Power outlets
External
Peripheral(s)

LOGIQ
Stool 700
Dedicated power outlet
61 cm

Examination Table GE cabinet


for software
catia v5 torrentz2 - Free Activators 193 cm and manuals
76 cm (optional)
30 in
MINIMAL(8 BY 10 FEET) FLOOR PLAN
ILLUSTRATION 2–3

2–7
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

2–3–3 Environmental Limits


t
In order for the LOGIQ 700 to operate well, the unit’s operating environment must be controlled. Care also must
be taken when a unit is transported or stored. Avoid humidifiers because their moisture damages electronic parts.
The environmental limits for operation, storage, and transport are listed in Table 2–3.

TABLE 2–3
LOGIQ 700 ENVIRONMENTAL LIMITS

Temperature Humidity Maximum Altitude


Patient Comfort 20 to 26_C (68 to 79_F) 50 to 70% noncondensing
Operational 15 to 30_C (59 to 86_F) 5 to 85% noncondensing 3050 m (10,000 ft)
Storage 0 to 55 _C (30 to 130_F) 5 to 85% noncondensing 3050 m (10,000 ft)
Transport (for less –20 to 55_C 5 to 85% noncondensing 10,600 m (35,000 ft)
than 16 hrs) (–4 to 130_F)

After being transported, the unit may be very cold or hot. If a very cold machine is operated, condensation will form
on the electronic components which could damage the Nitro Pro 13.42.3.855 Crack drive, VCR, or circuit boards. If a very hot machine is
turned on, the host will shut down operation, or the power supplies will stop working. Electronic components could
fail; plastic parts could deform.

If a unit arrives too hot or cold (outside the Operational Temperature Range, allow the unit to acclimate before applying
power. A one hour wait is recommended for each 2.5_C increment the unit’s temperature is below 15_C or above
30_C. However, a wait of one hour per 15_C increment the temp is outside the unit’s operating range may
be okay. A summary of these waiting times is office timeline 3.62 crack - Activators Patch in Table 2–4.

TABLE 2–4
WAITING TIME PRIOR TO OPERATING A UNIT THAT ARRIVES TOO HOT OR COLD

_C –40 –35 –30 –25 –20 –15 –10 –5 0 5 10 15 20 25 30 35 40 45 50 55


_F –40 –31 –22 –13 –4 5 14 23 32 41 50 59 68 77 86 95 104 113 122 131
Best hrs 22 20 18 16 14 12 10 8 6 4 2 0 0 0 0 2 4 6 8 10
OK hrs 3.6 3.3 3 2.6 2.3 2 1.6 1.3 1 .6 .3 0 0 0 0 .3 .6 1 1.3 1.6

2–3–4 Cooling
The cooling requirement for the LOGIQt 700 is 6500 BTU/hr. This figure does not include cooling needed for lights,
people, or other equipment in the room. Each person in the room places an additional 300 BTU/hr demand on the
cooling system.

2–3–5 Lighting
Bright light is needed for system installation, updates and repairs. However, operator and patient comfort may be
optimized if the room light is subdued and indirect. Therefore a combination lighting system (dim/bright) is
recommended. Keep in mind that lighting controls and dimmers can be a source of EMI which could degrade image
quality. These controls should be selected to minimize possible interference.

2–8
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

2–4 ELECTRICAL NEEDS

2–4–1 LOGIQ 700 Power Configurations


The LOGIQ 700 can be configured to any of the nominal power ratings listed in Table 2–5.

TABLE 2–5
LOGIQ 700 POWER RATING CONFIGURATIONS

system power peripheral power V1 model V2 model V3 model


120 V 20 Amp line 500 VA allocated for 120 V peripherals 46–312100G1 2132700
220 V 10 Amp line 500 VA allocated for 120 V peripherals 46–312100G2 2132700–2 2148800–2
240 V 10 Amp line 500 VA allocated for 240 V peripherals 46–312100G3 2132700–3 2148800–3
200 V 10 Amp line 500 VA allocated for 100 V peripherals 46–312100G4 2132700–4
200 V 10 Amp line 500 VA allocated for 120 V peripherals 46–312100G5 2132700–5
120 V 20 Amp line 15A plug IVT BlueSoleil 10.0.498.0 Crack Keygen Activation Key {Latest 2021} Free *500 VA allocated for 120 V peripherals 46–312100G6 2132700–6 2148800
100 V 15 Amp line 500 VA allocated for 100 V peripherals eset internet security 14 license key 2148800–4
* Includes power used by monitor

2–4–2 Inrush Current


For a 120 Vac V1 unit, inrush current is 150 to 175 A for up to four ms. For all other power configurations, including
V1 units with the Soft Start design, inrush will be less than 70 A.

2–4–3 Site Circuit Breaker

CAUTION POWER OUTAGE MAY OCCUR


prisms software t
The LOGIQ 700 requires a dedicated single branch circuit. To avoid
circuit overload and possible loss of critical care equipment, make sure
you DO NOT have any other equipment operating on the same circuit.

It is recommended that the branch circuit breaker for the machine be readily accessible. It should have at least a five
times the rated current tolerance.

2–4–4 Site Power Outlets


A dedicated AC power outlet must be within reach of the unit without extension cords. Other outlets adequate for the
external peripherals, medical and test equipment needed to support this unit must also be present within 1 m (3.2 ft)
of the unit. Electrical installation must meet all current local, state, and national electrical codes.

2–4–5 Unit Power Plug


If the unit arrives without a power plug, or the wrong plug, the installation engineer must supply what is locally required.

2–4–6 Power Stability Requirements


Monitor the site’s line voltage for a week before installation. The voltage should be stable, remaining within 10 % of
the unit’s rated value. In addition, line frequency should fall between 47 and 63 Hertz.

Power transients must be less than 25% over nominal peak voltage for less than 1 ms for any type of transient. This
includes line frequency, synchronous, asynchronous, or aperiodic transients.

Note
If the site’s power line voltage does not meet the requirements outlined, it is suggested that a ferro
resonant Uninterruptable Power Supply (UPS) be provided. A tap switching line conditioner is not
recommended because the switching transients can exceed the limits specified for the LOGIQ 700.

2–9
GE MEDICAL SYSTEMS LOGIQ 700 BASIC CompanionLink Professional Offline Installer MANUAL
REV 5 Direction 46–030402

2–5 DICOM OPTION PRE–INSTALLATION REQUIREMENTS

2–5–1 Information Required from Customer’s Network Administrator


t
To configure the LOGIQ 700 to work with other network connections, the site’s network administrator
must provide information to complete the form in Illustration 2–4. Ensure that there are no spaces in any
field of the form except for those fields under PHYSICAL LOCATION. Entries must include:

D A host name, local port number, AE Title, IP address and Net Mask for the LOGIQt 700.
D The IP addresses for the default gateway and other routers at the site for ROUTING INFORMATION
D The host name, IP address, port and AE Title for each device the site wants connected to the
LOGIQt 700 for DICOM APPLICATION INFORMATION.

LOGIQ 700
Host Name Local Port IP Address . . .
AE Title
Net Mask . . .

ROUTING INFORMATION GATEWAY IP Addresses


Destination
IP Addresses Default . . .

ROUTER1 . .
ROUTER2 . .
ROUTER3 . .
DICOM APPLICATION INFORMATION
NAME AE TITLE IP ADDR PORT
Store 1 converter for video . . .
Store 2 . . .
Print 1 . . .
Print 2 . . .
Print 3 . . .
Print 4 . . .
Sched . . .

PHYSICAL LOCATION
Store 1
Store 2
Print 1
Print 2
Print 3
Print 4
Sched

WORKSHEET FOR DICOM NETWORK INFORMATION


ILLUSTRATION 2–4

2–10
GE MEDICAL SYSTEMS Never Apart Crack LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

2–5–2 Information Required from LOGIQ 700 User


With the DICOM Option, both the locally connected peripherals and remotely connected DICOM devices can be used
by the operator. With system software version R6.2 or later, four keystroke combinations can be assigned to print or
copy images. Each one of these keystroke combinations can cause more than one action to occur at the same time.
And, the multiple actions can include both local and remote events.

The customer must specify the actions that each of four keystroke combinations will initiate. Make a note of these
actions and the associated device’s name and IP address or other details that may be helpful.

Device Name nikon camera control pro 2 license P1 P2 Shift+ Shift+


AVG Secure Browser Free Download P1 P2

Choose only one per key:

This key will send GRAY image file


This key will send COLOR image file
apowermirror 1.4.3.3 crack - Activators Patch Choose only one per key:

save image on Hard Drive


copy image to MOD
office timeline 3.62 crack - Activators Patch Choose only one per key:
Must choose at least one in the group above or below this remark for asterisk in first group

print image to device connected to Port 1


print image to device connected to Port 2
print image to device connected to Port 3
print image to device connected to Print
print image to device connected to Expose
Choose only one per key:

print image to DICOM device A


print image to DICOM device B
print image to DICOM device C
print image to DICOM device D
Can choose both per key:

Store image on DICOM workstation A


Store image on DICOM workstation B

WORKSHEET FOR USER NETWORK PREFERENCES


superb and very powerful software - Free Activators ILLUSTRATION 2–5

2–11
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 amazing slow downer for mac free Direction 46–030402

intentionally blank

2–12
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

Sales/Service Preinstallation Checklist

Scheduled Arrival Date Salesperson

Customer FDO #

Equipment Room #

YES NO n/a Requirements Checklist


Electrical
To avoid circuit overload and possible loss of critical care equipment, no other
equipment can be on the same circuit. A dedicated single branch outlet of adequate
amperage that meets all local and national electrical codes MUST BE available within
the range of the machine’s power cord. That cord can be 3 or 4.5 m (10 or 15 feet)
long.
Line voltage is within 10% of rated value. No transients greater than 25% over nominal
office timeline 3.62 crack - Activators Patch peak voltage nor longer than 1 ms in duration occur.
At least one outlet on another branch is available for power tools, test equipment, or
modem. That outlet must be within 1 m (3.2 ft) of the unit.
Outlets are available for the desired number of external peripherals. Each outlet must
be within 2 m (6.5 ft) of the related peripheral.
If the site requires a leakage current checkout by a biomedical electronic technician,
arrange an appointment with those involved and if possible with local service also.
Leakage Current test equipment is available. The 120 Vac machine that has a 20 A
plug may require a test adapter; the probe tests may require another.
DraftSight 2021 Crack+ License Key Free Download 2021 Environmental/Facilities
Hardcopy of recommended layout and facilities is left with the customer.
No known sources of RFI/EMI or issues seen such as PC’s, alarm systems, medical
scanners, broadcast stations, broadcast vans in the area.
If sources of RFI/EMI are suspected, a site survey request has been made to the
Regional Ultrasound EMI Specialist.
If desired, a lockable storage cabinet for manuals/software has been ordered for the
site by the local service office. LG: 46–194427P299 SM: 46–194427P253
1) A Dial In Direct (DID) modular phone jack is within 1 m (3.2 ft) of the unit’s back
panel. Either an analog line without extensions or connections to a switchboard –or– 2)
a GE InSite Multiplexer will be installed.
The finished wall, floor (preferably not carpeted) and ceiling are installed. Door can be
locked. Room and corridors are dirt and dust free.
Room lighting is adequate. Both bright and dim lights are available.
The air conditioning is operating and stable. The machine alone requires 6500 BTU/hr.
photo mechanic student discount - Crack Key For U Two people add about another 600 BTU/hr. Room temperature stays between 18 and
26_C (65 and 78_F).
Источник: https://www.scribd.com/doc/52198392/ULTRASONIDO-G-E-LOGIQ-700
office timeline 3.62 crack  - Activators Patch

Related Videos

Software Cracking Tutorial Patch DLL Files Using NET Reflector and Reflexil 1 7

Office timeline 3.62 crack - Activators Patch -

 Oxy.cloud 

Office Timeline 6.02.03 Crack With License Key Free Download 2022

Office Timeline 6.02.03 Crack Free is a simple but powerful PowerPoint add-in that anyone can use to quickly create impressive graphs and graphic slides. Free yourself from the tedious work of creating visual projects that are difficult to handle. The Office Timeline allows you to draw graphs in PowerPoint almost instantly. Customize them in just a few clicks to create clear, elegant, high-level presentations that everyone will understand.

Office Timeline Crack with Product Key

Creating stunning graphics in PowerPoint is easy! Simply select the style or template of the timeline, enter or import the data of your project, and click “Create.” It is so simple!

Improve the communication of the project with the amazing Timeline PowerPoint slides that you can view, edit, and publish to anyone who has Microsoft Office. Integrating Office Timeline into PowerPoint makes it easy to present project plans or Gantt charts as they are easily understood by the audience.

Office Timeline Plus Crack is a simple but powerful PowerPoint add-in that anyone can use to quickly make impressive timelines and Gantt chart slides.

 Create Professional Looking Graphics Office Timeline 6.02.03 Crack

Office Timeline quickly creates professional-looking graphics and Gantt charts. Just load the add-in, and you’re all set to create your first chart. Ideal for teams and colleagues who need to instantly create project-level executive reviews that demonstrate their work.

Office Timeline is the only Gantt chart and timeline maker software built specifically to work in Microsoft PowerPoint. Working with Office Timeline to create professional Gantt charts and timelines is both quick and easy. The app has a simple and intuitive interface that is really easy to get to grips with. With the seamless integration into PowerPoint, the app has a powerful yet easy-to-use Timeline Wizard, which means you can start creating great-looking project visuals in seconds.

Office Timeline 3.62.11 Crack

Ideal for Teams & Colleagues

Office Timeline quickly creates professional-looking graphics and Gantt charts. Just load the add-in, and you’re all set to create your first chart. Ideal for teams and colleagues who need to instantly create project-level executive reviews that demonstrate their work.

Office Timeline is the only Gantt chart and timeline maker software built specifically to work in Microsoft PowerPoint. Working with Office Timeline to create professional Gantt charts and timelines is both quick and easy. The app has a simple and intuitive interface that is really easy to get to grips with. With the seamless integration into PowerPoint, the app has a powerful yet easy-to-use Timeline Wizard, which means you can start creating great-looking project visuals in seconds.

Features Key:

Beauty overcomes the complexity:

Compilation impr Powerful timelines of PowerPoint without the effort T and cost
Free yourself from the tedious work of manually creating visualization projects that are difficult to manage. Office Timeline helps you make timelines in PowerPoint almost instantly. Personalize them with just a few clicks to create clear and elegant high-level presentations that everyone will understand.

PowerPoint timelines are easy:

No complex steps. Zero learning curve. No problem!
Creating amazing timelines in PowerPoint is easy! Simply choose the style or template of the timeline you want, enter or import the data of your project, and click on Create. It’s that easy!

Easy-to-use PowerPoint timeline generator:

Create and present simple and familiar project plans
Improve project communication with awesome PowerPoint timeline slides that are They can see, edit, and Shared by anyone with Microsoft Office. The seamless integration of Office Timeline into PowerPoint makes it easy to present project plans or Gantt charts in a way that important audiences expect and understand easily.

Free supplement to the PowerPoint timeline: no registration required:

Anyone can make an impressive timeline in less than a minute
Office Timeline Free Edition quickly creates diagrams and lines of Professional-looking Gantt time. Simply download the add-on and you’ll be ready to create your first graphic. Perfect for teams and colleagues who need to instantly create executive-level project reviews that showcase their work.

Microsoft Office Timeline Plus free download

The Microsoft Office Timeline Crack Plus download works very well, but it depends on your PC., find out the requirements of the Office Timeline 2021 Plus system.

Office Timeline 3.62.11 Crack

What is New?

  • Rebuilt Project Import core (Project import no longer requires Microsoft Project to be installed)
  • Improved Project sync functionality
  • Improved Excel copy & paste functionality
  • It Improves Task Pane behavior
  • Improved task and milestone text box sizing behavior
  • Minor UI improvements
  • Fixed a number of bugs
  • Office Timeline 6.00.07 Crack

System Requirements:

  • Microsoft Windows Vista, Windows 7 (SP1), Windows 8, or Windows 10 (LTSB, CBB, and CB). Office Timeline does not run on Windows 10 S. The add-in is functional on Windows XP and Windows Server but unsupported.
  • 32-bit versions of Microsoft Office 2007 (SP3), 2010, 2013, or 2016. Although Office Timeline works with 64-bit versions of Office, we do not formally test or support it on 64-bit. The vast majority of the Office install base is the 32-bit version of Office. 32-bit is recommended by Microsoft unless you have very specific needs for 64-bit.
  • NET Framework 4.5.2 or greater.
  • Office Timeline installs the VSTO component if it’s not already installed on your computer. v10.0.60825 is recommended.
  • NET Programmability Support for PowerPoint enabled in Microsoft Office. .NET Programmability Support is typically enabled by default on Office installations
  • Starting with Office Timeline version 6.00.07, users do not need to have Microsoft Project installed in order to import Project data into the PowerPoint add-in.

Info About A Office Timeline 6.02.03 Crack :

  • Title: Office Timeline 2022
  • Filename: OfficeTimeline.exe
  • File size: 14.83MB (15,555,152 bytes)
  • Requirements: Windows (All Versions)
  • Languages: Multiple languages
  • License: Freeware

Office Timeline Registration Key

AKM8-MAS2-CH77-KHI9-ARRI
JML4-ANE7-A1L0-SAD9-JAM4

Office Timeline Pro Activation Code

RAN6-MIX4-GAND-SIFE-3G6T
KHTM-49KL-PUR3-JAV8-KIN0

Office Timeline License key

AW2A-X6WD-URHN-PX4J-QCRU
QWDZ-JVEU-AYE9-MNAD-7FOZ

Office Timeline Serial key

SSD6-XQ5G-GQT9-ZUNR-WAH9
C4TD-MAN6-XTSG-ID7J-QLET
XMEG-PROD7-LEVT-VPHS-02F6

How To Crack?

  •  Click on the Download button.
  •  Automatic software download.
  • Open the download file.
  • Click on Install.
  • Follow the instructions.
  • Thanks for downloading it.
  • Official web link Here
Источник: https://keygenwin.com/office-timeline/

4.62 software zmud


http://bytro.ru/46?keyword=462-software-zmud&charset=utf-8&source=telegraph

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

The Automapper module in zMUD has been rewritten from scratch to use an SQL database engine (using the MDAC database software that comes with Windows). This is the same mapping engine used in zMapper and zExplorer. zMUD map databases can be customized using the external zMapper program (available. Posted: Wed Mar 06, 2002 5:54 am zmud 4.62 variable. i still use 4.62 cause i learn with it, too lazy to mess with the new ones but have a little question about the variable #4 drink water, is you drink 5 times but what if you store the 4 in a var like count #var count 4 i know to get the 4 out, you need use @count then how do. Posted: Tue Oct 04, 2005 10:57 pm. Questions about zMUD 7.x. So I decided to try zMUD 7.x as people suggested me. I love the speed of it, compared to old 4.62, but because I used 4.62 for so long, I am used to those little details I just can't do without, and I just can't find a way to make it work in 7.x. Here are my issues: These are specially designed programs that optimize mudding by adding very helpful tools such as triggers, macros and paths.. Tharsis Zmud. A version of ZMud can be downloaded from this website which is preconfigured for connection to the mud. It is an older version of Zmud (4.62) but it is free to use - being from the. From Zugg Software: Play text-based MUD (Multi-User Dungeon) games using zMUD client. Includes extensive scripting language, regular expression triggers, aliases, keyboard macros, custom graphical buttons and gauges, automatic mapping module. Supports all MUD standards including ANSI, VT100,. I use zmud software to play mud games, but nvda can not get the correct lines that show on the screen. zmud version is 4.62. @jcsteh jcsteh added the p4 label on Apr 4. @jcsteh. Contributor. jcsteh commented on Apr 4. P4 because this affects relatively few users. Pull request welcome, though! @ehollig. Zmud是zuggsoft公司出品的MUD客户端程序,提供了许多有用的工具,.... 常用的Zmud版本有两个:Zmud 4.62和Zmud 7.21。7.21比4.62拥有更多的功能,如:数据库(DB),脚本支持(JS、VB),多行触发(Multi-state Triggers),设置分类(Nested Classes),更强大的地图. Zugg Software.2008-1-16[引用日期2014-10-13]. 词条标签. orgasm32.zip V1.1 10-Apr-97 (15k) Orgasmatron 32 - Shades Revisited: Just a bit of fun for Win95/NT users (MUD software with TAB as repeat key, programmable function keys and targetting) have a look and remember Viewdata! kwizzmud.zip Koppatops handy ZMUD settings file for anyone who is going to be running a. Question: Download zmud free 4.62 [full version] btdb.in :: 150 Mb. TOP seacrh Download free zmud 4.62

Office Timeline 3.62.11 Crack

Office Timeline Pro Crack + License Key Free Download

Office Timeline Pro 6.00.07 Crack is easy to put in and you can pick out from a couple of styles on your timeline. With this software program software, you can additionally upload Gantt tables with the aid of utilizing superior plans and get an extra expert look. You can also get to customize the fashion of the timeline. You can choose colorings for time durations and textual content, in addition to their font type and length.

Office Timeline Pro Crack and guide you step by step to create a timeline. Even higher, you may truly insert the information that you need to encompass the timeline even as showing the operation method and method. With only a few clicks and urgent the vital aspect, you may pick the color, input the beginning and supply an update, period percentage, identify, and pick out its shape.

Office Timeline Pro For Windows:

Office Timeline Pro You also can customize the style of the timeline extensively. You can choose the coloration for the period and textual content, further to its font kind and size. The elapsed time indicator and everyday marker may be positioned above or beneath the timeline, or completely hidden.Product Launch Plan with Swimlanes

Office Timeline is the simplest Gantt chart and timeline maker software program application constructed especially for artwork in Microsoft PowerPoint. Office Timeline Pro Apk to create expert Gantt charts and timelines are each quick and easy. The app has an easy and intuitive interface this is in truth smooth to get to grips with.

Main Features:

  • Copy & paste records right now from Excel
  • Show project development with % entire
  • 12 templates and chart styles
  • 15 milestone and task shapes
  • sixty-5 date formats
  • The potential to show duration in days, weeks, or months
  • Add more than 30 duties to a slide
  • Drag & drop to change the order of duties
  • Custom position the timeline at the slide
  • Position milestones vertically

Requirements Of Office Timeline Pro:

  • Supported Operating System: Windows XP/Vista/7/8/eight.1/10
  • Memory (RAM) required: 1 GB of RAM required.
  • Hard Disk Space required: one hundred MB of loose tough disk location required.
  • Processor: Intel Dual Core processor or later.
  • Administrator rights.

How To Install?

  • Download Office Timeline Crack from beneath.
  • Download Crack and Install It.
  • After installation Extract the documents in addition to Run them.
  • Click on the Crack then close it.
  • Copy the report from Crack Folder and Paste it into the installation folder.
  • Done. For more records visit this web web page.

Overview:

Office Timeline Crack Free is an easy however effective PowerPoint add-in that absolutely everyone can use to quickly create remarkable graphs and picture slides. Free yourself from the tedious work of creating visible tasks which may be difficult to deal with

License Key:

  • VDWFY-GZH2K-4M5N7-Q8R9T-BTCVE
  • ATCVD-WEXGZ-H2J4M-5N6Q8-R9SBU
  • Q8SAT-BUDWE-XFZH2-J3M5N-6P8R9

Related

Источник: https://findindir-crack.com/office-timeline-pro-crack/

Google Chrome

Web browser developed by Google

This article is about the web browser. For the operating system, see Chrome OS. For other uses, see Chrome (disambiguation).

Google Chrome for Android Icon 2016.svg
Google Chrome on Windows 10 screenshot.png

Google Chrome running on Windows 10

Developer(s)Google
Initial release
Windows XPbeta / September 2, 2008; 13 years ago (2008-09-02)
Windows XP1.0 / December 11, 2008; 12 years ago (2008-12-11)
macOS, Linuxpreview / June 4, 2009; 12 years ago (2009-06-04)
macOS, Linuxbeta / December 8, 2009; 11 years ago (2009-12-08)
Multi­platform5.0 / May 25, 2010; 11 years ago (2010-05-25)
Windows, macOS, Linux97.0.4692.20[5] Edit this on Wikidata / 18 November 2021; 1 day ago (18 November 2021)
Written inC, C++, Assembly, HTML, Java (Android app only), JavaScript, Python[6][7][8]
EnginesBlink (WebKit on iOS), V8 JavaScript engine
Operating system
PlatformIA-32, x86-64, ARMv7, ARMv8-A
Included with
Available in47 languages[11]
TypeWeb browser, mobile browser
LicenseProprietaryfreeware, based on open source components.[12][note 1]
Websitewww.google.com/chrome/

Google Chrome is a cross-platformweb browser developed by Google. It was first released in 2008 for Microsoft Windows, built with free software components from Apple WebKit and Mozilla Firefox.[13] It was later ported to Linux, macOS, iOS, and Android, where it is the default browser.[14] The browser is also the main component of Chrome OS, where it serves as the platform for web applications.

Most of Chrome's source code comes from Google's free and open-source software project Chromium, but Chrome is licensed as proprietary freeware.[12]WebKit was the original rendering engine, but Google eventually forked it to create the Blink engine;[15] all Chrome variants except iOS now use Blink.[16]

As of October 2021[update], StatCounter estimates that Chrome has a 68% worldwide browser market share (after peaking at 72.38% in November 2018) on personal computers (PC),[17] is most used on tablets (having surpassed Safari), and is also dominant on smartphones,[18][19] and at 65% across all platforms combined.[20] Because of this success, Google has expanded the "Chrome" brand name to other products: Chrome OS, Chromecast, Chromebook, Chromebit, Chromebox, and Chromebase.

History

See also: History of Google

Google CEO Eric Schmidt opposed the development of an independent web browser for six years. He stated that "at the time, Google was a small company", and he did not want to go through "bruising browser wars". After co-founders Sergey Brin and Larry Page hired several Mozilla Firefox developers and built a demonstration of Chrome, Schmidt said that "It was so good that it essentially forced me to change my mind."[21]

In September 2004, rumors of Google building a web browser first appeared. Online journals and U.S. newspapers stated at the time that Google was hiring former Microsoft web developers among others. It also came shortly after the release of Mozilla Firefox 1.0, which was surging in popularity and taking market share from Internet Explorer, which had noted security problems.[22]

Development of the browser began in 2006[23] spearheaded by Sundar Pichai.[24]

Announcement

The release announcement was originally scheduled for September 3, 2008, and a comic by Scott McCloud was to be sent to journalists and bloggers explaining the features within the new browser.[25] Copies intended for Europe were shipped early and German blogger Philipp Lenssen of Google Blogoscoped made a scanned copy of the 38-page comic available on his website after receiving it on September 1, 2008.[26][27] Google subsequently made the comic available on Google Books,[28] and mentioned it on their official blog along with an explanation for the early release.[29] The product was named "Chrome" as an initial development project code name, because it is associated with fast cars and speed. Google kept the development project name as the final release name, as a "cheeky" or ironic moniker, as one of the main aims was to minimize the user interface chrome.[30][31]

Public release

An early version of Chromium for Linux, explaining the difference between Chrome and Chromium

The browser was first publicly released, officially as a beta version,[32] on September 2, 2008 for Windows XP and newer, and with support for 43 languages, and later as a "stable" public release on December 11, 2008. On that same day, a CNET news item drew attention to a passage in the Terms of Service statement for the initial beta release, which seemed to grant to Google a license to all content transferred via the Chrome browser.[33] This passage was inherited from the general Google terms of service.[34] Google responded to this criticism immediately by stating that the language used was borrowed from other products, and removed this passage from the Terms of Service.[12]

Chrome quickly gained about 1% usage share.[29][35][36] After the initial surge, usage share dropped until it hit a low of 0.69% in October 2008. It then started rising again and by December 2008, Chrome again passed the 1% threshold.[37] In early January 2009, CNET reported that Google planned to release versions of Chrome for OS X and Linux in the first half of the year.[38] The first official Chrome OS X and Linux developer previews were announced on June 4, 2009,[39] with a blog post saying they were missing many features and were intended for early feedback rather than general use.[40] In December 2009, Google released beta versions of Chrome for OS X and Linux.[41][42] Google Chrome 5.0, announced on May 25, 2010, was the first stable release to support all three platforms.[43]

Chrome was one of the twelve browsers offered on BrowserChoice.eu to European Economic Area users of Microsoft Windows in 2010.[44]

Development

Chrome was assembled from 25 different code libraries from Google and third parties such as Mozilla's Netscape Portable Runtime, Network Security Services, NPAPI (dropped as of version 45),[45]Skia Graphics Engine, SQLite, and a number of other open-source projects.[46] The V8JavaScriptvirtual machine was considered a sufficiently important project to be split off (as was Adobe/Mozilla's Tamarin) and handled by a separate team in Denmark coordinated by Lars Bak in Aarhus. According to Google, existing implementations were designed "for small programs, where the performance and interactivity of the system weren't that important", but web applications such as Gmail "are using the web browser to the fullest when it comes to DOM manipulations and JavaScript", and therefore would significantly benefit from a JavaScript engine that could work faster.

Chrome initially used the WebKit rendering engine to display web pages. In 2013, they forked the WebCore component to create their own layout engine Blink. Based on WebKit, Blink only uses WebKit's "WebCore" components, while substituting other components, such as its own multi-process architecture, in place of WebKit's native implementation.[15] Chrome is internally tested with unit testing, automated testing of scripted user actions, fuzz testing, as well as WebKit's layout tests (99% of which Chrome is claimed to have passed), and against commonly accessed websites inside the Google index within 20–30 minutes.[28] Google created Gears for Chrome, which added features for web developers typically relating to the building of web applications, including offline support.[28] Google phased out Gears as the same functionality became available in the HTML5 standards.[47]

On January 11, 2011, the Chrome product manager, Mike Jazayeri, announced that Chrome would remove H.264 video codec support for its HTML5 player, citing the desire to bring Google Chrome more in line with the currently available open codecs available in the Chromium project, which Chrome is based on.[48] Despite this, on November 6, 2012, Google released a version of Chrome on Windows which added hardware-accelerated H.264 video decoding.[49] In October 2013, Cisco announced that it was open-sourcing its H.264 codecs and would cover all fees required.[50]

On February 7, 2012, Google launched Google Chrome Beta for Android 4.0 devices.[51] On many new devices with Android 4.1 and later preinstalled, Chrome is the default browser.[52] In May 2017, Google announced a version of Chrome for augmented reality and virtual reality devices.[53]

Version history

Main article: Google Chrome version history

Features

Google Chrome features a minimalistic user interface, with its user-interface principles later being implemented into other browsers. For example, the merging of the address bar and search bar into the omnibox or omnibar[54][55] Chrome also has a reputation for strong browser performance.[56][57]

Bookmarks and settings synchronization

Chrome allows users to synchronize their bookmarks, history, and settings across all devices with the browser installed by sending and receiving data through a chosen Google Account, which in turn updates all signed-in instances of Chrome. This can be authenticated either through Google credentials, or a sync passphrase.

Web standards support

The results of the Acid3test on Google Chrome 4.0

The first release of Google Chrome passed both the Acid1 and Acid2 tests. Beginning with version 4.0, Chrome has passed all aspects of the Acid3 test.[58]

As of May 2011[update], Chrome has very good support for JavaScript/ECMAScript according to Ecma International's ECMAScript standards conformance Test 262[59] (version ES5.1 May 18, 2012). This test reports as the final score the number of tests a browser failed; hence lower scores are better. In this test, Chrome version 37 scored 10 failed/11,578 passed. For comparison, Firefox 19 scored 193 failed/11,752 passed and Internet Explorer 9 has a score of 600+ failed, while Internet Explorer 10 has a score of 7 failed.

In 2011, on the official CSS 2.1 test suite by standardization organization W3C, WebKit, the Chrome rendering engine, passes 89.75% (89.38% out of 99.59% covered) CSS 2.1 tests.[60]

On the HTML5 web standards test, Chrome 41 scores 518 out of 555 points, placing it ahead of the five most popular desktop browsers.[61][62] Chrome 41 on Android scores 510 out of 555 points.[63][64][65] Chrome 44 scores 526, only 29 points less than the maximum score.[66]

Security

See also: Browser security

Chrome periodically retrieves updates of two blacklists (one for phishing and one for malware), and warns users when they attempt to visit a site flagged as potentially harmful. This service is also made available for use by others via a free public API called "Google Safe Browsing API".[28]

Chrome uses a process-allocation model to sandboxtabs.[67] Using the principle of least privilege, each tab process cannot interact with critical memory functions (e.g. OS memory, user files) or other tab processes – similar to Microsoft's "Protected Mode" used by Internet Explorer 9 or greater. The Sandbox Team is said to have "taken this existing process boundary and made it into a jail". This enforces a computer security model whereby there are two levels of multilevel security (user and sandbox) and the sandbox can only respond to communication requests initiated by the user.[68] On Linux sandboxing uses the seccomp mode.[69][70]

In January 2015, TorrentFreak reported that using Chrome when connected to the internet using a VPN can be a serious security issue due to the browser's support for WebRTC.[71]

On September 9, 2016, it was reported that starting with Chrome 56, users will be warned when they visit insecure HTTP websites to encourage more sites to make the transition to HTTPS.[72]

On December 4, 2018, Google announced its Chrome 71 release with new security features, including a built-in ad featuring system. In addition, Google also announced its plan to crack down on websites that make people involuntarily subscribe to mobile subscription plans.[73]

On September 2, 2020, with the release of Chrome 85, Google extended support for Secure DNS in Chrome for Android. DNS-over-HTTPS (DoH), was designed to improve safety and privacy while browsing the web. Under the update, Chrome automatically switches to DNS-over-HTTPS (DoH), if the current DNS provider supports the feature.[74]

Password management

Windows

Since 2008, Chrome has been faulted for not including a master password to prevent casual access to a user's passwords. Chrome developers have indicated that a master password does not provide real security against determined hackers and have refused to implement one. Bugs filed on this issue have been marked "WontFix".[75][76] As of February 2014[update], Google Chrome asks the user to enter the Windows account password before showing saved passwords.[77]

Linux

On Linux, Google Chrome/Chromium can store passwords in three ways:

Google Chrome/Chromium chooses which store to use automatically, based on the desktop environment in use.[78]

Passwords stored in GNOME Keyring or KWallet are encrypted on disk, and access to them is controlled by dedicated daemon software. Passwords stored in plain text are not encrypted. Because of this, when either GNOME Keyring or KWallet is in use, any unencrypted passwords that have been stored previously are automatically moved into the encrypted store.

Support for using GNOME Keyring and KWallet was added in version 6, but using these (when available) was not made the default mode until version 12.

Although Google Chrome/Chromium chooses which store to use automatically, the store to use can also be specified with a command-line argument:

  • --password-store=gnome (to use GNOME Keyring)
  • --password-store=kwallet (to use KWallet)
  • --password-store=basic (to use the plain text store)
macOS

As of version 45, the Google Chrome password manager is no longer integrated with Keychain, since the interoperability goal is no longer possible.[79]

Security vulnerabilities

No security vulnerabilities in Chrome were exploited in the three years of Pwn2Own from 2009 to 2011.[80]

At Pwn2Own 2012, Chrome was defeated by a French team who used zero day exploits in the version of Flash shipped with Chrome to take complete control of a fully patched 64-bit Windows 7 PC using a booby-trapped website that overcame Chrome's sandboxing.[81]

Chrome was compromised twice at the 2012 CanSecWest Pwnium.[81][82][83] Google's official response to the exploits was delivered by Jason Kersey, who congratulated the researchers, noting "We also believe that both submissions are works of art and deserve wider sharing and recognition."[84] Fixes for these vulnerabilities were deployed within 10 hours of the submission.[85][86]

A significant number of security vulnerabilities in Chrome occur in the Adobe Flash Player. For example, the 2016 Pwn2Own successful attack on Chrome relied on four security vulnerabilities. Two of the vulnerabilities were in Flash, one was in Chrome, and one was in the Windows kernel.[87] In 2016, Google announced that it was planning to phase out Flash Player in Chrome, starting in version 53. The first phase of the plan is to disable Flash for ads and "background analytics", with the ultimate goal of disabling it completely by the end of the year, except on specific sites that Google has deemed to be broken without it. Flash would then be re-enabled with the exclusion of ads and background analytics on a site-by-site basis.[88]

Leaked documents published by WikiLeaks, codenamed Vault 7 and dated from 2013 to 2016, detail the capabilities of the CIA, such as the ability to compromise web browsers (including Google Chrome).[89][90]

Malware blocking and ad blocking

Google introduced download scanning protection in Chrome 17.[91] In February 2018, Google introduced an ad blocking feature based on recommendations from the Interactive Advertising Bureau. Sites that employ invasive ads are given a 30-day warning, after which their ads will be blocked.[92]Consumer Reports recommended users install dedicated ad-blocking tools instead, which offer increased security against malware and tracking.[93]

Plugins

  • Chrome supported, up to version 45, plug-ins with the Netscape Plugin Application Programming Interface (NPAPI),[94] so that plug-ins (for example Adobe Flash Player) run as unrestricted separate processes outside the browser and cannot be sandboxed as tabs are. ActiveX is not supported.[94] Since 2010, Adobe Flash has been integral to Chrome and does not need be installed separately. Flash is kept up to date as part of Chrome's own updates.[95]Java applet support was available in Chrome with Java 6 update 12 and above.[96] Support for Java under OS X was provided by a Java Update released on May 18, 2010.[97]
  • On August 12, 2009, Google introduced a replacement for NPAPI that is more portable and more secure[98] called Pepper Plugin API (PPAPI).[99] The default bundled PPAPI Flash Player (or Pepper-based Flash Player) was available on Chrome OS first, then replaced the NPAPI Flash Player on Linux from Chrome version 20, on Windows from version 21 (which also reduced Flash crashes by 20%),[100] and eventually came to OS X at version 23.[101]
  • On September 23, 2013, Google announced that it would be deprecating and then removing NPAPI support. NPAPI support was removed from Linux in Chrome release 35.[102] NPAPI plugins like Java can no longer work in Chrome (but there are workarounds for Flash by using PPAPI Flash Player on Linux including for Chromium).[103]
  • On April 14, 2015, Google released Chrome v42, disabling the NPAPI by default. This makes plugins that do not have a PPAPI plugin counterpart incompatible with Chrome, such as Java, Silverlight and Unity. However, NPAPI support could be enabled through the chrome://flags[permanent dead link] menu, until the release of version 45 on September 1, 2015, that removed NPAPI support entirely.[104]

Privacy

Incognito mode

"Incognito mode" redirects here. For other uses, see Incognito.

Google Chrome Incognito mode message

The private browsing feature called Incognito mode prevents the browser from locally storing any history information, cookies, site data, or form inputs.[105] Downloaded files and bookmarks will be stored. In addition, user activity is not hidden from visited websites or the Internet service provider. It may be used in web development to preview pages as they appear to first-time visitors.

Incognito mode is similar to the private browsing feature in other web browsers. It does not prevent saving in all windows: "You can switch between an incognito window and any regular windows you have open. You'll only be in incognito mode when you're using the incognito window".[106]

The iOS version of Chrome also supports the optional ability to lock incognito tabs with Face ID, Touch ID or the device's passcode.[107]

Listening capabilities

In June 2015, the Debian developer community discovered that Chromium 43 and Chrome 43 were programmed to download the Hotword Shared Module, which could enable the OK Google voice recognition extension, although by default it was "off". This raised privacy concerns in the media.[108][109] The module was removed in Chrome 45, which was released on September 1, 2015, and was only present in Chrome 43 and 44.[110][111]

User tracking concerns

Chrome sends details about its users and their activities to Google through both optional and non-optional user tracking mechanisms.[112][113]

Some of the tracking mechanisms can be optionally enabled and disabled through the installation interface[114] and through the browser's options dialog.[115] Unofficial builds, such as SRWare Iron, seek to remove these features from the browser altogether.[116] The RLZ feature is not included in the Chromium browser either.[117]

In March 2010, Google devised a new method to collect installation statistics: the unique ID token included with Chrome is now used for only the first connection that Google Update makes to its server.[118]

The optional suggestion service included in Google Chrome has been criticized because it provides the information typed into the Omnibox to the search provider before the user even hits return. This allows the search engine to provide URL suggestions, but also provides them with web use information tied to an IP address.[119]

The optional feature to use a web service to help resolve spelling errors has privacy implications.[120]

A 2019 review by Washington Post technology columnist Geoffrey A. Fowler found that in a typical week of browsing, Chrome allowed thousands of more cookies to be stored than Mozilla Firefox. Fowler pointed out that because of its advertising businesses, despite the privacy controls it offers users, Google is a major producer of third-party cookies and has a financial interest in collecting user data; he recommended switching to Firefox, Apple Safari, or Chromium-based Brave.[121]

In January 2021, Alphabet stated it was making progress on developing privacy-friendly alternatives which would replace third-party cookies currently being used by advertisers and companies to track browsing habits. Google has promised to phase out the use of cookies in their web-browser in 2022, implementing their FLoC technology instead. The announcement came after scrutiny from both the United States and the United Kingdom: the U.K.'s Competition and Markets Authority opened a formal probe into Google's claim to end cookie support in January of the same year and the antitrust lawsuit against the company in December 2020 by ten U.S. states.[122][123][124][125]

Chrome's future switch to FLoC has drawn criticism from DuckDuckGo, Brave and the Electronic Frontier Foundation.[126][127][128]

Method[116]Information sent When Optional? Opt-in?
InstallationRandomly generated token included in an installer; used to measure the success rate of Google Chrome once at installation[129]

On installation

No N/A
RLZ identifier[130]Encoded string, according to Google, contains non-identifying information on where Chrome was downloaded from and its installation week; it is used to measure promotional campaigns;[129] Google provides source code to decode this string[117]

Can be disabled in Chrome OS.[129] For Chrome browsers running in all other operating systems:[129]

  • Desktop versions of Chrome can avoid it by downloading the browser directly from Google.
  • Mobile versions of Chrome always send the RLZ identifier on first launch.
  • On Google search query
  • On first launch and first use of address bar[129]
Partial
[note 2][129]
No
clientID[115]Unique identifier along with user preferences, logs of use metrics and crashes Un­known Yes[131]Yes
Omnibox predictions[115]Text typed into the address bar is sent to the user's search engine when not in incognito mode. When in incognito mode, the suggestions are created on-device instead.[129]While typing Yes No
Google UpdateInformation about how often Chrome is used, details about the OS and Chrome version Periodically Partial
[note 3][132]
No

No longer in this table: Chrome previously was able to suggest similar pages when a page couldn't be found. For this, in some cases Google servers were contacted.[133] The feature has been removed.

Do Not Track

In February 2012, Google announced that Chrome would implement the Do Not Track (DNT) standard to inform websites the user's desire not to be tracked. The protocol was implemented in version 23. In line with the W3's draft standard for DNT,[134] it is turned off by default in Chrome.[135]

Speed

The JavaScriptvirtual machine used by Chrome, the V8 JavaScript engine, has features such as dynamic code generation, hidden class transitions, and precise garbage collection.[28]

In 2008, several websites performed benchmark tests using the SunSpider JavaScript Benchmark tool as well as Google's own set of computationally intense benchmarks, which include ray tracing and constraint solving.[136] They unanimously reported that Chrome performed much faster than all competitors against which it had been tested, including Safari (for Windows), Firefox 3.0, Internet Explorer 7, Opera, and Internet Explorer 8.[137][138][139][56][140][141] However, on October 11, 2010, independent tests of JavaScript performance, Chrome has been scoring just behind Opera'sPresto engine since it was updated in version 10.5.[142]

On September 3, 2008, Mozilla responded by stating that their own TraceMonkey JavaScript engine (then in beta), was faster than Chrome's V8 engine in some tests.[143][144][145]John Resig, Mozilla's JavaScript evangelist, further commented on the performance of different browsers on Google's own suite, commenting on Chrome's "decimating" of the other browsers, but he questioned whether Google's suite was representative of real programs. He stated that Firefox 3.0 performed poorly on recursion-intensive benchmarks, such as those of Google, because the Mozilla team had not implemented recursion-tracing yet.[146]

Two weeks after Chrome's launch in 2008, the WebKit team announced a new JavaScript engine, SquirrelFish Extreme,[147] citing a 36% speed improvement over Chrome's V8 engine.[148][149][150]

Like most major web browsers, Chrome uses DNS prefetching to speed up website lookups,[151] as do other browsers like Firefox,[152] Safari,[153] Internet Explorer (called DNS Pre-resolution),[154] and in Opera as a UserScript (not built-in).[155]

Chrome formerly used their now-deprecated SPDY protocol instead of only HTTP[156][157] when communicating with servers that support it, such as Google services, Facebook, Twitter. SPDY support was removed in Chrome version 51. This was due to SPDY being replaced by HTTP/2, a standard that was based upon it.

In November 2019, Google said it was working on several "speed badging" systems that let visitors know why a page is taking time to show up. The variations include simple text warnings and more subtle signs that indicate a site is slow. No date has been given for when the badging system will be included with the Chrome browser.[158]

Stability

Screenshot of a Chrome browser crash

A multi-process architecture is implemented in Chrome where, by default, a separate process is allocated to each site instance and plugin.[159] This procedure is termed process isolation,[160] and raises security and stability by preventing tasks from interfering with each other. An attacker successfully gaining access to one application gains access to no others,[161] and failure in one instance results in a Sad Tabscreen of death, similar to the well-known Sad Mac, but only one tab crashes instead of the whole application. This strategy exacts a fixed per-process cost up front, but results in less memory bloat over time as fragmentation is confined to each instance and no longer needs further memory allocations.[28] This architecture was later adopted in Safari[162] and Firefox.[163]

Chrome includes a process management utility called Task Manager which lets users see what sites and plugins are using the most memory, downloading the most bytes and overusing the CPU and provides the ability to terminate them.[28] Chrome Version 23 ensures its users an improved battery life for the systems supporting Chrome's GPU accelerated video decoding.[164][49]

Saving pages

Further information: MHTML § Google Chrome

The desktop edition of Chrome is able to save pages as HTML with assets in a "_files" subfolder, or as unprocessed HTML-only document. It also offers an option to save in the MHTML format.[165]

User interface

2D motif from March 2011 until October 2015

Material Design motif used from September 2014 onward for mobile versions and October 2015 onward for desktop versions

By default, the main user interface includes back, forward, refresh/cancel and menu buttons. A home button is not shown by default, but can be added through the Settings page to take the user to the new tab page or a custom home page.[166]

Tabs are the main component of Chrome's user interface and have been moved to the top of the window rather than below the controls. This subtle change contrasts with many existing tabbed browsers which are based on windows and contain tabs. Tabs, with their state, can be transferred seamlessly between window containers by dragging. Each tab has its own set of controls, including the Omnibox.[28]

The Omnibox is a URL box that combines the functions of both the address bar and search box. If a user enters the URL of a site previously searched from, Chrome allows pressing Tab to search the site again directly from the Omnibox. When a user starts typing in the Omnibox, Chrome provides suggestions for previously visited sites (based on the URL or in-page text), popular websites (not necessarily visited before – powered by Google Instant), and popular searches. Although Instant can be turned off, suggestions based on previously visited sites cannot be turned off. Chrome will also autocomplete the URLs of sites visited often.[28] If a user types keywords into the Omnibox that don't match any previously visited websites and presses enter, Chrome will conduct the search using the default search engine.

One of Chrome's differentiating features is the New Tab Page, which can replace the browser home page and is displayed when a new tab is created. Originally, this showed thumbnails of the nine most visited websites, along with frequent searches, recent bookmarks, and recently closed tabs; similar to Internet Explorer and Firefox with Google Toolbar, or Opera'sSpeed Dial.[28] In Google Chrome 2.0, the New Tab Page was updated to allow users to hide thumbnails they did not want to appear.[167]

Starting in version 3.0, the New Tab Page was revamped to display thumbnails of the eight most visited websites. The thumbnails could be rearranged, pinned, and removed. Alternatively, a list of text links could be displayed instead of thumbnails. It also features a "Recently closed" bar that shows recently closed tabs and a "tips" section that displays hints and tricks for using the browser.[168]

Chrome includes a bookmarks submenu that lists the user's bookmarks, provides easy access to Chrome's Bookmark Manager, and allows the user to toggle a bookmarks bar on or off.

For web developers, Chrome features an element inspector (Inspect Element), similar to the Firebug browser extension, which allows users to look into the DOM and see what makes up the webpage.[151]

Chrome has special URLs that load application-specific pages instead of websites or files on disk. Chrome also has a built-in ability to enable experimental features. Originally called , the address was changed to to make it less obvious to casual users.[169][170]

In March 2011, Google introduced a new simplified logo to replace the previous 3D logo that had been used since the project's inception. Google designer Steve Rura explained the company reasoning for the change: "Since Chrome is all about making your web experience as easy and clutter-free as possible, we refreshed the Chrome icon to better represent these sentiments. A simpler icon embodies the Chrome spirit – to make the web quicker, lighter, and easier for all."[171]

In September 2013, Google started making Chrome apps "For your desktop". This meant offline access, desktop shortcuts, and less dependence on Chrome—apps launch in a window separate from Chrome, and look more like native applications.[172]

On January 2, 2019, Google introduced Native Dark Theme for Chrome on Windows 10.[173]

Desktop shortcuts and apps

Chrome allows users to make local desktop shortcuts that open web applications in the browser. The browser, when opened in this way, contains none of the regular interface except for the title bar, so as not to "interrupt anything the user is trying to do". This allows web applications to run alongside local software (similar to Mozilla Prism and Fluid).[28]

This feature, according to Google, would be enhanced with the Chrome Web Store, a one-stop web-based web applications directory which opened in December 2010.[174][175]

Chrome Web Store

Main article: Chrome Web Store

Announced on December 7, 2010, the Chrome Web Store allows users to install web applications as extensions to the browser, although most of these extensions function simply as links to popular web pages and/or games, some of the apps like Springpad do provide extra features like offline access. The themes and extensions have also been tightly integrated into the new store, allowing users to search the entire catalog of Chrome extras.[176]

The Chrome Web Store was opened on February 11, 2011, with the release of Google Chrome 9.0.[177]

Extensions

Browser extensions are able to modify Google Chrome. They are supported by the browser's desktop edition.[178] These extensions are written using web technologies like HTML, JavaScript, and CSS.[179] They are distributed through Chrome Web Store,[180] initially known as the Google Chrome Extensions Gallery.[178] All users with a Google Account are able to add extensions after developing them.[181] Many Chrome extensions, once installed, have access to the user's data. There are three levels of permissions that an app or extension may request.[182] All extensions must have a clear and singular purpose.[183]

On September 9, 2009, Google enabled extensions by default on Chrome's developer channel, and provided several sample extensions for testing.[184] In December, the Google Chrome Extensions Gallery beta began with approximately 300 extensions.[42][185] It was launched on January 25, 2010, along with Google Chrome 4.0, containing approximately 1500 extensions.[186]

In 2014, Google started preventing some Windows users from installing extensions not hosted on the Chrome Web Store.[187][188] The following year Google reported a "75% drop in customer support help requests for uninstalling unwanted extensions" which led them to expand this restriction to all Windows and Mac users.[189] Under the terms of the EULA, Google can remove or disable any extensions from a user's installation of Chrome.[12]

Notable examples

See also: Category:Google Chrome extensions

Themes

Starting with Google Chrome 3.0, users can install themes to alter the appearance of the browser.[193] Many free third-party themes are provided in an online gallery,[194] accessible through a "Get themes" button in Chrome's options.[195]

Automatic web page translation

Starting with Google Chrome 4.1 the application added a built-in translation bar using Google Translate. Language translation is currently available for 52 languages.[196] When Chrome detects a foreign language other than the user's preferred language set during the installation time, it asks the user whether or not to translate.

Release channels, cycles and updates

The first production release on December 11, 2008, marked the end of the initial Beta test period and the beginning of production. Shortly thereafter, on January 8, 2009, Google announced an updated release system with three channels: Stable (corresponding to the traditional production), Beta, and Developer preview (also called the "Dev" channel). Where there were before only two channels: Beta and Developer, now there were three. Concurrently, all Developer channel users were moved to the Beta channel along with the promoted Developer release. Google explained that now the Developer channel builds would be less stable and polished than those from the initial Google Chrome's Beta period. Beta users could opt back to the Developer channel as desired.

Each channel has its own release cycle and stability level. The Stable channel updated roughly quarterly, with features and fixes that passed "thorough" testing in the Beta channel. Beta updated roughly monthly, with "stable and complete" features migrated from the Developer channel. The Developer channel updated once or twice per week and was where ideas and features were first publicly exposed "(and sometimes fail) and can be very unstable at times". [Quoted remarks from Google's policy announcements.][197][198][199]

Google Chrome Canary application icon

On July 22, 2010, Google announced it would ramp up the speed at which it releases new stable versions; the release cycles were shortened from quarterly to six weeks for major Stable updates.[200] Beta channel releases now come roughly at the same rate as Stable releases, though approximately one month in advance, while Dev channel releases appear roughly once or twice weekly, allowing time for basic release-critical testing.[201] This faster release cycle also brought a fourth channel: the "Canary" channel, updated daily from a build produced at 09:00 UTC from the most stable of the last 40 revisions.[202] The name refers to the practice of using canaries in coal mines, so if a change "kills" Chrome Canary, it will be blocked from migrating down to the Developer channel, at least until fixed in a subsequent Canary build.[203] Canary is "the most bleeding-edge official version of Chrome and somewhat of a mix between Chrome dev and the Chromium snapshot builds". Canary releases run side by side with any other channel; it is not linked to the other Google Chrome installation and can therefore run different synchronization profiles, themes, and browser preferences. This ensures that fallback functionality remains even when some Canary updates may contain release-breaking bugs.[204] It does not natively include the option to be the default browser, although on Windows and OS X it can be set through System Preferences. Canary was Windows-only at first; an OS X version was released on May 3, 2011.[205]

The Chrome beta channel for Android was launched on January 10, 2013; like Canary, it runs side by side with the stable channel for Android.[206][207] Chrome Dev for Android was launched on April 29, 2015.[208]

All Chrome channels are automatically distributed according to their respective release cycles. The mechanism differs by platform. On Windows, it uses Google Update, and auto-update can be controlled via Group Policy.[209] Alternatively, users may download a standalone installer of a version of Chrome that does not auto-update.[210][211] On OS X, it uses Google Update Service, and auto-update can be controlled via the OS X "defaults" system.[212] On Linux, it lets the system's normal package management system supply the updates. This auto-updating behavior is a key difference from Chromium, the non-branded open-source browser which forms the core of Google Chrome. Because Chromium also serves as the pre-releasedevelopment trunk for Chrome, its revisions are provided as source code and buildable snapshots are produced continuously with each new commit, requiring users to manage their own browser updates.[213]

In March 2021, Google announced that starting with Chrome 94 in the third quarter of 2021, Google Chrome Stable releases will be made every four weeks, instead of six weeks as they have been since 2010. Also, Google announced a new release channel for system administrators and browser embedders with releases every eight weeks.[214]

Release version numbers

Releases are identified by a four-part version number, e.g. 42.0.2311.90 (Windows Stable release April 14, 2015[215]). The components are major.minor.build.patch.[216][217]

Major.minor reflects scheduling policy
Build.patch identifies content progression
  • Major represents a product release. These are scheduled 7–8 per year, unlike other software systems where the major version number updates only with substantial new content.
  • Minor is usually 0. References to version 'x' or 'x.0', e.g. 42.0, refer to this major.minor designation.
  • Build is ever increasing. For a release cycle, e.g. 42.0, there are several builds in the Canary and Developer period. The last build number from Developer is kept throughout Beta and Stable and is locked with the major.minor for that release.
  • Patch resets with each build, incrementing with each patch. The first patch is 0, but usually the first publicly released patch is somewhat higher. In Beta and Stable, only patch increments.

Chromium and Chrome release schedules are linked through Chromium (Major) version Branch Point dates, published annually.[216] The Branch Points precede the final Chrome Developer build (initial) release by 4 days (nearly always) and the Chrome Stable initial release by roughly 53 days.[218]

Example: The version 42 Branch Point was February 20, 2015.[216] Developer builds stopped advancing at build 2311 with release 42.0.2311.4 on February 24,[219] 4 days later. The first Stable release, 42.0.2311.90, was April 14, 2015,[215] 53 days after the Branch Point.

Color management

Main article: Color management

Chrome supports color management by using the system-provided ICC v2 and v4 support on macOS, and from version 22 supports ICC v2 profiles by default on other platforms.[220]

T-Rex

Main article: Dinosaur game

In Chrome, when not connected to the Internet and an error message displaying "No internet" is shown, on the top, an "8-bit" Tyrannosaurus rex is shown, but when pressing the space bar on a keyboard, mouse-clicking on it or tapping it on touch devices, the T-Rex instantly jumps once and dashes across a cactus-ridden desert, revealing it to be an Easter egg in the form of a platform game.[221][222][223][224] The game itself is an infinite runner, and there is no time limit in the game as it progresses faster and periodically tints to a black background. A school Chromebook administrator can disable the game.[225]

Platforms

The current version of Chrome runs on:

As of April 2016[update], stable 32-bit and 64-bit builds are available for Windows, with only 64-bit stable builds available for Linux and macOS.[227][228][229] 64-bit Windows builds became available in the developer channel and as canary builds on June 3, 2014,[230] in the beta channel on July 30, 2014,[231] and in the stable channel on August 26, 2014.[232] 64-bit OS X builds became available as canary builds on November 7, 2013,[233][234] in the beta channel on October 9, 2014,[235] and in the stable channel on November 18, 2014.[227]

Starting with the release of version 89, Chrome will only be supported on Intel/Intel x86 and AMD processors with the SSE3 instruction set.[236][237][238]

Android

A beta version for Android 4.0 devices was launched on February 7, 2012, available for a limited number of countries from Google Play.[243][244]

Notable features: synchronization with desktop Chrome to provide the same bookmarks and view the same browser tabs,[245] page pre-rendering,[246] hardware acceleration.[247]

Many of the latest HTML5 features: almost all of the Web Platform's features: GPU-accelerated canvas, including CSS 3D Transforms, CSS animations, SVG, WebSocket (including binary messages), Dedicated Workers; it has overflow scroll support, strong HTML5 video support, and new capabilities such as IndexedDB, WebWorkers, Application Cache and the File APIs, date- and time-pickers, parts of the Media Capture API.[246][248] Also supports mobile oriented features such as Device Orientation and Geolocation.[248]

Mobile customizations: swipe gesture tab switching,[245] link preview allows zooming in on (multiple) links to ensure the desired one is clicked,[245] font size boosting to ensure readability regardless of the zoom level.[248]

Features missing in the mobile version include sandboxed tabs,[246][249] Safe Browsing,[246] apps or extensions,[247] Adobe Flash (now and in the future),[247]Native Client,[247] and the ability to export user data such a list of their opened tabs or their browsing history into portable local files.[250]

Development changes: remote debugging,[246][251] part of the browser layer has been implemented in Java, communicating with the rest of the Chromium and WebKit code through Java Native Bindings.[248] The code of Chrome for Android is a fork of the Chromium project. It is a priority to upstream most new and modified code to Chromium and WebKit to resolve the fork.[248]

The April 17, 2012 update included availability in 31 additional languages and in all countries where Google Play is available. A desktop version of a website can also be requested as opposed to a mobile version. In addition, Android users can now add bookmarks to their Android home screens if they choose and decide which apps should handle links opened in Chrome.[252]

On June 27, 2012, Google Chrome for Android exited beta and became stable.[253][254]

Chrome 18.0.1026311, released on September 26, 2012, was the first version of Chrome for Android to support mobile devices based on Intel x86.[255]

Starting from version 25, the Chrome version for Android is aligned with the desktop version, and usually new stable releases are available at the same time between the Android and the desktop version. Google released a separate Chrome for Android beta channel on January 10, 2013, with version 25.[206] As of 2013[update] a separate beta version of Chrome is available in the Google Play Store – it can run side by side with the stable release.[256]

Chrome OS

Main article: Chrome OS

Google Chrome is the basis of Google's Chrome OS operating system that ships on specific hardware from Google's manufacturing partners.[257] The user interface has a minimalist design resembling the Google Chrome browser. Chrome OS is aimed at users who spend most of their computer time on the Web; the only applications on the devices are a browser incorporating a media player and a file manager.[258][259][260][261][262]

Google announced Chrome OS on July 7, 2009.[263]

iOS

Chrome is available on Apple's mobile iOS operating system as Google Chrome for iOS. Released in the Apple App Store on June 26, 2012, it supports the iPad, iPhone, and iPod touch, and the current version requires that the device has iOS 12.0 or greater installed.[264] In accordance with Apple's requirements for browsers released through their App Store, this version of Chrome uses the iOS WebKit – which is Apple's own mobile rendering engine and components, developed for their Safari browser – therefore it is restricted from using Google's own V8 JavaScript engine.[265][266] Chrome is the default web browser for the iOSGmail application.

In a review by Chitika, Chrome was noted as having 1.5% of the iOS web browser market as of July 18, 2012[update].[267] In October 2013, Chrome had 3% of the iOS browser market.[268]

Linux

On Linux distributions, support for 32-bit Intel processors ended in March 2016 although Chromium is still supported.[269] As of Chrome version 26, Linux installations of the browser may be updated only on systems that support GCC v4.6 and GTK v2.24 or later. Thus deprecated systems include (for example) Debian 6's 2.20, and RHEL 6's 2.18.[270]

Windows

Support for Google Chrome on Windows XP and Windows Vista ended in April 2016.[271] The last release of Google Chrome that can be run on Windows XP and Windows Vista was version 49.0.2623.112,[272] released on April 7, 2016,[273] then re-released on April 11, 2016.[274]

Support for Google Chrome on Windows 7 was supposed to end upon the announcement on July 15, 2021[275], and suddenly moved to January 15, 2022, however due to the ongoing COVID-19 pandemic and enterprises are taking more time to migrate to Windows 10 or 11, the end of support date was pushed at least on January 15, 2023, receiving critical security and stability updates of the Chrome browser.[276]

"Windows 8 mode" was introduced in 2012 and has since been discontinued. It was provided to the developer channel, which enabled Windows 8 and Windows 8.1 users to run Chrome with a full-screen, tablet-optimized interface, with access to snapping, sharing, and search functionalities.[277] In October 2013, Windows 8 mode on the developer channel changed to use a desktop environment mimicking the interface of Chrome OS with a dedicated windowing system and taskbar for web apps.[278] This was removed on version 49 and users that have upgraded to Windows 10 will lose this feature.[279]

macOS

Google dropped support for Mac OS X 10.5 with the release of Chrome 22.[280] Support for 32-bit versions of Chrome ended in November 2014 with the release of Chrome 39.[281][282][227] Support for Mac OS X 10.6, 10.7, and 10.8 ended in April 2016 with the release of Chrome 50. Support for OS X 10.9 ended in April 2018 with the release of Chrome 66.[citation needed]

Reception

Ambox current red.svg

This section needs to be updated. Please help update this article to reflect recent events or newly available information.(June 2019)

Google Chrome was met with acclaim upon release. In 2008, Matthew Moore of The Daily Telegraph summarized the verdict of early reviewers: "Google Chrome is attractive, fast and has some impressive new features..."[283]

Initially, Microsoft reportedly played down the threat from Chrome and predicted that most people would embrace Internet Explorer 8. Opera Software said that "Chrome will strengthen the Web as the biggest application platform in the world".[284] But by February 25, 2010, BusinessWeek had reported that "For the first time in years, energy and resources are being poured into browsers, the ubiquitous programs for accessing content on the Web. Credit for this trend – a boon to consumers – goes to two parties. The first is Google, whose big plans for the Chrome browser have shaken Microsoft out of its competitive torpor and forced the software giant to pay fresh attention to its own browser, Internet Explorer. Microsoft all but ceased efforts to enhance IE after it triumphed in the last browser war, sending Netscape to its doom. Now it's back in gear."[285] Mozilla said that Chrome's introduction into the web browser market comes as "no real surprise", that "Chrome is not aimed at competing with Firefox", and furthermore that it would not affect Google's revenue relationship with Mozilla.[286][287]

Chrome's design bridges the gap between desktop and so-called "cloud computing." At the touch of a button, Chrome lets you make a desktop, Start menu, or QuickLaunch shortcut to any Web page or Web application, blurring the line between what's online and what's inside your PC. For example, I created a desktop shortcut for Google Maps. When you create a shortcut for a Web application, Chrome strips away all of the toolbars and tabs from the window, leaving you with something that feels much more like a desktop application than like a Web application or page.

— PC World[288]

With its dominance in the web browser market, Google has been accused of using Chrome and Blink development to push new web standards that are proposed in-house by Google and subsequently implemented by its services first and foremost. These have led to performance disadvantages and compatibility issues with competing browsers, and in some cases, developers intentionally refusing to test their websites on any other browser than Chrome.[289] Tom Warren of The Verge went as far as comparing Chrome to Internet Explorer 6, the default browser of Windows XP that was often targeted by competitors due to its similar ubiquity in the early 2000s.[290]

In 2019, Google similarly faced criticism over planned changes to its extensions API for Chrome (dubbed "Manifest V3"), which would inhibit the effectiveness of certain forms of ad blocking software by preventing the use of the WebRequest API to block and modify network connections. Google intends extensions to transition to another API known as DeclarativeWebRequest, which allows the extension to set up pre-configured rules that are processed by the browser itself rather than through the extension. However, concerns over how well the API would perform, in combination with concerns over a cap on the number of entries that may be blacklisted, led to criticism that these changes were designed to inhibit ad blocking (citing Google's vested interest in the online advertising industry). Google cited performance issues associated with WebRequest, as it requires all network traffic to go through the extension before the page is loaded, as well as its use in malicious extensions, as justification for these changes. In June 2019, it announced that it would increase the aforementioned cap from 30,000 to 150,000 entries to help quell concerns.[291][292][293]

Usage

Market share

Further information: Usage share of web browsers and Browser wars

Chrome overtook Firefox in November 2011, in worldwide usage. As of March 2021[update], according to StatCounter, Google Chrome had 67% worldwide desktop usage share, making it the most widely used web browser.[296]

Along with Safari and Mozilla Firefox, Chrome receives a weekend "bump", which boosts its market share by as much as three percentage points on weekends, at the expense of Internet Explorer.[297]

It was reported by StatCounter, a web analytics company, that for the single day of Sunday, March 18, 2012, Chrome was the most used web browser in the world for the first time. Chrome secured 32.7% of the global web browsing on that day, while Internet Explorer followed closely behind with 32.5%.[298]

From May 14–21, 2012, Google Chrome was for the first time responsible for more Internet traffic than Microsoft's Internet Explorer, which long had held its spot as the most used web browser in the world.[299] According to StatCounter, 31.88% of web traffic was generated by Chrome for a sustained period of one week and 31.47% by Internet Explorer. Though Chrome had topped Internet Explorer for a single day's usage in the past, this was the first time it had led for one full week.[300]

At the 2012 Google I/O developers' conference, Google claimed that there were 310 million active users of Chrome, almost double the number in 2011, which was stated as 160 million active users.[301]

In June 2013, according to StatCounter, Chrome overtook Internet Explorer for the first time in the US.[302]

In August 2013, Chrome was used by 43% of internet users worldwide. This study was done by Statista, which also noted that in North America, 36% of people use Chrome, the lowest in the world.[303]

As of May 2020[update], Chrome is the most used browser in every country.[305]

Enterprise deployment

In December 2010, Google announced that to make it easier for businesses to use Chrome they would provide an official Chrome MSI package. For business use it is helpful to have full-fledged MSI packages that can be customized via transform files (.mst) – but the MSI provided with Chrome is only a very limited MSI wrapper fitted around the normal installer, and many businesses find that this arrangement does not meet their needs.[306] The normal downloaded Chrome installer puts the browser in the user's local app data directory and provides invisible background updates, but the MSI package will allow installation at the system level, providing system administrators control over the update process[307] – it was formerly possible only when Chrome was installed using Google Pack. Google also created group policy objects to fine-tune the behavior of Chrome in the business environment, for example by setting automatic updates intervals, disabling auto-updates, and configuring a home page.[308] Until version 24 the software is known not to be ready for enterprise deployments with roaming profiles or Terminal Server/Citrix environments.[309]

In 2010, Google first started supporting Chrome in enterprise environments by providing an MSI wrapper around the Chrome installer. Google starting providing group policy objects, with more added each release,[310] and today there are more than 500 policies available to control Chrome's behavior in enterprise environments.[311] In 2016, Google launched Chrome Browser Enterprise Support, a paid service enabling IT admins access to Google experts to support their browser deployment.[312] In 2019, Google launched Chrome Browser Cloud Management, a dashboard that gives business IT managers the ability to control content accessibility, app usage and browser extensions installed on its deployed computers.[313]

Chromium

Main article: Chromium (web browser)

In September 2008, Google released a large portion of Chrome's source code as an open-source project called Chromium. This move enabled third-party developers to study the underlying source code and to help port the browser to the macOS and Linux operating systems. The Google-authored portion of Chromium is released under the permissive BSD license.[314] Other portions of the source code are subject to a variety of open-source licenses.[315] Chromium is similar to Chrome, but lacks built-in automatic updates and a built-in Flash player, as well as Google branding and has a blue-colored logo instead of the multicolored Google logo.[316][317] Chromium does not implement user RLZ tracking.[117][112][318] Initially, the Google Chrome PDF viewer, PDFium, was excluded from Chromium, but was later made open-source in May 2014.[319][320] PDFium can be used to fill PDF forms.[321]

Developing for Chrome

It is possible to develop applications, extensions, and themes for Chrome. They are zipped in a .crx file and contain a manifest file that specifies basic information (such as version, name, description, privileges, etc.), and other files for the user interface (icons, popups, etc.). Google has an official developer's guide.[322] Chrome has its own web store where users and developers can upload and download these applications and extensions.[323]

Impersonation by malware

As with Microsoft Internet Explorer, the popularity of Google Chrome has led to the appearance of malware abusing its name. In late 2015, an adware replica of Chrome named "eFast" appeared, which would usurp the Google Chrome installation and hijack file type associations to make shortcuts for common file types and communication protocols link to itself, and inject advertisements into web pages. Its similar-looking icon was intended to deceive users.[324][325][326]

See also

Notes

References

  1. ^"Stable Channel Update for Desktop". November 15, 2021. Retrieved November 15, 2021.
  2. ^"Chrome for Android Update". November 15, 2021. Retrieved November 15, 2021.
  3. ^"Chrome for iOS Update". November 18, 2021. Retrieved November 18, 2021.
  4. ^"Extended Stable Channel Update for Desktop". October 28, 2021. Retrieved October 29, 2021.
  5. ^"Beta Channel Update for Desktop". November 18, 2021. Retrieved November 18, 2021.
  6. ^"Chromium (Google Chrome)". Ohloh.net. Retrieved February 8, 2012.
  7. ^"Chromium coding style". Google Open Source. Retrieved March 29, 2017.
  8. ^
  9. ^"Chrome 95 brings Material You to everyone, adds secure payment confirmation, and more". XDA Developers. October 21, 2021. Retrieved November 18, 2021.
  10. ^"Google Chrome (iOS)".
  11. ^"Supported languages". Google Play Console Help. Retrieved December 18, 2015.
  12. ^ abcd"Google Chrome and Chrome OS Additional Terms of Service". www.google.com.
  13. ^Ashford, Warwick (September 2, 2008). "Google launches beta version of Chrome web browser". Archived from the original on April 11, 2021.
  14. ^"Google Chrome for Android". developer.chrome.com. Retrieved June 20, 2020.
  15. ^ abBright, Peter (April 3, 2013). "Google going its own way, forking WebKit rendering engine". Ars Technica. Conde Nast. Retrieved March 9, 2017.Cite error: The named reference "auto" was defined multiple times with different content (see the help page).
  16. ^"Open-sourcing Chrome on iOS!". 2017. Retrieved April 26, 2021.
  17. ^"Desktop Browser Market Share Worldwide". StatCounter Global Stats. Retrieved October 13, 2021.
  18. ^"Tablet Browser Market Share Worldwide". StatCounter Global Stats. Retrieved October 13, 2021.
  19. ^"Tablet Browser Market Share Worldwide". StatCounter Global Stats. Retrieved March 15, 2021.
  20. ^"Browser Market Share Worldwide (Jan 2009 - September 2021)". Retrieved October 13, 2021.
  21. ^Angwin, Julia (July 9, 2009). "Sun Valley: Schmidt Didn't Want to Build Chrome Initially, He Says". WSJ Digits Blog. Retrieved May 25, 2010.
  22. ^"Rumours surround Google browser". September 23, 2004 – via news.bbc.co.uk.
  23. ^Kurtuldu, Mustafa (September 8, 2018). "How we designed Chrome 10 years ago". googleblog.com. Archived from the original on April 11, 2021.
  24. ^Bhardwaj, Prachi (June 29, 2018). "Larry Page has a reputation for pushing people at Google". Business Insider. Retrieved January 3, 2020.
  25. ^McCloud, Scott (September 1, 2008). "Surprise!". Google Blogoscoped. Retrieved September 1, 2008.
  26. ^Lenssen, Philipp (September 1, 2008). "Google Chrome, Google's Browser Project". Retrieved September 1, 2008.
  27. ^Lenssen, Philipp (September 1, 2008). "Google on Google Chrome – comic book". Google Blogoscoped. Retrieved September 1, 2008.
  28. ^ abcdefghijk"Google Chrome comic". Google Book Search. September 1, 2008. Retrieved September 2, 2008.Cite error: The named reference "chrome-comic" was defined multiple times with different content (see the help page). Cite error: The named reference "chrome-comic" was defined multiple times with different content (see the help page). Cite error: The named reference "chrome-comic" was defined multiple times with different content (see the help page). Cite error: The named reference "chrome-comic" was defined multiple times with different content (see the help page). Cite error: The named reference "chrome-comic" was defined multiple times with different content (see the help page). Cite error: The named reference "chrome-comic" was defined multiple times with different content (see the help page). Cite error: The named reference "chrome-comic" was defined multiple times with different content (see the help page). Cite error: The named reference "chrome-comic" was defined multiple times with different content (see the help page). Cite error: The named reference "chrome-comic" was defined multiple times with different content (see the help page). Cite error: The named reference "chrome-comic" was defined multiple times with different content (see the help page).
  29. ^ abPichai, Sundar; Upson, Linus (September 1, 2008). "A fresh take on the browser". Official Google Blog
Источник: https://en.wikipedia.org/wiki/Google_Chrome
Yahoo Answers eztv.ag :: 492 Mb. Techno Forum Download free 4.62 zmud [full version] monova.org :: 453 Mb. Today Software Free zmud 4.62 download on Pinterest thepiratebay.org :: 277 Mb. Open Source Software for running Windows applications on other operating systems. Zugg Software :: Downloads - zMUD. The Home site for Zugg Software. Category Last File Files; zMUD Plugins Plugins for the zMUD program Sub Category: None. forums.zuggsoft.com/index.php?page=4&action=... -翻译此页. Results 1 - 20 of 6000. If you search for Zmud 7.21 Crack, you will often see the word "crack" amongst the results which means it allows you to unlock the full version of the software. s/n: (1001) Key: (558074) Keywords: zmud 7.21 crack; zmud crack; zmud 4.62; zmud crack; zmud 4.62 download; zmud 5.55; zmud 7.04; zmud. Nevertheless, I've been looking around for a good, free (e.g. not ZMud etc.) MUD client that. 4.62 may be "free", but your odds of getting the automapper to work without crashing are roughly 50/50.... But when you get to niche software like this, the best place is to ask the community surrounding the niche. Yooo! I had a thought that might create som debate! Why is cmud or zmud never mentioned in mud recommended clients? Even outdated the are far... I was always partial to zmud 4.62 which was the only free one for years. But once I started doing advanced. Further there is the issue that you must innovate to sell software and there isn't any benefit to client innovation if there is no server innovation that requires it. I don't understand the opposition to open. zMUD 7.21 + crack • zMUD 7.21 crack • pliki użytkownika kostkowy9 przechowywane w serwisie Chomikuj.pl • zmud721.exe, Zmud721Crack.exe. HOW TO CRACK ZMUD 4.62 By +Sync Expiring Registration Codes - A New Breed Software: www.zuggsoft.com/zmud This was requested by someone so I. software gigabyte zMUD (7.21.0.0) get torrent tpb windows zip: official zMUD (7.21.0.0) 1337x philippine without virus nulled: GMA Games - VIPMud 2.0 WineHQ - zMUD 4.62 MUD client - Wikipedia disherzmudfdis282 - hub.docker. Download zMUD for Windows now from Softonic: 100% safe and virus free. Zmud 4.62 中文免安裝破解版, 解壓縮密碼: heros.muds.net:8888. 檔案說明:無. 下載點:. 載點一 (本地下載). 有鑒於不少玩家不熟悉Zmud,為了選Char而痛苦,在此放出選Char Tri的.mud 檔案,. 進入登入畫面時,選擇Settings->Load載入設置完成id,pw之後進入Attr 設置的地方按enter就開始跑了內建為定力上上悟性上上Str上上/上. Regular Search Results. zmud 4.62 download in game name. zMUD 7.21. zMUD is the fastest and most versatile MUD/Telnet client for PC/Windows. License: Shareware Genre: Puzzles

Ultrasonido G.E Logiq 700

Technical

Publications

Direction 46-030402

Revision 5

GE Medical Systems

LOGIQ t 700 Service Manual

E
Copyright 1993, 1994, 1995, 1996, 1997, 1998 By General Electric Co.

used by GEMS-Europe, GEMS-Asia and GEMS-Americas

Operating Documentation
GE Medical Systems: Telex 3797371
P.O. Box 414, Milwaukee, Wisconsin 53201 U.S.A.
(Asia, Pacific, Latin America, North America

GE Medical Systems – Europe: Tel: +49 (0) 212 28 02 208


Beethovenstraße 239, Postfach 11 05 60, D–42655 Solingen,
GERMANY
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

D THIS SERVICE MANUAL IS AVAILABLE IN ENGLISH ONLY.


WARNING D IF A CUSTOMER’S SERVICE PROVIDER REQUIRES A LANGUAGE OTHER
THAN ENGLISH, IT IS THE CUSTOMER’S RESPONSIBILITY TO PROVIDE
TRANSLATION SERVICES.
D DO NOT ATTEMPT TO SERVICE THE EQUIPMENT UNLESS THIS SERVICE
MANUAL HAS BEEN CONSULTED AND IS UNDERSTOOD.
D FAILURE TO HEED THIS WARNING MAY RESULT IN INJURY TO THE SERVICE
PROVIDER, OPERATOR OR PATIENT FROM ELECTRIC SHOCK,
MECHANICAL OR OTHER HAZARDS.

D CE MANUEL DE MAINTENANCE N’EST DISPONIBLE QU’EN ANGLAIS.


AVERTISSEMENT D SI LE TECHNICIEN DU CLIENT A BESOIN DE CE MANUEL DANS UNE AUTRE
LANGUE QUE L’ANGLAIS, C’EST AU CLIENT QU’IL INCOMBE DE LE FAIRE
TRADUIRE.
D NE PAS TENTER D’INTERVENTION SUR LES ÉQUIPEMENTS TANT QUE LE
MANUEL SERVICE N’A PAS ÉTÉ CONSULTÉ ET COMPRIS.
D LE NON-RESPECT DE CET AVERTISSEMENT PEUT ENTRAÎNER CHEZ LE
TECHNICIEN, L’OPÉRATEUR OU LE PATIENT DES BLESSURES DUES À DES
DANGERS ÉLECTRIQUES, MÉCANIQUES OU AUTRES.

D DIESES KUNDENDIENST–HANDBUCH EXISTIERT NUR IN


ENGLISCHER SPRACHE.
WARNUNG
D FALLS EIN FREMDER KUNDENDIENST EINE ANDERE SPRACHE BENÖTIGT,
IST ES AUFGABE DES KUNDEN FÜR EINE ENTSPRECHENDE ÜBERSETZUNG
ZU SORGEN.
D VERSUCHEN SIE NICHT, DAS GERÄT ZU REPARIEREN, BEVOR DIESES
KUNDENDIENST–HANDBUCH NICHT ZU RATE GEZOGEN UND VERSTANDEN
WURDE.
D WIRD DIESE WARNUNG NICHT BEACHTET, SO KANN ES ZU VERLETZUNGEN
DES KUNDENDIENSTTECHNIKERS, DES BEDIENERS ODER DES PATIENTEN
DURCH ELEKTRISCHE SCHLÄGE, MECHANISCHE ODER SONSTIGE
GEFAHREN KOMMEN.

D ESTE MANUAL DE SERVICIO SÓLO EXISTE EN INGLÉS.


AVISO D SI ALGÚN PROVEEDOR DE SERVICIOS AJENO A GEMS SOLICITA UN IDIOMA
QUE NO SEA EL INGLÉS, ES RESPONSABILIDAD DEL CLIENTE OFRECER UN
SERVICIO DE TRADUCCIÓN.
D NO SE DEBERÁ DAR SERVICIO TÉCNICO AL EQUIPO, SIN HABER
CONSULTADO Y COMPRENDIDO ESTE MANUAL DE SERVICIO.
D LA NO OBSERVANCIA DEL PRESENTE AVISO PUEDE DAR LUGAR A QUE EL
PROVEEDOR DE SERVICIOS, EL OPERADOR O EL PACIENTE SUFRAN
LESIONES PROVOCADAS POR CAUSAS ELÉCTRICAS, MECÁNICAS O DE
OTRA NATURALEZA.

1
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

D ESTE MANUAL DE ASSISTÊNCIA TÉCNICA SÓ SE ENCONTRA


DISPONÍVEL EM INGLÊS.
ATENÇÃO
D SE QUALQUER OUTRO SERVIÇO DE ASSISTÊNCIA TÉCNICA, QUE NÃO A
GEMS, SOLICITAR ESTES MANUAIS NOUTRO IDIOMA, É DA
RESPONSABILIDADE DO CLIENTE FORNECER OS SERVIÇOS DE TRADUÇÃO.
D NÃO TENTE REPARAR O EQUIPAMENTO SEM TER CONSULTADO E
COMPREENDIDO ESTE MANUAL DE ASSISTÊNCIA TÉCNICA.
D O NÃO CUMPRIMENTO DESTE AVISO PODE POR EM PERIGO A SEGURANÇA
DO TÉCNICO, OPERADOR OU PACIENTE DEVIDO A‘ CHOQUES ELÉTRICOS,
MECÂNICOS OU OUTROS.

D IL PRESENTE MANUALE DI MANUTENZIONE È DISPONIBILE


SOLTANTO IN INGLESE.
AVVERTENZA
D SE UN ADDETTO ALLA MANUTENZIONE ESTERNO ALLA GEMS RICHIEDE IL
MANUALE IN UNA LINGUA DIVERSA, IL CLIENTE È TENUTO A PROVVEDERE
DIRETTAMENTE ALLA TRADUZIONE.
D SI PROCEDA ALLA MANUTENZIONE DELL’APPARECCHIATURA SOLO DOPO
AVER CONSULTATO IL PRESENTE MANUALE ED AVERNE COMPRESO IL
CONTENUTO.
D NON TENERE CONTO DELLA PRESENTE AVVERTENZA POTREBBE FAR
COMPIERE OPERAZIONI DA CUI DERIVINO LESIONI ALL’ADDETTO ALLA
MANUTENZIONE, ALL’UTILIZZATORE ED AL PAZIENTE PER
FOLGORAZIONE ELETTRICA, PER URTI MECCANICI OD ALTRI RISCHI.

2
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

REVISION HISTORY

REV DATE PRIMARY REASON FOR CHANGE


0 Sep 30, 1994 Initial document release
1 Feb 10, 1995 Document update for R4.3
2 Nov 1, 1995 Document update for R5 software and V2 (EMC) hardware
3 Apr 26, 1996 Update for R5.6.4 and R6.0 software and hardware
4 Apr 18, 1997 Update for R6.2 software and hardware
4+ Apr 20, 1998 Update for R6.2.3 software, R7.1 software and hardware, and GE Standards)

LIST OF EFFECTIVE PAGES

PAGE REV PAGE REV PAGE REV PAGE REV PAGE REV

Title . . . . . . . . . . . . . . . 5
GE Logo Page . . . . . . 5
1 to 4 . . . . . . . . . . . . . . 5
i to x . . . . . . . . . . . . . . . 5
1–1 to 1–18 . . . . . . . . . 5
2–1 to 2–14 . . . . . . . . . 5
3–1 to 3–22 . . . . . . . . . 5
4–1 to 4–20 . . . . . . . . . 5
5–1 to 5–32 . . . . . . . . . 5
6–1 to 6–76 . . . . . . . . . 5
7–1 to 7–26 . . . . . . . . . 5
8–1 to 8–36 . . . . . . . . . 5
9–1 to 9–90 . . . . . . . . . 5
10–1 to 10–16 . . . . . . 5
Index–1 to Index–8 . . 5

3
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

intentionally blank

4
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

TABLE OF CONTENTS

SECTION PAGE

TABLE OF CONTENTS
LIST OF ILLUSTRATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv
LIST OF TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xiv

SECTION 1 – SAFETY
1–1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1– 2
1–2 IMPORTANT CONVENTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1– 3
1–3 SAFETY CONSIDERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1– 7
1–4 EMC, EMI, AND ESD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1– 15
1–5 CUSTOMER ASSISTANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1– 17

SECTION 2 – PREINSTALLATION
2–1 PURPOSE OF SECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2–2
2–2 GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2–2
2–3 FACILITY NEEDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2–6
2–4 ELECTRICAL NEEDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2–9
2–5 DICOM OPTION PRE–INSTALLATION REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . 2–10
Sales/Service Preinstallation Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2–13

SECTION 3 – INSTALLATION
3–1 PURPOSE OF SECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–2
3–2 GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–2
3–3 RECEIVING AND UNPACKING THE EQUIIPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–5
3–4 INSPECTING THE FACILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–7
3–5 PREPARING THE UNIT FOR INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–8
3–6 COMPLETING THE INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–11
3–7 TRANSPORTING THE UNIT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–20
Installation Certificate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–21

SECTION 4 – FUNCTIONAL CHECKS AND SITE LOG


4–1 PURPOSE OF SECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4–2
4–2 GENERAL PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4–3
4–3 FUNCTIONAL CHECKS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4–6
4–4 SITE LOG . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4–19

SECTION 5 – SYSTEM OVERVIEW


5–1 PURPOSE OF SECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–2
5–2 LOGIQ 700 DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–2
5–3 ACOUSTIC OUTPUT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–6
5–4 LOGIQ 700 CIRCUIT CARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–9
5–5 POWER SYSTEM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–19

i
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

TABLE OF CONTENTS (Continued)

SECTION PAGE

SECTION 6 – DIAGNOSTIC SOFTWARE


6–1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–2
6–2 SERVICE SOFTWARE TOOL DESCRIPTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–3
6–3 DIAGNOSTICS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–20
6–4 VIEW LOGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–34
6–5 DIAGNOSTIC DESCRIPTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–46
6–6 LOADING SYSTEM SOFTWARE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–65
6–7 IMPORTANT TROUBLESHOOTING HINTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–76

SECTION 7 – ASSEMBLY
7–1 PURPOSE OF SECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–2
7–2 ACCESS ITEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–3
7–3 FUNCTIONAL ITEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–6
7–4 JUMPERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–22

SECTION 8 – SYSTEM PERFORMANCE AND MESSAGES


8–1 PURPOSE OF SECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–2
8–2 MECHANICAL PERFORMANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–3
8–3 POWER PERFORMANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–5
8–4 SYSTEM TIMING PERFORMANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–8
8–5 MONITOR PERFORMANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–9
8–6 IMAGE PERFORMANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–12
8–7 VIDEO OUTPUT PERFORMANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–13
8–8 AUDIO OUTPUT PERFORMANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–16
8–9 LED INDICATORS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–17
8–10 CONTROL PANEL SELF–TEST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–20
8–11 SYSTEM MESSAGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–25

SECTION 9 – RENEWAL PARTS


9–1 PURPOSE OF SECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–2
9–2 ARRANGEMENT OF THIS SECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–2
9–3 EQUIPMENT MODELS COVERED IN THIS SECTION . . . . . . . . . . . . . . . . . . . . . . . . 9–3
9–4 ABBREVIATIONS/CONVENTIONS USED IN THIS SECTION . . . . . . . . . . . . . . . . . . 9–4
9–5 KITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–4
9–6 PACKING CIRCUIT CARDS FOR RESHIPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–90

SECTION 10 – PLANNED MAINTENANCE


10–1 PURPOSE OF SECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10–2
10–2 PLANNED MAINTENANCE (PM) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10–3
10–3 SYSTEM MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10–5
10–4 PROBE MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10–12

ii
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

LIST OF ILLUSTRATIONS

Illustration Page

1–1 LABELS FOUND ON FRONT OF LOGIQ 700 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1– 11


1–2 LABELS FOUND ON BACK OF LOGIQ 700 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1– 12
1–3 LABELS FOUND ON PROBES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1– 13
1–4 LOCATING PART NUMBERS ON CIRCUIT CARD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1– 17

2–1 ENVELOPE DIMENSIONS FOR LOGIQ 700 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2–3


2–2 RECOMMENDED (14 BY 17 FEET) FLOOR PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2–7
2–3 MINIMAL (8 BY 10 FEET) FLOOR PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2–7
2–4 WORKSHEET FOR DICOM NETWORK INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2–10
2–5 WORKSHEET FOR USER NETWORK PREFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2–11

3–1 PIN CONFIGURATIONS FOR 120 VAC SITE OUTLET . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–7


3–2 TYPICAL NEON OUTLET TESTER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–7
3–3 LOCATION OF RATING PLATE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–8
3–4 ISOLATION TRANSFORMER TERMINAL BLOCK SHOWING SOME POSSIBLE
WIRE, SHUNT, AND JUMPER CONNECTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–9
3–5 RESISTANCE TEST OF UNIT GROUNDING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–10
3–6 LOCATIONS OF SEISMIC ANCHORS AND OPTION RATING PLATES . . . . . . . . . . . . . . . 3–12
3–7 DIAGRAM OF TEST SETUP FOR CHASSIS LEAKAGE CURRENT . . . . . . . . . . . . . . . . . . . 3–13
3–8 REAR VIEW OF UNIT SHOWING CIRCUIT BREAKERS AND GROUND STUD . . . . . . . . 3–14
3–9 DIAGRAM OF TEST SETUP FOR PROBE LEAKAGE CURRENT . . . . . . . . . . . . . . . . . . . . 3–15
3–10 DIAGRAM OF TEST SETUP FOR PERIPHERAL LEAKAGE CURRENT . . . . . . . . . . . . . . . 3–17

4–2 B–MODE DISPLAY SCREEN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4–8


4–3 ACTUAL B IMAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4–10
4–4 M–MODE DISPLAY SCREEN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4–12
4–5 ACTUAL M IMAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4–12
4–6 B PLUS COLOR MODE DISPLAY SCREEN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4–14
4–7 ACTUAL 2D COLOR FLOW IMAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4–14
4–8 PW DOPPLER DISPLAY SCREEN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4–16
4–9 ACTUAL PW IMAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4–16

5–1 LOCATION OF MAJOR COMPONENTS WITHIN LOGIQ 700 . . . . . . . . . . . . . . . . . . . . . . . 5–2


5–2 SYSTEM DATA PATH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–3
5–3 BASIC SYSTEM BLOCK DIAGRAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–4
5–4 DETAILED SYSTEM BLOCK DIAGRAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–8
5–5 CIRCUIT CARDS IN FE CARD CAGE (V2/V3 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–10
5–6 CIRCUIT CARDS IN FE CARD CAGE (V3 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–10
5–7 CIRCUIT CARDS AND SUBSYSTEMS IN BE CARD CAGE . . . . . . . . . . . . . . . . . . . . . . . . . . 5–13
5–8 CIRCUIT CARDS AND INTERCONNECTIONS WITHIN OPERATOR CONTROL PANEL 5–17
5–9 LOGIQ 700 POWER SYSTEM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–20
5–10 DC–DC CONVERTER (PS2) POWER DISTRIBUTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–23
5–11 LOW NOISE POWER SUPPLY (PS3) POWER DISTRIBUTION (V1/V2 UNITS) . . . . . . . . 5–26
5–12 LOW NOISE POWER SUPPLY (PS3) POWER DISTRIBUTION (V3 UNITS) . . . . . . . . . . . 5–27
5–13 PHYSICAL LOCATIONS OF POWER POINTS ON FEBP . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–29
5–14 PHYSICAL LOCATIONS OF POWER POINTS ON BEBP . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–30
5–15 CONTROL PANEL INTERCONNECTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–31
5–16 PROBE POWER POINTS ON XDIF CONNECTOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–32

iii
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

LIST OF ILLUSTRATIONS (Continued)


Illustration Page
6–1 TEST PATH FOR VISUAL CHANNEL ALIVE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–3
6–2 SECTOR IMAGES FOR 128 ELEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–4
6–3 RMI 403GS PHANTOM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–6
6–4 ROI TOOL ON LOGIQ 700 MONITOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–7
6–5 FOUR ”CYSTS” USED TO QUALIFY GRAYSCALE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–8
6–6 VESSELS AT 8 AND 14 CM DEPTHS FOR CONTRAST RESOLUTI0N . . . . . . . . . . . . . . . 6–9
6–7 DIAGRAM OF EXTERNAL VIDEO INPUTS TESTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–12
6–8 CONNECTION POINTS FOR EXTERNAL VIDEO INPUTS . . . . . . . . . . . . . . . . . . . . . . . . . . 6–13
6–9 DIAGRAM OF VIDEO TEST PATTERNS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–14
6–10 FIRST BRIGHTNESS AND CONTRAST VIDEO TEST PATTERN . . . . . . . . . . . . . . . . . . . . . 6–16
6–11 SECOND BRIGHTNESS AND CONTRAST VIDEO TEST PATTERN . . . . . . . . . . . . . . . . . . 6–17
6–12 PURE COLORS VIDEO TEST PATTERNS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–17
6–13 LINEARITY VIDEO TEST PATTERN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–18
6–14 SMPTE VIDEO TEST PATTERN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–18
6–15 LINEARITY AND CONVERGENCE VIDEO TEST PATTERN . . . . . . . . . . . . . . . . . . . . . . . . . 6–19
6–16 TEXT VIDEO TEST PATTERN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–19
6–17 PIN ASSIGNMENTS FOR CABLE FROM LOGIQ 700 TO PC . . . . . . . . . . . . . . . . . . . . . . . 6–20
6–18 VT200/PC CONNECTION TO LOGIC 700 BULKHEAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–23
6–19 ACCESS SCREENS FOR gemsC DIAGNOSTICS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–25
6–20 LOGIQ 700 gemsC TOP LEVEL SCREEN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–26
6–21 LOGIQ 700 gemsC DIAGNOSTIC SCREEN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–27
6–22 TEST INPUT SCREEN FOR gemsC DIAGNOSTICS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–28
6–23 LOOPING SUBTEST PROMPT SCREEN FOR gemsC DIAGNOSTICS . . . . . . . . . . . . . . . . 6–29
6–24 SELECTING AND STARTING A DIAGNOSTIC TEST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–30
6–25 SELECTING A CAPTURE LOG FOR DISPLAY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–31
6–26 CAPTURE LOG EXAMPLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–31
6–27 SCREENS FOR EXITING gemsC DIAGNOSTICS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–32
6–28 VIEW LOGS DROPDOWN MENU FOR gemsC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–34
6–29 ERROR LOG FILE SCREEN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–35
6–30 PHYSICAL LOCATION OF TEMPERATURE SENSORS WITHIN UNIT . . . . . . . . . . . . . . . . 6–36
6–31 BLOCK DIAGRAM OF TEMPERATURE SENSING CIRCUITS . . . . . . . . . . . . . . . . . . . . . . . 6–36
6–32 TEMPERATURE LOG EXAMPLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–37
6–33 EXAMPLE OF PAGE 2 OF SYSTEM CONFIGURATION LOG . . . . . . . . . . . . . . . . . . . . . . . . 6–42
6–34 TD CHANNEL ASSIGNMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–60
6–35 CALIBRATION DIAGNOSTIC ELEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–61
6–36 CALIBRATION LOG EXAMPLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–62
6–37 LOCATION OF RATING PLATES FOR UPGRADES AND OPTIONS . . . . . . . . . . . . . . . . . . 6–69

7–1 AIR FILTER, SIDE COVER, AND REAR COVER REMOVAL . . . . . . . . . . . . . . . . . . . . . . . . . 7–3
7–2 CONTROL PANEL AND UPPER AND LOWER FRONT COVER REMOVAL . . . . . . . . . . . . 7–4
7–3 REAR BUMPER REMOVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–5
7–4 SIDE BUMPER REMOVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–5
7–5 LOCATION OF FUSE ON BULK CONVERTER (PS1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–6
7–6 LOCATION OF FUSE ON ORIGINAL SSR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–7
7–7 LOCATION OF FUSES ON MASTER CONTROLLER (MC) . . . . . . . . . . . . . . . . . . . . . . . . . . 7–7
7–8 LOCATION OF CIRCUIT BREAKERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–8
7–9 SSR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–9
7–10 ISOLATION TRANSFORMER REMOVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–10

iv
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

LIST OF ILLUSTRATIONS (Continued)


Illustration Page

7–11 POWER SUPPLY REMOVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–11


7–12 POWER SUPPLY WIRING (V1/V2 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–12
7–13 POWER SUPPLY WIRING (V3 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–13
7–14 ASSEMBLY OF AUDIO COMPONENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–14
7–15 RF CABLE CONNECTIONS TO TD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–15
7–16 RF CABLE CONNECTIONS TO XDIF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–16
7–17 OPERATION PANEL REMOVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–17
7–18 ROUTING CABLES FOR OPERATOR PANEL THROUGH GAS CYLINDER ASSEMBLY 7–18
7–19 UNDERSIDE OF OPERATOR PANEL SHOWING CABLE ROUTING AND
ATTACHING HARDWARE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–19
7–20 TASKLIGHT AND TASKLIGHT FIBER OPTIC CABLE REMOVAL . . . . . . . . . . . . . . . . . . . . . 7–20
7–21 MONITOR REMOVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–21
7–22 JUMPER INSTALLATION IN SOFT–START SSR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–22
7–23 JUMPER INSTALLATION ON PIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–23
7–24 JUMPER INSTALLATION ON MC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–23
7–25 JUMPER INSTALLATION ON BEBP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–23
7–26 JUMPER INSTALLATION ON HEWLETT–PACKARD HP3323A OR SE (P2) OR
HPC3724S OR 25 (P3) HARD DRIVES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–24
7–27 JUMPER INSTALLATION ON FUJITSU M1606SAU (P3) HARD DRIVES . . . . . . . . . . . . . . 7–24
7–28 JUMPER INSTALLATION ON SEAGATE ST31051N (P3), ST31203N (P3),
ST32430N (P4), AND ST32430N (P4) HARD DRIVEs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–25
7–29 JUMPER INSTALLATION ON FUJITSU M2512A AND M2513A MODS . . . . . . . . . . . . . . . . 7–25
7–30 JUMPER INSTALLATION ON SYTM2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–26
7–31 JUMPER INSTALLATION ON XDIF2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–26

8–1 BRAKE ADJUSTMENT OF NEWER STYLE FRONT WHEEL ASSEMBLY . . . . . . . . . . . . . 8–3


8–2 SYSTEM POWER AT POWER SUPPLIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–5
8–3 SYSTEM POWER DESTINATIONS AT BACKPLANE TERMINALS . . . . . . . . . . . . . . . . . . . 8–6
8–4 SCSI POWER SOURCES AND DESTINATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–7
8–5 EXTERNAL OSCILLATOR POWER SOURCE AND DESTINATION . . . . . . . . . . . . . . . . . . 8–7
8–6 OSCILLATOR OUTPUT SIGNAL TERMINALS AND CHARACTERISTICS . . . . . . . . . . . . . 8–8
8–7 LOCATION OF MONITOR CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–9
8–8 VIDEO SIGNAL CONNECTOR LOCATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–10
8–9 TEST PATTERNS USED TO ADJUST BRIGHTNESS FOR MR IMAGING . . . . . . . . . . . . . 8–11
8–10 LOCATION OF VIDEO OUTPUT SIGNALS AT UNIT BULKHEAD . . . . . . . . . . . . . . . . . . . . . 8–13
8–11 CHROMA VIDEO SIGNAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–13
8–12 LUMA (Y) OR B/W VIDEO SIGNAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–14
8–13 COMPOSITE VIDEO SIGNAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–14
8–14 RGB VIDEO SIGNAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–14
8–15 INTERLACED BLANKING PERIOD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–14
8–16 COMBINED H AND V SYNC TO MONITOR AND BULKHEAD . . . . . . . . . . . . . . . . . . . . . . . . 8–15
8–17 LOCATIONS OF AUDIO SIGNAL INTERFACES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–16
8–18 LED LOCATIONS IN BACK END CARD CAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–17
8–19 SCAN CONTROL (SS) AND SCAN CONVERSION (XY) LEDS . . . . . . . . . . . . . . . . . . . . . . . 8–17
8–20 LOCATIONS OF LEDS, TEST POINTS, JUMPERS AND SIGNAL ON PIA . . . . . . . . . . . . . 8–18
8–21 SOFTKEY DISPLAY DIAGNOSTIC SCREEN – TGC POTS . . . . . . . . . . . . . . . . . . . . . . . . . . 8–20
8–22 DIAGNOSTIC SCREEN – ROTARY ENCODERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–21
8–23 DIAGNOSTIC SCREEN – TRACKBALL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–21
8–24 DIAGNOSTIC SCREEN – KEYBOARD KEYS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–22
8–25 DIAGNOSTIC SCREEN – SWITCHES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–23
8–26 ENGLISH LANGUAGE CONTROL PANEL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–24

v
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

LIST OF ILLUSTRATIONS (Continued)


Illustration Page

9–1 PROBES AND RELATED ITEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–5


9–2 SIDE COVERS, REAR COVERS, AND MONITOR ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . 9–6
9–3 MONITOR ASSEMBLY BREAKDOWN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–8
9–4 FRONT COVERS, XDIF, AND OPERATOR CONTROL PANEL . . . . . . . . . . . . . . . . . . . . . . . 9–10
9–5 OPERATOR CONTROL PANEL BREAKDOWN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–12
9–6 UPPER OPERATOR PANEL BREAKDOWN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–14
9–7 LOWER OPERATOR PANEL BREAKDOWN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–16
9–8 FRONT END BACKPLANE (V1 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–20
9–9 FRONT END BACKPLANE (V2 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–22
9–10 FRONT END BACKPLANE (V3 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–24
9–11 FRONT END CIRCUIT CARDS AND CARD CAGE (V1/V2 UNITS) . . . . . . . . . . . . . . . . . . . 9–26
9–12 FRONT END CIRCUIT CARDS AND CARD CAGE (V3 UNITS) . . . . . . . . . . . . . . . . . . . . . . 9–28
9–13 SQUIRREL CAGE COOLING FAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–30
9–14 MUFFIN FAN ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–32
9–15 MUFFIN FAN ASSEMBLY BREAKDOWN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–33
9–16 REAR BUMPER, POWER SUPPLIES, AND BULKHEAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–34
9–17 BULKHEAD ASSEMBLY BREAKDOWN (V1 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–36
9–18 BULKHEAD ASSEMBLY BREAKDOWN (V2/V3 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–38
9–19 HARD DRIVE AND MOD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–40
9–20 BACK END CARDS AND CARD CAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–42
9–21 BACK END BACKPLANE (V1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–44
9–22 BACK END BACKPLANE (V2/V3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–46
9–23 TEMPERATURE SENSORS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–48
9–24 INTERCONNECT CABLES (V1 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–50
9–25 INTERCONNECT CABLES (V2 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–52
9–26 INTERCONNECT CABLES (V3 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–54
9–27 ISOLATION TRANSFORMER AND HIGH VOLTAGE CAPACITOR ASSEMBLY . . . . . . . . . 9–56
9–28 AC WIRING (BASIC SYSTEM) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–58
9–29 AC WIRING (SOFT–START SYSTEM WITH SERVICE OUTLET) . . . . . . . . . . . . . . . . . . . . . 9–60
9–30 AC WIRING (SOFT–START SYSTEM WITH MONITOR CIRCUIT BREAKER) . . . . . . . . . . 9–62
9–31 AC POWER DISTRIBUTION ASSEMBLY (BASIC SYSTEM) . . . . . . . . . . . . . . . . . . . . . . . . . 9–64
9–32 AC POWER DISTRIBUTION ASSEMBLY (SOFT–START SYSTEM WITH SERVICE OUTLET) . . .
9–66
9–33 AC POWER DISTRIBUTION ASSEMBLY (SOFT–START SYSTEM WITH
MONITOR CIRCUIT BREAKER) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–68
9–34 RF SHIELDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–70
9–35 RF GASKETS (V2/V3 UNITS ONLY) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–72
9–36 FRAME ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–74
9–37 GAS SPRING ASSEMBLY BREAKDOWN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–76
9–38 FRONT WHEEL ASSEMBLY BREAKDOWN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–78
9–39 PACKING A CIRCUIT CARD FOR SHIPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–90

10–1 POWER CORD REMINDERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10–10


10–2 UNIT AND POWER SUPPLY FILTER LOCATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10–10

vi
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

LIST OF TABLES

Table Page

1–1 HAZARD ICONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1– 4


1–2 PRODUCT ICONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1– 5
1–3 RULES FOR PREVENTING OR LESSENING ESD DAMAGE . . . . . . . . . . . . . . . . . . . . . . . . 1– 16
1–4 PHONE NUMBERS FOR CUSTOMER ASSISTANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1– 17

2–1 PHYSICAL DIMENSIONS OF LOGIQ 700 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2–2


2–2 EMI PREVENTION/ABATEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2–4
2–3 LOGIQ 700 ENVIRONMENTAL LIMITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2–8
2–4 WAITING TIME PRIOR TO OPERATING A UNIT THAT ARRIVES TOO HOT OR COLD . 2–8
2–5 LOGIQ 700 POWER RATING CONFIGURATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2–9

3–1 TOOLS NEEDED FOR INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–2


3–2 WIRE, SHUNT, AND JUMPER CONNECTIONS TO ISOLATION TRANSFORMER . . . . . . 3–9
3–3 DATA SHEET FOR CHASSIS LEAKAGE CURRENT TEST . . . . . . . . . . . . . . . . . . . . . . . . . . 3–14
3–4 DATA SHEET FOR TYPE BF PROBE LEAKAGE CURRENT TEST . . . . . . . . . . . . . . . . . . . 3–16
3–5 DATA SHEET FOR TYPE CF PROBE LEAKAGE CURRENT TEST . . . . . . . . . . . . . . . . . . . 3–16
3–6 DATA SHEET FOR PERIPHERAL LEAKAGE CURRENT TEST . . . . . . . . . . . . . . . . . . . . . . 3–18
3–7 TROUBLESHOOTING PROCEDURES FOR LEAKAGE CURRENT PROBLEMS . . . . . . . 3–19

4–1 POWER–ON/BOOT–UP TESTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4–3

5–1 SUBSYSTEM SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–5


5–2 ACOUSTIC POWER INDICATIONS ON IMAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–7
5–3 MODE AFFECTED BY AO CHANGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–7
5–4 EFFECTS OF PANEL CONTROLS ON ACOUSTIC POWER . . . . . . . . . . . . . . . . . . . . . . . . . 5–7
5–5 FUNCTIONS OF FE CIRCUIT CARDS IN FE CARD CAGE . . . . . . . . . . . . . . . . . . . . . . . . . . 5–11
5–6 FUNCTIONS OF OTHER FE CIRCUIT CARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–12
5–7 FUNCTIONS OF KERNEL CIRCUIT CARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–14
5–8 FUNCTIONS OF MID PROCESSOR CIRCUIT CARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–15
5–9 FUNCTIONS OF SCAN CONVERTER CIRCUIT CARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–16
5–10 FUNCTIONS OF CIRCUIT CARDS IN OPERATOR CONTROL PANEL . . . . . . . . . . . . . . . 5–18
5–11 BULK CONVERTER INPUT/OUTPUT SPECIFICATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–21
5–12 DESCRIPTION OF BULK CONVERTER CONTROL SIGNALS . . . . . . . . . . . . . . . . . . . . . . . 5–21
5–13 DC–DC CONVERTER OUTPUT SPECIFICATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–22
5–14 DESCRIPTION OF DC–DC CONVERTER CONTROL SIGNALS . . . . . . . . . . . . . . . . . . . . . 5–22
5–15 LOW NOISE POWER SUPPLY OUTPUT SPECIFICATIONS . . . . . . . . . . . . . . . . . . . . . . . . . 5–24
5–16 DESCRIPTION OF LOW NOISE POWER SUPPLY CONTROL SIGNALS . . . . . . . . . . . . . . 5–25
5–17 FRONT END POWER USAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–28
5–18 BACK END POWER USAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–30
5–19 CONTROL PANEL POWER USAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–31

vii
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

LIST OF TABLES (Continued)


Table Page

6–1 TESTS IN VISUAL CHANNEL ALIVE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–4


6–2 PORTION OF VIDEO I/O CABLE USED DURING EXTERNAL VIDEO INPUTS TESTS . . 6–12
6–3 PORTI0N OF VIDEO I/O CABLES USED BY VIDEO TEST PATTERNS (V1 UNITS) . . . . . 6–14
6–4 PORTI0N OF VIDEO I/O CABLES USED BY VIDEO TEST PATTERNS (V2/V3 UNITS) . . 6–15
6–5 KEYSTROKE COMMANDS FOR gemsC DIAGNOSTICS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–22
6–6 TEMPERATURE RELATED MESSAGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–37
6–7 TD CHANNEL NUMBER ASSIGNMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–59
6–8 POSSIBLE ACTIONS IF SYSTEM ABORTS CALIBRATION . . . . . . . . . . . . . . . . . . . . . . . . . . 6–63
6–9 POSSIBLE ACTIONS IF SYSTEM FAILS CALIBRATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–63
6–10 CHANNEL/COMPONENT CORRELATIONS FOR BEAMFORMER . . . . . . . . . . . . . . . . . . . 6–64
6–11 OB DEFAULT COMMENTS FOR FRENCH, GERMAN, ITALIAN, AND SPANISH . . . . . . . 6–65
6–12 RECORDING TABLE FOR USER PREFERRED OB COMMENT . . . . . . . . . . . . . . . . . . . . . 6–65

7–1 LOGIQ 700 FUSE COMPLEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7–6


7–2 LOGIQ 700 COMPONENTS WITH JUMPERS (OR DIP SWITCHES) . . . . . . . . . . . . . . . . 7–22

8–1 MONITOR TROUBLESHOOTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–9


8–2 DESCRIPTIONS OF SYSTEM ERROR MESSAGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8–26

9–1 PROBES AND RELATED ITEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–5


9–2 SIDE COVERS, REAR COVERS, AND MONITOR ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . 9–7
9–3 MONITOR ASSEMBLY BREAKDOWN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–9
9–4 FRONT COVERS, XDIF, AND OPERATOR CONTROL PANEL . . . . . . . . . . . . . . . . . . . . . . . 9–11
9–5 OPERATOR CONTROL PANEL BREAKDOWN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–13
9–6 UPPER OPERATOR PANEL BREAKDOWN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–15
9–7 LOWER OPERATOR PANEL BREAKDOWN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–17
9–8 FRONT END BACKPLANE (V1 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–21
9–9 FRONT END BACKPLANE (V2 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–23
9–10 FRONT END BACKPLANE (V3 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–25
9–11 FRONT END CIRCUIT CARDS AND CARD CAGE (V1/V2 UNITS) . . . . . . . . . . . . . . . . . . . 9–27
9–12 FRONT END CIRCUIT CARDS AND CARD CAGE (V3 UNITS) . . . . . . . . . . . . . . . . . . . . . . 9–29
9–13 SQUIRREL CAGE COOLING FAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–31
9–14 MUFFIN FAN ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–32
9–15 MUFFIN FAN ASSEMBLY BREAKDOWN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–33
9–16 REAR BUMPER, POWER SUPPLIES, AND BULKHEAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–35
9–17 BULKHEAD ASSEMBLY BREAKDOWN (V1 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–37
9–18 BULKHEAD ASSEMBLY BREAKDOWN (V2/V3 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–39
9–19 HARD DRIVE AND MOD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–41
9–20 BACK END CARDS AND CARD CAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–43
9–21 BACK END BACKPLANE (V1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–45
9–22 BACK END BACKPLANE (V2/V3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–47
9–23 TEMPERATURE SENSORS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–49
9–24 INTERCONNECT CABLES (V1 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–51
9–25 INTERCONNECT CABLES (V2 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–53
9–26 INTERCONNECT CABLES (V3 UNITS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–55
9–27 ISOLATION TRANSFORMER AND HIGH VOLTAGE CAPACITOR ASSEMBLY . . . . . . . . . 9–57
9–28 AC WIRING (BASIC SYSTEM) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–59
9–29 AC WIRING (SOFT–START SYSTEM WITH SERVICE OUTLET) . . . . . . . . . . . . . . . . . . . . . 9–61
9–30 AC WIRING (SOFT–START SYSTEM WITH MONITOR CIRCUIT BREAKER) . . . . . . . . . . 9–63

viii
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

LIST OF TABLES (Continued)


Table Page

9–31 AC POWER DISTRIBUTION ASSEMBLY (BASIC SYSTEM) . . . . . . . . . . . . . . . . . . . . . . . . . 9–65


9–32 AC POWER DISTRIBUTION ASSEMBLY (SOFT–START SYSTEM WITH
SERVICE OUTLET) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–67
9–33 AC POWER DISTRIBUTION ASSEMBLY (SOFT–START SYSTEM WITH
MONITOR CIRCUIT BREAKER) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–69
9–34 RF SHIELDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–71
9–35 RF GASKETS (V2/V3 UNITS ONLY) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–73
9–36 FRAME ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–75
9–37 GAS SPRING ASSEMBLY BREAKDOWN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–77
9–38 FRONT WHEEL ASSEMBLY BREAKDOWN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–79
9–39 SOFTWARE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–80
9–40 RENEWAL PARTS KITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–81
9–41 CONTENTS OF KIT 1 (2113295) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–82
9–42 CONTENTS OF KIT 2 (2113295–2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–82
9–43 CONTENTS OF KIT 3 (2113295–3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–83
9–44 CONTENTS OF KIT 4 (2113295–4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–83
9–45 CONTENTS OF KIT 5 (2113295–5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–84
9–46 CONTENTS OF KIT 6 (2113295–6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–84
9–47 CONTENTS OF KIT 7 (2113295–7) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–85
9–48 CONTENTS OF KIT 8 (2113295–8) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–85
9–49 CONTENTS OF KIT 9 (2113295–9) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–86
9–50 CONTENTS OF KIT D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–86
9–51 CONTENTS OF KIT K (2122406–5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–87
9–52 CONTENTS OF KIT M (2122406–3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–87
9–53 CONTENTS OF KIT P (2122406–6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–88
9–54 OTHER KITS AND TOOLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9–89

10–1 TOLL–FREE PHONE NUMBERS FOR GEMS SUPPORT CENTERS . . . . . . . . . . . . . . . . . 10–3


10–2 TOOL REQUIREMENTS FOR PLANNED MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . 10–4

ix
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

intentionally blank

x
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–1 INTRODUCTION

1–1–1 Purpose of Service Manual


This service manual provides installation and servicing of LOGIQ 700. Study this service manual before installing
t
or repairing a LOGIQ 700 system. Store the service manual near the unit for easy reference. Review the contents
periodically for warnings, safety precautions, maintenance requirements, and proper procedures.

1–1–2 Purpose of Section


This section describes important issues related to safely servicing this ultrasound machine. The service provider must
read and understand all the information presented here before installing or servicing a unit.

1–1–3 Purpose of Operator Manual


The Operator Manual should be fully read and understood before operating the LOGIQ t 700 and also kept near
the unit for quick reference.

1– 2
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–2 IMPORTANT CONVENTIONS

1–2–1 Conventions Used in Book


Model Designations. There are three basic models of the LOGIQ 700. These models are referenced throughout
this manual as V1, V2, and V3. The V1 was the initial model. The V2 model resulted when Electromagnetic
Compatibility (EMC) provisions were added. The V3 model retains the EMC provisions, but uses 16–channel Time
Delay boards (TDs) rather than 8–channel TDs.

Icons. Pictures, or icons, are used wherever they will reinforce the printed message. The icons, labels and
conventions used on the product and in the service information are described in this chapter.

Safety Precaution Messages. Various levels of safety precaution messages may be found on the equipment and
in the service information. The different levels of concern are identified by a flag word that precedes the precautionary
message. Known or potential hazards are labeled in one of three ways:

DANGER Danger is used to indicate the presence of a hazard that will cause severe
personal injury or death if the instructions are ignored.

WARNING Warning is used to indicate the presence of a hazard that can cause
severe personal injury and property damage if instructions are ignored.

CAUTION Caution is used to indicate the presence of a hazard that will or can cause
minor personal injury and property damage if instructions are ignored.

Notes. Notes are used to provide important information about an item or a procedure. Be sure to read the notes:
the information contained in a note can often save you time or effort.

Diagram Conventions. Conventions used in the diagrams within the service manuals include:

Circuit blocks on circuit cards that reside in the Front End (FE) card cage are
shaded in dark gray.

Circuit blocks on circuit cards that reside in the Back End (BE) card cage are
shaded in light gray.

ÉÉÉÉ
ÉÉÉÉ Circuit blocks or parts that are optional are shaded with angled stripes.

ÉÉÉÉ
A3–P2–A32 Designators are used to describe physical location and component types. In the
example at the left: A3 is the slot, P2 is the connector, A32 is the pin.
MC_ALM_40P0–P Signal names usually indicate their source and destination. The signal name
shown originates on the MC (master controller) and is provided to the ALM
(Acoustic Line Memory). When a signal is delivered to a part, and the part does
not currently use that signal, the signal’s name is listed but a line is drawn
through the name.

1– 3
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–2–2 Standard Hazard Icons


Potential people hazards are indicated in the service and operating information by the icons shown and defined in
Table 1–1.
TABLE 1–1
HAZARD ICONS

Icon Definition Location


Biological S Possible infection due to handling contaminated S cleaning and care instructions
Hazard equipment.
S sheath and glove guidelines
S Patient/user injury or adverse reaction to
contact materials.
Electrical S Electrical shock hazard to patient, operator, or S covers removed
Hazard service person.
S probe handling
S Electrical micro-shock to patient, e.g.,
ventricular fibrillation initiated. S patient connections
–or–
S back panel connections

S peripherals

Moving S Console, accessories or optional storage S On unit


Hazard devices could fall on patient, operator, or service
rep. S Moving unit instructions

S Collision with persons or objects could result in S Raising unit with jack screws
injury while maneuvering or transporting the
system.
S Injury while moving or lifting the console

Acoustic S Injury or tissue damage from ultrasound S system performance check


Output radiation
Hazard

Smoke S Injury or adverse reaction from fire or smoke. S Replacing fuses


& Fire S Mains supply
Hazard

Non– S Failure, erratic operation or output error due to S RF leaks


Ionizing RF interference to or from other electrically
operated equipment S shields and enclosures
Radiation
S grounding

1– 4
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–2–3 Product Icons


These icons and labels that can be found on the LOGIQ 700 are shown and defined in Table . The V1 LOGIQ t
700 console is rated as a TYPE B unit; the V2 and later are type BF. The probe interface (XDIF) is rated BF on all
consoles.
TABLE 1–2
PRODUCT ICONS (Sheet 1 of 2)

Label Definition Location

Rating Plate
Reports important manufacturing information about S rear of unit, near AC cord
S under monitor
the equipment. A V1 unit is hardware model
Made in the 46–312100G(n). A V2 unit is the hardware model for
S on each probe
USA EMC and it is identified by 2132700(–n). The V3 unit
has 16 channel TDs and is model 2148800(–n).
Certification label Laboratory logo or labels denoting conformance with S rear of unit
S under front of monitor
meets our stan- industry safety standards such as ETL, TUV, or IEC.
dards
This precaution is intended to prevent injury that may
result if only one person attempts to move the unit
S rear of unit
considerable distances or on an incline due to the
weight of the unit.

Equipment Type B (man symbol) IEC 878-02-02


indicates equipment having a common degree of
S rear of V1 unit (46–model)
protection from electric shock.
Class 1
Equipment Type BF (man in the box symbol) IEC S near XDIF connectors
S non-surgical probe
878-02-03 indicates B Type equipment having even
more electrical isolation than Type B because it is
intended for intimate patient contact.
S rear of V2 unit (2132700) or
V3 (2148800)
Equipment Type CF (heart in the box symbol) IEC
878-02-05 indicates equipment having a high degree
S surgical probe
of protection, electrical isolation, suitable for direct
cardiac contact.
The CE Mark of Conformity indicates this machine
conforms with the Council Directive 93/42/EEC
S rear of V2 or V3 unit
0459
Testing Lab in New York, USA, has verified the
machine conforms to UL 544 standard for medical and
S rear of unit
dental equipment and Canadian standard 601 for
R electromedical equipment.
CLASS A means the machine is intended for
commercial, not residential, use.
S rear of V2 or V3 unit
GROUP 2 means the machine intentionally uses
CISPR 11 / EN 55011 Radio Frequency. GROUP 1 means it creates RF
CLASS: A GROUP: 2 unintentionally because it is an electronic device.
CLASSE: A GROUPE: 2
t
The LOGIQ 700 is not designed for use near S rear of unit
flammable anesthetic gases.

1– 5
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

TABLE 1–2
PRODUCT ICONS (Sheet 2 of 2)

Label Definition Location


Top symbol means pressing the switch at this end will S front of unit: On/off switch
apply AC power to the unit. On this unit, it will also boot
the software.

Bottom icon means pressing the switch at this end will


remove AC power to the unit after the solid state relay,
but up to that point AC power is still present.

You must disconnect the power cord or set the


MAINS circuit breaker, CB1, off which is all the way
down, to disconnect AC power to unit.
Round symbol indicates the switch side that removes S AC off circuit breaker (CB1)
AC power
Dangerous voltage or amperage present S behind cover trim to warn that
electrical power inside all
covers is dangerous

Refer to detailed instructions in the Service Manual S rear cover

S bulkhead

S top edge of lower front cover


under trim guard
S on frame in three places
This label warns that electronic part failure is possible S on electronic parts
due to damage caused by dissipation of large electrical
potential differences. It warns you to practice ESD S parts handling, packaging,
prevention. See page 1– 16. servicing instructions
This label is a reminder to the service person that the S on the XDIF assembly near
linear bearing that drives the control panel up and down the gas spring
is under pressure and should be blocked when the
gas spring is removed.

Indicates AC MAINS potential. S product schematics

S PS1 (bulk converter)

S peripheral back panels


Indicates Main protective earth terminal S AC distribution panel

S product schematics

Indicates an earth GROUND potential. S product schematics

S peripherals
Indicates EQUIPOTENTIALITY. S rear of unit

1– 6
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–3 SAFETY CONSIDERATIONS

1–3–1 Human Safety


Biological
Hazard

DANGER Neurological procedures must NOT be done on patients with


Creutzfield–Jacob disease because there is no way to adequately sterilize
a probe that has been used this way.

WARNING Neurological procedures must be and intraoperative should be done with


the use of legally marketed, sterile, pyrogen free probe sheaths.

WARNING Probes used during neurological surgery must NOT be sterilized with
liquid chemical sterilants because of the possibility of neuro toxic
residues remaining on the probe.

CAUTION Do not handle soiled or contaminated equipment. Illness or infection may


result. Probes and related accessories must be cleaned and disinfected
according to the user instructions before servicing.

Acoustic
Output
Hazard

CAUTION The ultrasound energy from this system can produce heat and mechanical
injury in tissue when operated at maximum acoustic power settings. This
system conforms to AIUM, NEMA, and FDA standards for output display
and control. It is capable of producing output levels higher than older
abdominal and general purpose systems. To avoid possible injury, the
operator must become familiar with all system controls and, in particular,
the operation of the acoustic output control and display.

Note
Refer to the User’s Manual for complete user instructions.

1– 7
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–3–2 Mechanical Safety

DANGER Should you need to replace a rear wheel, follow the removal and
installation procedures given in Section 5. The rear wheel assembly has
two springs. If the wrong screws are removed, the springs can cause the
assembly to disintegrate with explosive force.

WARNING When the unit is raised for a repair or moved along any incline, use
extreme caution since it may become unstable and tip over if positioned at
angles greater than 10_.

WARNING Ultrasound probes are highly sensitive medical instruments that can easily
be damaged by improper handling. Use care when handling and protect
from damage when not in use. DO NOT use a damaged or defective probe.
Failure to follow these precautions can result in serious injury and
equipment damage.

CAUTION The LOGIQt 700 weighs approximately 300 kg (660 lbs). Care must be
used when moving it or replacing its parts. Failure to follow the
precautions listed below could result in injury, uncontrolled motion and
costly damage. ALWAYS:
Be sure the pathway is clear.
Use slow, careful motions.
Use two people when moving on inclines or lifting more than 23 kg (50 lb).

Note
Special care should be taken when transporting the unit in a vehicle:

Secure the unit in an upright position.


DO NOT use the Control Panel as an anchor point.
Place the probes in their carrying case.
Eject any magneto optical drive (MOD) disk from the MOD.

CAUTION The control panel can be elevated by pressing the actuator button that
pulls down the top bracket of the gas spring that places the linear bearing
under pressure in the upward direction. Take care when you activate this
gas spring. You could be hit by the panel or hurt your hand by upward
movement of the linear bearing after the panel is removed and the spring
pressure is released. Take care when you repair the elevation assembly.

Monitor. Keep the heat venting holes unobstructed to avoid overheating of the monitor.

1– 8
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–3–3 Electrical Safety

DANGER Only qualified service personnel should remove any covers or panels.
Electrical hazards exists at several points inside including the AC
distribution assembly, two backplanes, three power supplies, isolation
transformer, and circuit boards. Become thoroughly familiar with all
hazardous voltages and high current levels to avoid accidental contact.

WARNING High current power supplies even at 5 volts can cause welding of leads,
jewelry or other conductive materials.

Safe Practices. There are additional rules to protect the service person, operator and patient from exposure to
dangerous electric power.

D Only connect the unit to a properly grounded, hospital grade power outlet. Do not use a three to two
prong adapter. This defeats safety grounding.

D Do NOT use a 20 Amp to 15 Amp adapter on 120 Vac machines that require a 20 Amp cord.
D To prevent dangerous leakage currents, do NOT use an extension cord or non–listed peripherals that
have not been certified.

D When ESD protection is needed (replacing boards and drives), the service person should be trained in
the electrical hazards of this unit, wear the ESD wrist strap and leave the unit plugged to maintain
ground.

CAUTION If you connect the LOGIQt 700 to a network, isolate the LOGIQt 700 from
that network by placing a user provided 500 V isolation device between the
Bulkhead Ethernet connector and the network T connector. The LOGIQt
700 has stricter isolation requirements than computers.

ONE EXAMPLE OF A
USER PROVIDED SERVICE ETHERNET
ISOLATION DEVICE 8 1
1 5
6 9 15 9
P P P
O O O
R R R
T T T
AUI Transceiver 1 2 3

PRINT VIDEO OUT

Also, do NOT disconnect


! network here or here because
you will open the site’s network.

1– 9
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–3–3 Electrical Safety (Continued)

WARNING Ultrasound transducers can be easily damaged by improper handling.


Failure to follow these precautions can result in serious injury and
equipment damage.

Probes. A powered probe could injure someone if its internal parts contact a person through a conductive solution
or a break in the isolating material. Therefore:

D DO NOT immerse a probe into any liquid beyond the level indicated by the immersion level diagram
shown on its care card and the operators manual.

D DO NOT immerse a probe into any solution containing acetone, alcohol, bleach, detergent, iodine, or
hydrogen peroxide because these can break down its isolation. Avoid gels containing mineral oil or
lanolin.

D DO NOT drop probes or subject them to other types of mechanical shock or impact. Degraded
performance or damage such as cracks or chips in the housing may result.

D DO NOT kink, tightly coil, or apply excessive force on the probe cable. Insulation failure may result.
D Inspect the probe before and after each use for damage or degradation to the housing, strain relief,
lens, and seal. A thorough inspection should be conducted during the cleaning process.

D Perform electrical current leakage tests on a routine basis to check for cracks or other small defects.
D Avoid storage or cleaning temperature above 60_C (140_F).

1– 10
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–3–4 Label Locations


There are a number of labels on the LOGIQ 700. These labels provide important information. If the labels are worn
or missing, new labels should be ordered and installed. Illustrations 1–1 through 1–3 show these labels and their
locations.

SUPPLIER MADE IN
COUNTRY
MODEL
SERIAL NR.
On MANUFACTURED
Stand–by
Switch PRODUCT COMPLIES WITH D.H.H.S.
RULES 21 CFR SUBCHAPTER J.

ACHTUNG: DIESE IN DIESEM GERAT


ENTSTEHENDE RONTGEN STRAHLUNG
IST AUSREICHEND ABGESCHIRMT.
BESCHLEUNIGUNGSSPANNUNG...

Monitor
Certification

Shock Hazard
Behind Trim Cover TYPE BF
and on frame above IEC 878–02–03
the Back End cage, Probe Interface
below the Front End isolation level
boards and back-
plane too

ON
DANGEROUS VOLTAGE IEC 878–01–01
ATTENTION, CONSULT... IEC 878–03–01 0FF STAND–BY
IEC 878–03–02 IEC 878–01–02 IEC 878–01–05

LABELS FOUND ON FRONT OF LOGIQ 700


ILLUSTRATION 1–1

1– 11
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–3–4 Label Locations (Continued)

ETL TESTED
CAUTION CONFORMS TO
R UL STD 544 c
CERTIFIED TO
R
93182
Caution: United States law restricts CAN/CSA C22.2 NO.601–1
this device to sale or use by or on ETL LABORATORIES, INC.
the order of a physician. CORTLAND, NEW YORK 13045

DANGER – Explosion Hazard


Do not use in the presence
of flammable anesthetics. Back
(Near Ground Panel
Danger – Risque d’explosion. Ne Stud) (bulkhead)
pas employer en presence
d’anesthesiques inflammables. CAUTION: Power outage may occur.
To avoid circuit overload and possible loss of
Air Inlet
critical care equipment, make sure you DO
NOT have any other equipment operating on
300 kg the same circuit.

(On power cord)


FOR PROPER GROUNDING CONNECT
non TO HOSPITAL GRADE RECEPTACLE.
300 kg
120
Vac unit
V1 unit
(Near Rat-
ing Plate) SCSI Consult Service
CLASS I Unit isola- (Next to Main devices Manual for
CLASSE I tion level V2/V3 Units Breaker CB1) and cables details about
GENERAL ELECTRIC COMPANY are ESD safety, video,
MILWAUKEE, WISCONSIN MADE IN U.S.A. (Below Service Outlet) sensitive audio values
MODEL 46–312100G1
S/N 367US4 and procedures
MANUFACTURED FEBRUARY 1995 120 V 2A

ËËËËËËËË
DESC LOGIQ 700
120V~

ËËËËËËËË
60Hz 16A
Maximum Rating
(of Service Outlet Rating Plate(s) for Options
System Rating Plate and Barcode capacity) Identify optional software and
Specific to Configured Mains (Not present if Service
hardware; located on flat part of
Outlet replaced by CB4)
Voltage and located below where frame above the power supplies
AC power cord attaches

0459
EQUIPOTENTIALITY V2 ( 2132700–n ) and V2 and V3 units are TYPE B
IEC 878–01–24 V3 (2148800–n) units CLASS A GROUP II Class 1
qualify for this rating devices IEC 878–02–02
LABELS FOUND ON BACK OF LOGIQ 700
ILLUSTRATION 1–2

1– 12
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–3–4 Label Locations (Continued)


Do not attach an AMA Probe Connector and Probe
probe to the far right slot Cradle
! on the XDIF. An AMA
probe in that slot is
vulnerable to damage.

XDIF asm Probe ID


“326s”

also frequency
for France

Manufacturer’s Name OR
and address
FREQUENCY 5.0/D3.5–5.0 MHz FOR SURGICAL
MODEL NO PROBES
SERIAL NO 12345YM6 shows isolation level
JUNE 1994
Refer to probe care card and Operator Manual
FRAGILE for complete instructions on proper handling
Probe Rating Plate

TYPE BF TYPE CF ATTENTION, CONSULT...


IEC 878–02–03 IEC 878–02–05 IEC 878–03–02

LABELS FOUND ON PROBES


ILLUSTRATION 1–3

1– 13
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–3–5 Lockout/Tagout Procedures

Electrical. The service person is responsible for the control of electrical energy to the unit. When installation, repair
or maintenance is needed, when contact with internal parts is possible, and when ESD protection is not required, the
service person controls the energy to the unit by unplugging the AC power cord from the outlet and keeping exclusive
control of that cord while installing, servicing or maintaining the unit. Service people who are trained in electrical safety
and the particular hazards that this unit presents are qualified to replace ESD sensitive parts which entails keeping
the unit plugged to ensure a good ground for the ESD wrist strap.

Step Procedure
1 Determine possible risk of contact with dangerous energy.
2 If any risk exists, unplug AC power cord from outlet.
3 Do not allow anyone to connect the cord until you are done.

CAUTION:
Stored Mechanical Energy

To prevent injury or damage to


electronics, the linear bearing must be
supported when gas spring is removed.

Mechanical. When removal of the gas spring is needed, take care to not allow the linear bearing to fall down on
you. You should raise the linear bearing to its highest elevation to facilitate gas spring removal, but be sure to block
the fall of the linear bearing with a piece of wood or similar device that will occur once the gas spring is removed.

1– 14
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–4 EMC, EMI, AND ESD

1–4–1 Electromagnetic Interference (EMI)


ElectroMagnetic Interference (EMI) describes the energy that is emitted or conducted from an operating electronic
system. This energy can be in many forms. It can be radio frequency (RF) waves, magnetic fields, electrical potential
variations, electrical current leakage.

1–4–2 Electromagnetic Compatibility (EMC)


ElectroMagnetic Compatibility (EMC) describes an electronic system that curbs the electromagnetic influence
between electronic systems. This means it minimizes how much electromagnetic energy it emits or conducts into the
surroundings so that this energy is not dangerous nor distorts its own or another system’s operation. It means it
minimizes the electromagnetic interference from itself or other electronic systems.

D Only use power and signal wiring provided or specified by GE Medical Systems. Never use an adaptor
to connect a power source plug. Do not change cable length or material. Use of cables not properly
shielded and grounded may result in the equipment causing or responding to radio frequency
interference in violation of the European Union Medical Device Directive (CE mark) and FCC
regulations.
D Use the peripherals specified by GE Medical Systems. Do NOT allow the monitor or peripheral cables
to lie across the top of the Front End cage.
D Locate the unit as far as possible from other electronic equipment.
D Install the unit, peripherals, and replacement parts only as detailed in the Preinstallation Checks,
Installation Chapter, Assembly Chapter, Renewal Parts Chapter, and the Peripheral Install manual.
Use CE certified parts.
D Reinstall all hardware before returning the unit to clinical use.
D If unit is connected to a network, use only CE marked components for hubs, transceivers, peripherals,
modems. Make sure transceiver is LOCKed into place on bulkhead (Ethernet) AUI connector.
D It is recommend that coax wire is used to connect ethernet to hub. FIBER OPTIC IS BEST for
problem sites but expensive and requires an optical HUB. If unshielded twisted pair (UTP) is
used, wrap a ferrite ring or clamp to cable.

1–4–3 CE Compliance
The V2 and V3 LOGIQt 700 units conform to all applicable conducted and radiated emission limits and to immunity
from electrostatic discharge, radiated and conducted RF fields, magnetic fields and power line transient requirements.
Applicable standards are: 47CFR Part 18, IEC 601–1–2, and 806–13.

CISPR 11 / EN 55011
CLASS: A GROUP: 2
0459 CLASSE: A GROUPE: 2

ATTENTION For CE Compliance, it is critical that all covers, screws, shielding, gaskets,
! mesh, clamps, are in good condition, installed tightly without skew or
stress. Proper installation following all comments noted in this service
manual is required in order to achieve full EMC performance.

1– 15
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–4–4 Electrostatic Discharge (ESD) Prevention


The circuit boards and disk drives for this system contain densely populated
electronic components which are expensive and electrically sensitive. An
electrostatic discharge (ESD) between 100 to 1000 V may damage a
component. This is substantially less than the 3000 V discharge needed to feel
any static. The ESD may cause an immediate failure, or it may weaken
components to produce future, intermittent problems.
Proper Handling. Always use the ESD strap. Put the board or drive inside an anti–static bag or approved container
before it is handled by a non–grounded person, moved from the grounded (ESD safe) area, or stored. Always place
the board or drive top side up on a flat surface when it is unmounted. Never handle the part outside its anti–static
container unless the surrounding surfaces and you are grounded. Discharge the outside of the container before
transferring the part.

TABLE 1–3
RULES FOR PREVENTING OR LESSENING ESD DAMAGE

ESD rule Details


Turn power OFF Turn power OFF before you touch, insert or remove parts having electronic
components.

Use wrist strap Unless you are working near a live 30 V or more circuit, ground your wrist to the
specially designed ground plug on the unit before you touch any parts. This includes
connecting cables to a drive, board, device, or bulkhead.

Test your strap while wearing it with a specially designed meter. If it fails, it may
be due to dry skin; apply lotion to your wrist and test again. Throw away any strap that
is more than three months old.

Don’t let anything Do not let your sleeve, tie, pen, Styrofoam cup, plastic manual binder or clothing touch
but your grounded the circuit board or disk drive. Wearing cotton clothes and shoes with rubber like soles
hand touch the may lessen how much ESD you generate walking across the room. Working in a room
electronic FRU where relative humidity is under 20% can generate electrostatic voltages of 7000 to
35,000 Volts. However it only takes 100 V to destroy an EEPROM.

Use proper han- Handle circuit boards, disk drives, or any electronic part as little as possible. Place
dling them on an anti–static workbench pad or in a static dissipative bag that you have
t
grounded. Do not stack them. LOGIQ 700 boards should be stored in an
anti–static container. Pink, blue, or clear poly bags do NOT give protection from
external sources of ESD. If you have an anti–static box, you can use the box as a
static free work surface once you ground it.

Treat failed parts You don’t want to add to the expense, complication and future unreliability of a part by
the same as good allowing it to be repeatedly zapped.

Use a special When you use a vacuum, be sure it is the type that prevents electrostatic buildup.
vacuum

1– 16
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

1–5 CUSTOMER ASSISTANCE


TABLE 1–4
PHONE NUMBERS FOR CUSTOMER ASSISTANCE

Location Phone Number Comments


For GE Service If this equipment does not work as indicated in
the Operators Manual, contact your Support
USA (1) 800–437–1171 Center. Have the system ID number available
when you call.
CANADA (1) 800–668–0732

LATIN & SOUTH AMERICA (1) 305–735–2304

JAPAN (81) 426–56–0019


Contact your European distributor or GE
EUROPE representative.
Ultrasound Applications The phone number is for non emergency
purposes only since you may not receive an
USA (1) 800–682–5327 immediate response.
Diagnostic Imaging If you need information about an accessory,
Accessories (DIA) contact DIA.

USA (1) 800–472–3666


Direct Customer Order If the customer has a need for parts ID or parts
Service (DCOS) ordering, contact DCOS.

USA (1) 800–558–2040

If you remove any The Part Number is silkscreened on


circuit boards, practice the board usually near the bar code
good ESD prevention. which holds the part’s Serial
Also check pins, Number. You may need to refer to
connectors and these labels to complete site
paperwork or answer questions from
backplane connectors
Support Center. Do not use any
for dust or dirt. These
number that ends in a ‘P.’ If it is a
items can cause
‘46–’ Part Number, it will end in ‘G.’
system failures.
Possible GE MEDICAL SYSTEMS
Bar Code
Locations
BE1234

LOCATING PART NUMBERS ON CIRCUIT CARD


ILLUSTRATION 1–4

1– 17
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

intentionally blank

1– 18
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

2–1 PURPOSE OF SECTION


This section provides the information required to plan and prepare for the installation of a LOGIQ 700. t
Included are descriptions of the facility and electrical needs to met by the purchaser of the unit. A checklist
is also provided at the end of this section to help determine whether the proper planning and preparation
is accomplished before the actual equipment installation is scheduled.

2–2 GENERAL INFORMATION

2–2–1 Time and Manpower Requirements


Site preparation takes time. Begin Preinstallation checks at least six weeks prior to the desired delivery date to allow
enough time to make any changes.

Have two people available to deliver and unpack the LOGIQ 700. t
Attempts to move the unit considerable distances or on an incline by one
person could result in injury or damage or both.

2–2–2 Important LOGIQ 700 Characteristics


Physical Dimensions. The physical dimensions of the LOGIQ 700 unit are summarized in Table 2–1 and
Illustration 2–1.

TABLE 2–1
PHYSICAL DIMENSIONS OF LOGIQ 700

Dimension Console Size Shipping Size


Height 1510 mm (60 in) 1730 mm (68 in)
Width 656 mm (26 in) 870 mm (34 in)
Depth 1207 mm (48 in) 1420 mm (56 in)
Weight 360 kg (800 lb) 400 kg (880 lb)

2–2
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

2–2–2 Important LOGIQ 700 Characteristics (Continued)

1510 mm

1207 mm 656 mm

ENVELOPE DIMENSIONS FOR LOGIQ 700


ILLUSTRATION 2–1

Floor Load. Given the unit’s weight, distance between its wheels, and estimating the on board peripheral weight,
the floor load is approximately 1500 kg/m2 (300 lbs/ft2).

Acoustic Noise Output. The acoustic noise output is 60 dB max when measured at 0.45 m (1.5 ft) from the operator
panel at a height of 1.52 m (5 feet).

2–3
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

2–2–3 EMI Limitations


Ultrasound machines are susceptible to electromagnetic interference from radio frequencies, magnetic fields, and
t
transients in the air or wiring. They also generate EMI. The LOGIQ 700 complies with limits for a Group 2, Class
A Medical Device as stated in EN 60601–1–2. However there is no guarantee that interference will not occur in a
particular installation.

Possible EMI sources should be identified before the unit is installed. Electrical and electronic equipment may produce
EMI unintentionally as the result of a defect. These sources include medical lasers, scanners, cauterizing guns,
computers, monitors, fans, gel warmers, microwave ovens, light dimmers and portable phones. The presence of a
broadcast station or broadcast van may also cause interference.

TABLE 2–2
EMI PREVENTION/ABATEMENT

EMI rule Details


Be aware of RF Keep the unit at least 5 meters or 15 feet away from other EMI sources.
sources Special shielding may be required to eliminate interference problems caused
by high frequency, high powered radio or video broadcast signals.
Ground the unit Poor grounding is the most likely reason a unit will have noisy images. Check
grounding of the power cord and power outlet.
Replace all After you finish repairing or updating the system, replace all covers and
screws, RF tighten all screws. On a V2/V3 unit any cable with an external connection
gaskets, covers, requires a magnet wrap at each end. Tightly wrap the mesh around the I and
cores Q connectors on the SS. Install the shields over the front of both card cages.
Loose or missing covers or RF gaskets allow radio frequencies to interfere
with the ultrasound signals.
Replace broken If more than 20% or a pair of the fingers on an RF gasket are broken, replace
RF gaskets the gasket. Do not turn on the unit until any loose metallic part is removed.
Do not place Never place a label where RF gaskets meet the unit. Otherwise, the gap
labels where RF created will permit RF leakage. Or, if a label has been found in such a
gaskets touch position, move the label.
metal
Use GE specified In a V2 or V3 unit, the interconnect cables are grounded and require EMI
harnesses and magnets and other shielding. Also, cable length, material, and routing are all
peripherals important; do not change from what is specified.
Take care with Cellular phones may transmit a 5 V/m signal; a signal greater than 3 V/m
cellular phones could cause image artifacts. Use a regular phone within 5 m (16 ft) of the unit.
No power line Filters placed between the power main and unit may cause problems; do not
filters use one unless authorized by GE Engineering.
Properly dress Do not allow cables to lie across the top of the Front End cage. Loop the
peripheral cables excess length for peripheral cables inside the right end of peripheral cover.
Attach the monitor cables to the frame.

2–4
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

2–2–4 Purchaser Responsibilities


The work and materials needed to prepare the site is the responsibility of the purchaser. Delay, confusion, and waste
of manpower can be avoided by completing preinstallation work before delivery. Use the Preinstallation checklist to
verify that all needed steps have been taken. Purchaser responsibility includes:

D Procuring the materials required.


D Completing the preparations before delivery of the ultrasound system.
D Paying the costs for any alterations and modifications not specifically provided in the sales contract.
D Paying the phone line installation and monthly phone line charges
Note
All electrical installations that are preliminary to the positioning of the equipment at the site prepared
for the equipment must be performed by licensed electrical contractors. Other connections between
pieces of electrical equipment, calibrations, and testing must also be performed by qualified
personnel. The products involved (and the accompanying electrical installations) are highly
sophisticated and special engineering competence is required. All electrical work on these products
must comply with the requirements of applicable electrical codes. The purchaser of GE equipment
must only utilize qualified personnel to perform electrical servicing on the equipment.

The desire to use a non–listed or customer provided product or to place an approved product further from the system
than the interface kit allows presents challenges to the installation team. To avoid delays during installation, such
variances should be made known to the individuals or group performing the installation at the earliest possible date
(preferably prior to the purchase).

For reference purposes, the list of approved peripherals at the publishing date of the last revision of this manual is:

D Sony Video Camera Recorder (VCR), SVO9500MD2


D Sony Color Printer, UP1800MD
D Sony Color Printer, UP2950MD
D Sony Color Printer, UP5600MD
D IIE Multi–image Camera, MP460II
D Sony Monochrome Printer, UP890MD
The ultrasound suite must be clean prior to delivery of the machine. Carpet is not recommended because it collects
dust and creates static. Potential sources of EMI (electromagnetic interference) should also be investigated before
delivery. Dirt, static, and EMI can negatively impact system reliability.

2–5
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

2–3 FACILITY NEEDS


A recommended floor plan that uses a 4.3 by 5.2 meter (14 by 17 foot) area is shown in Illustration 2–2. Another
floor plan that uses a minimal 2.5 by 3 meter (8 by 10 foot) area is shown in Illustration 2–3.

2–3–1 Required Features


D Dedicated single branch power outlet of adequate amperage (see Electrical Requirements on page
2–9) meeting all local and national codes is less than 2.5 m (8 ft) from the unit’s proposed location

D Door opening is at least 76 cm (30 in) wide


D Proposed location for unit is at least 0.3 m (1 ft) from the wall for cooling
D Power outlet and place for any external peripheral are within 2 m (6.5 ft) of each other with peripheral
within 1 m of the unit to connect cables.
The LOGIQt 700 has four outlets inside the unit. One is for the monitor and
three for on board peripherals.
D Power outlets for other medical equipment and gel warmer
D Power outlets for test equipment and modem within 1 m (3.2 ft) of unit
D Clean, protected space to store transducers (in their cases or on a rack)
D Material to safely clean probes (done with a plastic container, never metal)
D For InSite to be installed, the site needs either a dedicated, analog phone line with a modular jack for
the modem or a GE InSite Multiplexer setup.

2–3–2 Desirable Features


D Door is at least 92 cm (3 ft) wide
D Circuit breaker for dedicated power outlet is easily accessible
D Sink with hot and cold water
D Receptacle for bio–hazardous waste, like used probe sheaths
D Emergency oxygen supply
D Film viewer
D Storage for linens, film, equipment
D Nearby waiting room, lavatory, and dressing room
D Dual level lighting (bright and dim)
D Lockable cabinet ordered by GE for its software and proprietary manuals

2–6
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

Dedicated analog phone line


or GE InSite Multiplexer Dedicated power outlet
Power outlet optional
GE cabinet

Peripheral(s)
Film for software

External
Processing and manuals
Room
LOGIQ

Examination Table
700

Probes/PM
Linens
Film Viewer

Cabinet
File Counter

193 cm
Top
Stool

Sink
Suction
Line
61 cm
Emergency
Oxygen
Desk

Scale: each square


equals one square foot 107 cm
42 in
RECOMMENDED (14 BY 17 FEET) FLOOR PLAN
ILLUSTRATION 2–2

Film Viewer Linens


Sink
Film Supplies Probes/supplies
Power outlets
External
Peripheral(s)

LOGIQ
Stool 700
Dedicated power outlet
61 cm

Examination Table GE cabinet


for software
193 cm and manuals
76 cm (optional)
30 in
MINIMAL(8 BY 10 FEET) FLOOR PLAN
ILLUSTRATION 2–3

2–7
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

2–3–3 Environmental Limits


t
In order for the LOGIQ 700 to operate well, the unit’s operating environment must be controlled. Care also must
be taken when a unit is transported or stored. Avoid humidifiers because their moisture damages electronic parts.
The environmental limits for operation, storage, and transport are listed in Table 2–3.

TABLE 2–3
LOGIQ 700 ENVIRONMENTAL LIMITS

Temperature Humidity Maximum Altitude


Patient Comfort 20 to 26_C (68 to 79_F) 50 to 70% noncondensing
Operational 15 to 30_C (59 to 86_F) 5 to 85% noncondensing 3050 m (10,000 ft)
Storage 0 to 55 _C (30 to 130_F) 5 to 85% noncondensing 3050 m (10,000 ft)
Transport (for less –20 to 55_C 5 to 85% noncondensing 10,600 m (35,000 ft)
than 16 hrs) (–4 to 130_F)

After being transported, the unit may be very cold or hot. If a very cold machine is operated, condensation will form
on the electronic components which could damage the hard drive, VCR, or circuit boards. If a very hot machine is
turned on, the host will shut down operation, or the power supplies will stop working. Electronic components could
fail; plastic parts could deform.

If a unit arrives too hot or cold (outside the Operational Temperature Range, allow the unit to acclimate before applying
power. A one hour wait is recommended for each 2.5_C increment the unit’s temperature is below 15_C or above
30_C. However, a wait of one hour per 15_C increment the temp is outside the unit’s operating range may
be okay. A summary of these waiting times is provided in Table 2–4.

TABLE 2–4
WAITING TIME PRIOR TO OPERATING A UNIT THAT ARRIVES TOO HOT OR COLD

_C –40 –35 –30 –25 –20 –15 –10 –5 0 5 10 15 20 25 30 35 40 45 50 55


_F –40 –31 –22 –13 –4 5 14 23 32 41 50 59 68 77 86 95 104 113 122 131
Best hrs 22 20 18 16 14 12 10 8 6 4 2 0 0 0 0 2 4 6 8 10
OK hrs 3.6 3.3 3 2.6 2.3 2 1.6 1.3 1 .6 .3 0 0 0 0 .3 .6 1 1.3 1.6

2–3–4 Cooling
The cooling requirement for the LOGIQt 700 is 6500 BTU/hr. This figure does not include cooling needed for lights,
people, or other equipment in the room. Each person in the room places an additional 300 BTU/hr demand on the
cooling system.

2–3–5 Lighting
Bright light is needed for system installation, updates and repairs. However, operator and patient comfort may be
optimized if the room light is subdued and indirect. Therefore a combination lighting system (dim/bright) is
recommended. Keep in mind that lighting controls and dimmers can be a source of EMI which could degrade image
quality. These controls should be selected to minimize possible interference.

2–8
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

2–4 ELECTRICAL NEEDS

2–4–1 LOGIQ 700 Power Configurations


The LOGIQ 700 can be configured to any of the nominal power ratings listed in Table 2–5.

TABLE 2–5
LOGIQ 700 POWER RATING CONFIGURATIONS

system power peripheral power V1 model V2 model V3 model


120 V 20 Amp line 500 VA allocated for 120 V peripherals 46–312100G1 2132700
220 V 10 Amp line 500 VA allocated for 120 V peripherals 46–312100G2 2132700–2 2148800–2
240 V 10 Amp line 500 VA allocated for 240 V peripherals 46–312100G3 2132700–3 2148800–3
200 V 10 Amp line 500 VA allocated for 100 V peripherals 46–312100G4 2132700–4
200 V 10 Amp line 500 VA allocated for 120 V peripherals 46–312100G5 2132700–5
120 V 20 Amp line 15A plug *500 VA allocated for 120 V peripherals 46–312100G6 2132700–6 2148800
100 V 15 Amp line 500 VA allocated for 100 V peripherals 2148800–4
* Includes power used by monitor

2–4–2 Inrush Current


For a 120 Vac V1 unit, inrush current is 150 to 175 A for up to four ms. For all other power configurations, including
V1 units with the Soft Start design, inrush will be less than 70 A.

2–4–3 Site Circuit Breaker

CAUTION POWER OUTAGE MAY OCCUR


t
The LOGIQ 700 requires a dedicated single branch circuit. To avoid
circuit overload and possible loss of critical care equipment, make sure
you DO NOT have any other equipment operating on the same circuit.

It is recommended that the branch circuit breaker for the machine be readily accessible. It should have at least a five
times the rated current tolerance.

2–4–4 Site Power Outlets


A dedicated AC power outlet must be within reach of the unit without extension cords. Other outlets adequate for the
external peripherals, medical and test equipment needed to support this unit must also be present within 1 m (3.2 ft)
of the unit. Electrical installation must meet all current local, state, and national electrical codes.

2–4–5 Unit Power Plug


If the unit arrives without a power plug, or the wrong plug, the installation engineer must supply what is locally required.

2–4–6 Power Stability Requirements


Monitor the site’s line voltage for a week before installation. The voltage should be stable, remaining within 10 % of
the unit’s rated value. In addition, line frequency should fall between 47 and 63 Hertz.

Power transients must be less than 25% over nominal peak voltage for less than 1 ms for any type of transient. This
includes line frequency, synchronous, asynchronous, or aperiodic transients.

Note
If the site’s power line voltage does not meet the requirements outlined, it is suggested that a ferro
resonant Uninterruptable Power Supply (UPS) be provided. A tap switching line conditioner is not
recommended because the switching transients can exceed the limits specified for the LOGIQ 700.

2–9
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

2–5 DICOM OPTION PRE–INSTALLATION REQUIREMENTS

2–5–1 Information Required from Customer’s Network Administrator


t
To configure the LOGIQ 700 to work with other network connections, the site’s network administrator
must provide information to complete the form in Illustration 2–4. Ensure that there are no spaces in any
field of the form except for those fields under PHYSICAL LOCATION. Entries must include:

D A host name, local port number, AE Title, IP address and Net Mask for the LOGIQt 700.
D The IP addresses for the default gateway and other routers at the site for ROUTING INFORMATION
D The host name, IP address, port and AE Title for each device the site wants connected to the
LOGIQt 700 for DICOM APPLICATION INFORMATION.

LOGIQ 700
Host Name Local Port IP Address . . .
AE Title
Net Mask . . .

ROUTING INFORMATION GATEWAY IP Addresses


Destination
IP Addresses Default . . .

ROUTER1 . . . . . .
ROUTER2 . . . . . .
ROUTER3 . . . . . .
DICOM APPLICATION INFORMATION
NAME AE TITLE IP ADDR PORT
Store 1 . . .
Store 2 . . .
Print 1 . . .
Print 2 . . .
Print 3 . . .
Print 4 . . .
Sched . . .

PHYSICAL LOCATION
Store 1
Store 2
Print 1
Print 2
Print 3
Print 4
Sched

WORKSHEET FOR DICOM NETWORK INFORMATION


ILLUSTRATION 2–4

2–10
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

2–5–2 Information Required from LOGIQ 700 User


With the DICOM Option, both the locally connected peripherals and remotely connected DICOM devices can be used
by the operator. With system software version R6.2 or later, four keystroke combinations can be assigned to print or
copy images. Each one of these keystroke combinations can cause more than one action to occur at the same time.
And, the multiple actions can include both local and remote events.

The customer must specify the actions that each of four keystroke combinations will initiate. Make a note of these
actions and the associated device’s name and IP address or other details that may be helpful.

Device Name P1 P2 Shift+ Shift+


P1 P2

Choose only one per key:

This key will send GRAY image file


This key will send COLOR image file
Choose only one per key:

save image on Hard Drive


copy image to MOD
Choose only one per key:
Must choose at least one in the group above or below this remark for asterisk in first group

print image to device connected to Port 1


print image to device connected to Port 2
print image to device connected to Port 3
print image to device connected to Print
print image to device connected to Expose
Choose only one per key:

print image to DICOM device A


print image to DICOM device B
print image to DICOM device C
print image to DICOM device D
Can choose both per key:

Store image on DICOM workstation A


Store image on DICOM workstation B

WORKSHEET FOR USER NETWORK PREFERENCES


ILLUSTRATION 2–5

2–11
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

intentionally blank

2–12
GE MEDICAL SYSTEMS LOGIQ 700 BASIC SERVICE MANUAL
REV 5 Direction 46–030402

Sales/Service Preinstallation Checklist

Scheduled Arrival Date Salesperson

Customer FDO #

Equipment Room #

YES NO n/a Requirements Checklist


Electrical
To avoid circuit overload and possible loss of critical care equipment, no other
equipment can be on the same circuit. A dedicated single branch outlet of adequate
amperage that meets all local and national electrical codes MUST BE available within
the range of the machine’s power cord. That cord can be 3 or 4.5 m (10 or 15 feet)
long.
Line voltage is within 10% of rated value. No transients greater than 25% over nominal
peak voltage nor longer than 1 ms in duration occur.
At least one outlet on another branch is available for power tools, test equipment, or
modem. That outlet must be within 1 m (3.2 ft) of the unit.
Outlets are available for the desired number of external peripherals. Each outlet must
be within 2 m (6.5 ft) of the related peripheral.
If the site requires a leakage current checkout by a biomedical electronic technician,
arrange an appointment with those involved and if possible with local service also.
Leakage Current test equipment is available. The 120 Vac machine that has a 20 A
plug may require a test adapter; the probe tests may require another.
Environmental/Facilities
Hardcopy of recommended layout and facilities is left with the customer.
No known sources of RFI/EMI or issues seen such as PC’s, alarm systems, medical
scanners, broadcast stations, broadcast vans in the area.
If sources of RFI/EMI are suspected, a site survey request has been made to the
Regional Ultrasound EMI Specialist.
If desired, a lockable storage cabinet for manuals/software has been ordered for the
site by the local service office. LG: 46–194427P299 SM: 46–194427P253
1) A Dial In Direct (DID) modular phone jack is within 1 m (3.2 ft) of the unit’s back
panel. Either an analog line without extensions or connections to a switchboard –or– 2)
a GE InSite Multiplexer will be installed.
The finished wall, floor (preferably not carpeted) and ceiling are installed. Door can be
locked. Room and corridors are dirt and dust free.
Room lighting is adequate. Both bright and dim lights are available.
The air conditioning is operating and stable. The machine alone requires 6500 BTU/hr.
Two people add about another 600 BTU/hr. Room temperature stays between 18 and
26_C (65 and 78_F).
Источник: https://www.scribd.com/doc/52198392/ULTRASONIDO-G-E-LOGIQ-700

2 Replies to “Office timeline 3.62 crack - Activators Patch”

  1. Como eu faço para scanear varias paginas por esse aplicativo, o meu está dando dizendo que falta folha

Leave a Reply

Your email address will not be published. Required fields are marked *